Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B522 + (05:34:55, 6 January 2025)
- 05000311/LER-1997-008-02, :on 970715,failure to Enter Action Statement for Having Both Radiation Monitors in Same Control Room Air Intake Duct Was Inoperable.Caused by Misjudgement by CR Supervisor.Personnel Was Held Accountable + (05:34:56, 6 January 2025)
- LR-N970512, Requests That Portion of Earlier TS Change Request LCR 97-06 Which Discussed Abv Exhaust Fan Allowed Out of Svc Time Be Retracted + (05:34:58, 6 January 2025)
- LR-N970521, Informs That TS Tracking Program Enhancements Commitment Will Be Implemented by 971001 Instead of by 970815 + (05:35:00, 6 January 2025)
- 05000311/LER-1997-009-02, :on 970711,failure to Stroke Pump Discharge Valves for Potential Pressure Locking Concern Was Noted. Caused by Personnel Error.Revised Procedures to Address Addl Instances of CS Pump Operation + (05:35:02, 6 January 2025)
- PNO-I-97-052, on 970817,NRC inspectors,on-shift at Time, Observed Approach to Criticality.Backshift Insp Coverage in Progress to Monitor Reactor Startup & Power Ascension Program.States of Nj & DE Notified + (05:35:05, 6 January 2025)
- ML18102B511 + (05:35:06, 6 January 2025)
- 05000272/LER-1997-012-01, :on 970709,identified Failure to Perform Surveillance Channel Checks of Loop Average Temp Channels. Caused by Misinterpretation of Info in Operating Logs. Revised Control Room Operating Logs + (05:35:07, 6 January 2025)
- IR 05000311/1997012 + (05:35:09, 6 January 2025)
- ML18102B505 + (05:35:11, 6 January 2025)
- ML18102B504 + (05:35:12, 6 January 2025)
- ML18102B502 + (05:35:13, 6 January 2025)
- TAC:M97443 + (05:35:15, 6 January 2025)
- ML18102B500 + (05:35:15, 6 January 2025)
- ML18102B498 + (05:35:17, 6 January 2025)
- ML18102B496 + (05:35:19, 6 January 2025)
- TAC:M98770 + (05:35:20, 6 January 2025)
- ML18102B494 + (05:35:21, 6 January 2025)
- ML18102B489 + (05:35:21, 6 January 2025)
- LR-N970065, Application for Amends to Licenses DPR-70 & DPR-75,rewording TS Section 4.2.1 to State That Util Will Adhere to Section 7 Incidental Take Statement Approved by Natl Marine Fisheries Svc + (05:35:22, 6 January 2025)
- PNO-I-97-048, on 970807,approach to Criticality Expected to Begin,Based on June 1995 CAL Modified to Allow Restart of Salem Unit 2.Addl Insps Planned to Monitor Power Ascension Program.States of Nj & DE Notified + (05:35:26, 6 January 2025)
- ML18102B484 + (05:35:26, 6 January 2025)
- ML18102B482 + (05:35:28, 6 January 2025)
- IR 05000272/1997010 + (05:35:33, 6 January 2025)
- ML18102B477 + (05:35:34, 6 January 2025)
- 05000272/LER-1997-007-02, :on 970630,failure to Perform Independent Verification for Radioactive Release Lineup as Required by TS 3.3.3.8,noted.Caused by Personnel Error.Cr Supervisor Was Held Accountable for Actions + (05:35:36, 6 January 2025)
- LR-N970440, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-12 & 50-311/97-12.Corrective Actions:Issued Required Reading Matl Re Mgt Expectations to Personnel, Corrected Identified Deficiencies & Disciplined Personnel + (05:35:37, 6 January 2025)
- LR-N970469, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Mechanism Nozzle & Other Vessel Closure Head Penetrations + (05:35:40, 6 January 2025)
- 05000272/LER-1997-005-02, :on 970625,radioactive Liquid Effluent Samples Were Not Analyzed within Required Surveillance Interval. Caused by Incorrect Interpretation of TS Sr.Training Will Be Provided to Chemistry Supervisors + (05:35:46, 6 January 2025)
- LR-N970462, Responds to 970610 RAI Re GL 95-07, Presssure Locking & Thermal Binding of Safety Related Power Operated Gate Valves + (05:35:47, 6 January 2025)
- ML18102B465 + (05:35:51, 6 January 2025)
- ML18102B464 + (05:35:52, 6 January 2025)
- TAC:M95691 + (05:35:53, 6 January 2025)
- ML18102B462 + (05:35:54, 6 January 2025)
- 05000311/LER-1997-007-01, :on 970623,TS 4.0.5 ISI Requirement to Perform Radiography of Check Valves 2CC195 & 2CC210 Every 92 Days Determined to Have Been Missed.Caused by Personnel Error. Check Valves Subsequently Tested + (05:35:56, 6 January 2025)
- LR-N970471, Submits Supplemental Info for Exigent Request for Change to TS Chilled Water Sys Re Auxiliary Bldg Subsystem + (05:35:58, 6 January 2025)
- ML18102B460 + (05:35:58, 6 January 2025)
- ML18102B458 + (05:36:00, 6 January 2025)
- LR-N970453, Informs That Commitment to Evaluate & Identify Improvements to TS Tracking Action Log Has Been Revised to Be Implemented by 970815.Commitment in Response to Violations Noted in Insp Repts 50-272/97-07 & 50-311/97-07 + (05:36:01, 6 January 2025)
- LR-N970449, Forwards Supplemental Response to Violations Noted in Insp Rept 50-311/97-06.Corrective Actions:Ar 970320247 Issued to Evaluate White Chalky Film Observed on Coil + (05:36:04, 6 January 2025)
- LR-N970439, Submits Annual Fuel Clad Temp Rept,Describing Changes to Calculated PCT for Plant Large & Small Break LOCA Analyses + (05:36:05, 6 January 2025)
- LR-N970443, Monthly Operating Rept for June 1997 for Salem Unit 2 + (05:36:07, 6 January 2025)
- LR-N970442, Monthly Operating Rept for June 1997 for Salem Unit 1 + (05:36:09, 6 January 2025)
- ML18102B451 + (05:36:12, 6 January 2025)
- ML18102B447 + (05:36:13, 6 January 2025)
- GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) + (05:36:14, 6 January 2025)
- ML18102B446 + (05:36:14, 6 January 2025)
- IR 05000272/1997008 + (05:37:49, 6 January 2025)
- ML18102B440 + (05:37:51, 6 January 2025)
- 05000272/LER-1996-008-02, :on 960613,failure to Meet TS Requirements While in Mode 5 for Natural Circulation Was Noted.Caused by Insufficient Technical Input for Development of Controls. Revised Plant Operating Logs for Mode 5 + (05:37:52, 6 January 2025)
- LR-N970390, Comment Opposing NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Util Endorses Comments Submitted by Nuclear Energy Inst + (05:37:54, 6 January 2025)