Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206G026 + (06:24:05, 7 December 2024)
- ML20206G028 + (06:24:05, 7 December 2024)
- 05000414/LER-1986-014-01, :on 860518,manual Reactor Trip Occurred When Turbine Tripped on hi-hi Steam Generator Level.Cause Unknown.Main Feedwater Isolation Reset.Main Feedwater Flow to Steam Generators Realigned + (06:24:07, 7 December 2024)
- ML20206G020 + (06:24:09, 7 December 2024)
- ML20206G021 + (06:24:09, 7 December 2024)
- ML20206G019 + (06:24:11, 7 December 2024)
- ML20206G018 + (06:24:12, 7 December 2024)
- ML20206G017 + (06:24:12, 7 December 2024)
- ML20206G015 + (06:24:13, 7 December 2024)
- ML20206G014 + (06:24:14, 7 December 2024)
- ML20206G008 + (06:24:18, 7 December 2024)
- ML20206G007 + (06:24:20, 7 December 2024)
- ML20206G006 + (06:24:20, 7 December 2024)
- ML20206G003 + (06:24:23, 7 December 2024)
- ML20206G004 + (06:24:23, 7 December 2024)
- ML20206G002 + (06:24:24, 7 December 2024)
- ML20206G000 + (06:24:25, 7 December 2024)
- ML20206F998 + (06:24:26, 7 December 2024)
- ML20206F997 + (06:24:26, 7 December 2024)
- ML20206F995 + (06:24:27, 7 December 2024)
- 05000440/LER-1986-015, :on 860520,reactor Protection Sys (RPS) Actuation Occurred Due to High Scram Discharge Instrument Vol Level Trip.Caused by Personnel Error.Rps Trip Reset & Air Supply Restored to Scram Pilot Air Header + (06:24:28, 7 December 2024)
- ML20206F992 + (06:24:30, 7 December 2024)
- ML20206F990 + (06:24:30, 7 December 2024)
- ML20206F988 + (06:24:31, 7 December 2024)
- ML20206F985 + (06:24:31, 7 December 2024)
- ML20206F984 + (06:24:32, 7 December 2024)
- ML20206F983 + (06:24:33, 7 December 2024)
- ML20206F982 + (06:24:33, 7 December 2024)
- ML20206F980 + (06:24:34, 7 December 2024)
- ML20206F981 + (06:24:34, 7 December 2024)
- ML20206F979 + (06:24:35, 7 December 2024)
- 05000338/LER-1986-009-01, :on 860531,reactor Tripped from 100% Power. Caused by Loss of Power to 120-volt Ac Vital Bus (VB) 1-I Due to 480/120-volt Ac Transformer Failure.Power Restored. Transformers Replaced on 860606 + (06:24:37, 7 December 2024)
- ML20206F976 + (06:24:38, 7 December 2024)
- ML20206F975 + (06:24:38, 7 December 2024)
- ML20206F973 + (06:24:39, 7 December 2024)
- ML20206F974 + (06:24:39, 7 December 2024)
- 05000461/LER-1987-013, :on 870310,18,21 & 31,RWCU Sys Automatically Isolated.Caused by Differential Flow Detector Sensitivity to Flow/Pressure Oscillations.Rwcu Sys Will Be Removed from Svc During Periods of Very Low Feedwater Flowrates + (06:24:41, 7 December 2024)
- L-99-072, Informs of Resignation of J Witter,License SOP-11376,from Employment at Bvps,Unit 2,per 10CFR50.74(b).Util Requests Withdrawal of Subject License + (06:24:42, 7 December 2024)
- ST-HL-AE-2846, Fowards Rev 3 to Relief Request RR-ENG-05 Re Preservice Insp Program (PSI) Exams of STPEGS-1 Welds in Class 1 & 2 Components.Rev Reflects Addl PSI Weld Exams W/Exam Limitations & Encl Revised Exam Limitations Summary + (06:24:43, 7 December 2024)
- ML20206F970 + (06:24:43, 7 December 2024)
- ML20206F966 + (06:24:44, 7 December 2024)
- ML20206F968 + (06:24:44, 7 December 2024)
- ML20206F964 + (06:24:45, 7 December 2024)
- ML20206F963 + (06:24:45, 7 December 2024)
- ML20206F962 + (06:24:46, 7 December 2024)
- IR 05000317/1988024 + (06:24:47, 7 December 2024)
- ML20206F958 + (06:24:48, 7 December 2024)
- ML20206F956 + (06:24:49, 7 December 2024)
- ML20206F957 + (06:24:49, 7 December 2024)
- 0CAN049910, Forwards Response to NRC 990401 Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Gate Valves + (06:24:50, 7 December 2024)
- IR 05000219/1988028 + (06:24:58, 7 December 2024)
- ML20206F950 + (06:25:01, 7 December 2024)