Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205H817 + (20:55:52, 7 December 2024)
- ML20205H816 + (20:55:53, 7 December 2024)
- 05000259/LER-1988-032-02, :on 880914,electrical Separation Requirements Violated.Caused by Inadequate Design Controls.Discrepancies Will Be Evaluated for Impact on Sys Required to Be Operational in Refueling Mode + (20:55:55, 7 December 2024)
- TXX-4950, Interim Deficiency Rept CP-86-49 Re Effects of polar-organic Solvents on Sealants in Conax Adaptor Modules & Electrical Penetrations.Initially Reported on 860711.Site Procedure Being Reviewed.Next Rept Will Be Submitted by 860916 + (20:55:56, 7 December 2024)
- IR 05000286/1986014 + (20:55:57, 7 December 2024)
- ML20205H805 + (20:55:58, 7 December 2024)
- ML20205H801 + (20:55:59, 7 December 2024)
- ML20205H799 + (20:55:59, 7 December 2024)
- ML20205H798 + (20:56:00, 7 December 2024)
- 05000302/LER-1986-011, :on 860722,control Rod Rendered Inoperable When Electricians Replaced Three Relays That Transfer Rod Position Indication Between Absolute & Relative.Tech Specs Voluntarily Entered Due to Planned Maint + (20:56:02, 7 December 2024)
- ML20205H792 + (20:56:04, 7 December 2024)
- ML20205H794 + (20:56:04, 7 December 2024)
- 05000311/LER-1986-005-02, :on 860715,during Reactor Startup,Voltage Spike Occurred on Vital Instrument Inverter 2B.Caused by Technician Connecting Leads Incorrectly.Technician Counseled.Procedure Revised + (20:56:06, 7 December 2024)
- ML20205H783 + (20:56:07, 7 December 2024)
- ML20205H781 + (20:56:08, 7 December 2024)
- ML20205H771 + (20:56:09, 7 December 2024)
- 05000327/LER-1988-035-01, :on 880927,auxiliary Bldg Isolation Occurred When Operator Inadvertently Tripped Circuit Breaker A. Cause Not Determined.Training Ltr Issued to All Licensed Operators Detailing Event + (20:56:11, 7 December 2024)
- ML20205H768 + (20:56:12, 7 December 2024)
- TXX-4937, Responds to IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps. Procedures Developed for Monitoring Fluid Conditions within Automatic Feedwater Sys,For Recognizing Steam Binding & for Restoring Sys to Operable Status + (20:56:12, 7 December 2024)
- ML20205H767 + (20:56:13, 7 December 2024)
- ML20205H763 + (20:56:20, 7 December 2024)
- ML20205H759 + (20:56:21, 7 December 2024)
- ML20205H758 + (20:56:22, 7 December 2024)
- ML20205H757 + (20:56:23, 7 December 2024)
- 05000352/LER-1987-007, :on 870223,discovered Eight Surveillance Test Procedures for Intermediate Range Monitor (IRM) Channel Functional Test Did Not Include Check of IRM Inoperative Function.Caused by Procedural Deficiency + (20:56:25, 7 December 2024)
- ML20205H752 + (20:56:26, 7 December 2024)
- ML20205H750 + (20:56:27, 7 December 2024)
- ML20205H749 + (20:56:28, 7 December 2024)
- ML20205H748 + (20:56:29, 7 December 2024)
- IR 05000461/1999007 + (20:56:30, 7 December 2024)
- 05000369/LER-1988-024, :on 880912,unit Entered Tech Spec 3.0.3 When Train a of ECCS & Train B of Component Cooling Sys Were Inoperable.Component Cooling 1B HX Failed Performance Test Because of Seasonal Environ Factors + (20:56:32, 7 December 2024)
- ML20205H743 + (20:56:33, 7 December 2024)
- ML20205H742 + (20:56:34, 7 December 2024)
- ML20205H737 + (20:56:35, 7 December 2024)
- ML20205H736 + (20:56:36, 7 December 2024)
- ML20205H735 + (20:56:37, 7 December 2024)
- ML20205H732 + (20:56:38, 7 December 2024)
- ML20205H731 + (20:56:39, 7 December 2024)
- ML20205H729 + (20:56:40, 7 December 2024)
- ML20205H730 + (20:56:40, 7 December 2024)
- ML20205H726 + (20:56:41, 7 December 2024)
- ML20205H727 + (20:56:41, 7 December 2024)
- ML20205H724 + (20:56:42, 7 December 2024)
- ML20205H723 + (20:56:43, 7 December 2024)
- ML20205H722 + (20:56:43, 7 December 2024)
- ML20205H716 + (20:56:46, 7 December 2024)
- BSEP-86-1059, Responds to Insp Repts 50-324/83-26 & 50-325/83-11 Re Fire Protection Improvement Program.Fire Protection Program Developed & Implemented + (20:56:47, 7 December 2024)
- ML20205H715 + (20:56:47, 7 December 2024)
- ML20205H711 + (20:56:48, 7 December 2024)
- ML20205H709 + (20:56:49, 7 December 2024)
- ST-HL-AE-1982, Advises That Monitoring of Main Cooling Reservoir (MCR) Instrumentation Continuing & Const of Addl Relief Wells Began on 870315.Completion of All MCR Remedial Work Expected in Oct 1987 + (20:56:49, 7 December 2024)