Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206N316 + (05:11:42, 7 December 2024)
- ML20206N313 + (05:11:43, 7 December 2024)
- 05000416/LER-1986-025, :on 860725,breaker Inadvertently Bumped Open While Performing Mod Work Activities Resulting in Loss of Power in Certain Div 1 Isolation Valves.Caused by Personnel Error.Procedures Revised + (05:11:45, 7 December 2024)
- ML20206N311 + (05:11:46, 7 December 2024)
- 05000206/LER-1986-002-02, :on 860717,reactor Trip Occurred During Transfer of 120-volt Ac Vital Bus 4 Power Supply.Caused by Inadequate Procedures for Vital Bus Operation.Procedures Revised + (05:11:48, 7 December 2024)
- NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With + (05:11:49, 7 December 2024)
- ML20206N305 + (05:11:50, 7 December 2024)
- ML20206N304 + (05:11:51, 7 December 2024)
- ML20206N303 + (05:11:51, 7 December 2024)
- ML20206N302 + (05:11:52, 7 December 2024)
- ML20206N300 + (05:11:52, 7 December 2024)
- IR 05000456/1986027 + (05:11:53, 7 December 2024)
- ML20206N297 + (05:11:54, 7 December 2024)
- ML20206N292 + (05:11:58, 7 December 2024)
- ML20206N293 + (05:11:58, 7 December 2024)
- ML20206N290 + (05:11:59, 7 December 2024)
- ML20206N287 + (05:12:02, 7 December 2024)
- ML20206N286 + (05:12:03, 7 December 2024)
- IR 05000498/1986012 + (05:12:10, 7 December 2024)
- ML20206N282 + (05:12:11, 7 December 2024)
- 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With + (05:12:12, 7 December 2024)
- 05000423/LER-1986-040, :on 860721,Train B Control Bldg Isolation Signals Generated Due to Failures of Control Bldg Inlet Ventilation Chlorine Detectors.Caused by Presence of Contaminants on Probes.Detectors Relocated + (05:12:14, 7 December 2024)
- ML20206N279 + (05:12:16, 7 December 2024)
- 05000482/LER-1986-041, :on 860723,control Room Ventilation Isolation Signal (Crvis) Occurred.Caused by Short Supply of Tape in Chlorine Monitor.Design Change to Minimize Potential Spurious Crvis Currently Being Considered + (05:12:18, 7 December 2024)
- 05000302/LER-1998-012, :on 981109,delay in Performance of Improved TSs Required Actions Was Noted.Caused by Personnel Error. Discussed Lessons Learned,Addl Training & Developed Improved Method of Tracking LCO Entries.With + (05:12:20, 7 December 2024)
- ML20206N275 + (05:12:21, 7 December 2024)
- ML20206N273 + (05:12:22, 7 December 2024)
- ML20206N271 + (05:12:22, 7 December 2024)
- ML20206N270 + (05:12:23, 7 December 2024)
- ML20206N269 + (05:12:23, 7 December 2024)
- ML20206N267 + (05:12:24, 7 December 2024)
- ML20206N266 + (05:12:24, 7 December 2024)
- ST-HL-AE-2046, Forwards Revised FSAR Table 9.2.2-2, Component Cooling Water Chemistry,Normal Plant Operations, Reflecting Expected Sys Ph at 25 C + (05:12:25, 7 December 2024)
- ML20206N264 + (05:12:26, 7 December 2024)
- ML20206N262 + (05:12:26, 7 December 2024)
- 3F1298-04, Provides Notification That NRC Commitment Per Violations Noted in Insp Rept 50-302/97-12,is Being Revised & Is Considered to Be Completed.Listed Commitments Were Combined & Revised.Due Date Was Extended as Listed + (05:12:27, 7 December 2024)
- ML20206N261 + (05:12:27, 7 December 2024)
- ML20206N257 + (05:12:28, 7 December 2024)
- LIC-98-0163, Informs of Rev to Commitment Made in Response to Violation 50-285/97-16 Re Failure to Remove Uncalibrated Electronic Dosimeter from Svc.Implementation of Computer Software That Was Received on 981030,is Not Expected Until 990228 + (05:12:29, 7 December 2024)
- ML20206N255 + (05:12:29, 7 December 2024)
- RBG-24216, Special Rept:On 851010,860109,0422 & 0712,marker 34 Structural Settlement Value Measured Outside Limits of Tech Spec Table 3.7.10-1.Change to FSAR Table 2.5-19 Will Be Made to Revise Predicted Settlement + (05:12:30, 7 December 2024)
- ML20206N251 + (05:12:31, 7 December 2024)
- ML20206N250 + (05:12:31, 7 December 2024)
- ML20206N248 + (05:12:33, 7 December 2024)
- ML20206N249 + (05:12:33, 7 December 2024)
- ML20206N247 + (05:12:34, 7 December 2024)
- ML20206N243 + (05:12:35, 7 December 2024)
- ML20206N242 + (05:12:36, 7 December 2024)
- 0CAN088606, Responds to Violations Noted in Insp Repts 50-313/86-16 & 50-368/86-16.Corrective Actions:Second Set of Procedures Assigned to Dosimetry Supervisor to Be Located at Secondary Work Station.Violation Should Be Severity Level V + (05:12:37, 7 December 2024)
- ML20206N239 + (05:12:38, 7 December 2024)
- 05000482/LER-1986-042, :on 860724,during Controlled Plant Shutdown, Reactor Trip Occurred.Caused by lo-lo Steam Generator B Level.Evaluation of Feedwater Flow Control Design Enhancements Continuing + (05:12:43, 7 December 2024)
- ML20206N235 + (05:12:44, 7 December 2024)