- ML18106A290 + (05:20:20, 6 January 2025)
- ML18106A288 + (05:20:21, 6 January 2025)
- ML18106A287 + (05:20:22, 6 January 2025)
- ML18106A286 + (05:20:23, 6 January 2025)
- LR-N970817, Informs That Util Revising Commitment Contained in to State,Min Shift Staffing Levels Necessary to Perform Simultaneous Alternate Shutdown of Units 1 & 2,controlled Under Administrative Procedures + (05:20:24, 6 January 2025)
- ML18106A285 + (05:20:24, 6 January 2025)
- ML18106A279 + (05:20:26, 6 January 2025)
- ML18106A278 + (05:20:27, 6 January 2025)
- ML18106A277 + (05:20:28, 6 January 2025)
- ML18106A275 + (05:20:29, 6 January 2025)
- LR-N980008, Discusses Option Chosen by Util to Resolve Issues Re Spent Fuel Pool Liner Analysis.Util Will Seismically Qualify Spent Fuel Pool Cooling Sys Which Will Eliminate Need to Postulate Loss of Forced Cooling + (05:20:30, 6 January 2025)
- TAC:M94465 + (05:20:30, 6 January 2025)
- ML18106A272 + (05:20:53, 6 January 2025)
- ML18106A271 + (05:20:56, 6 January 2025)
- 05000272/LER-1996-005-15, Forwards LER 96-005-15, Inadequate TS Testing - Feedwater Sys Isolation Functional Test/Component Cooling Water Heat Exchanger Service Water Flow Control Valves + (05:22:12, 6 January 2025)
- ML18106A267 + (05:22:16, 6 January 2025)
- LR-N970818, Provides Notification That GL 96-01 Actions Have Been Completed as Part of TS Surveillance Improvement Program + (05:22:17, 6 January 2025)
- LR-N980007, Forwards COLR IAW Section 6.9.1.9 of Plant Ts.Rept Was Received by Util as Part of Reload Safety Evaluation + (05:22:40, 6 January 2025)
- ML18106A262 + (05:22:56, 6 January 2025)
- ML18106A261 + (05:22:59, 6 January 2025)
- ML18106A258 + (05:23:01, 6 January 2025)
- ML18106A257 + (05:23:03, 6 January 2025)
- LR-N980025, Forwards Overview of Steps Pse&G Has & Is Taking to Sustain Continued Improvement for Future.Info Is Being Provided to Commission as Follow Up to Briefing Provided in June 1997 + (05:23:04, 6 January 2025)
- ML18106A254 + (05:23:11, 6 January 2025)
- LR-N970810, Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page + (05:23:13, 6 January 2025)
- LR-N980004, Informs That Util Will Be Prepared to Enter Mode 4 During First Week in Feb 1998 Based on Activities to Be Performed. Info Is Provided So That Appropriate Arrangements Can Be Made for NRC Restart Assessment Team Insp + (05:23:19, 6 January 2025)
- 05000311/LER-1997-017-01, :on 971212,discovered That non-essential Heat Loads for Chilled Water Sys Were Not Isolated IAW TS Action Statement 3.7.10.a.1.Caused by Personnel Error.Personnel Involved Held Accountable & Revised Procedures + (05:23:25, 6 January 2025)
- ML18106A247 + (05:23:28, 6 January 2025)
- 05000311/LER-1997-018-01, :on 971125,inadequate TS Testing of MSIV Hydraulic Unit Override Contacts,Was Identified.Caused by Lack of Adequate Controls.Procedure S1(2).OP-ST.MS-0003(Q) Revised to Include Testing of MSIV Hydraulic Unit Override + (05:23:32, 6 January 2025)
- 05000311/LER-1997-018, Forwards LER 97-018-00, Inadequate TS Testing - Main Steam Isolation Valve Hydraulic Unit Override Contacts. LER Was Originally Submitted on 971224 as LER 97-016.Number Was Already Assigned to Special Rept + (05:23:35, 6 January 2025)
- IR 05000272/1997018 + (05:23:40, 6 January 2025)
- ML18106A240 + (05:23:42, 6 January 2025)
- LR-N970815, Forwards 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (05:23:43, 6 January 2025)
- 05000311/LER-1997-010, :on 970819,CR Operators Initiated Plant Shutdown to Comply W/Requirements of Ts.Caused by Design, Mfg Const/Installation Deficiencies.Calibr Procedure Revised + (05:23:50, 6 January 2025)
- 05000272/LER-1995-023, :on 940106,failed to Plug SG Tubes.Caused by Lack of Contractor Oversight in Area of Eddy Current Testing.Analyst Guidelines Specific to Salem,Units 1 & 2 & Performance Demonstration Program Were Developed + (05:23:53, 6 January 2025)
- 05000272/LER-1995-023-01, Forwards Supplemental LER 95-023-01 Re Failure to Plug SG Tubes Due to Missed Eddy Current Indications.Suppl Being Submitted to Discuss Cause & Safety Significance of Event + (05:23:57, 6 January 2025)
- ML18106A234 + (05:23:59, 6 January 2025)
- IR 05000272/1997019 + (05:24:23, 6 January 2025)
- ML18106A231 + (05:24:26, 6 January 2025)
- ML18106A230 + (05:24:27, 6 January 2025)
- ML18106A228 + (05:24:28, 6 January 2025)
- ML18106A227 + (05:24:29, 6 January 2025)
- ML18106A226 + (05:24:30, 6 January 2025)
- ML18106A223 + (05:24:32, 6 January 2025)
- ML18106A222 + (05:24:33, 6 January 2025)
- 05000311/LER-1997-016-02, :on 971125,inadequate TS Testing Main Steam Isolation Valve Hydraulic Unit Override Contacts Were Noted. Caused by Lack of Adequate Controls.Operability of MSIV Hydraulic Unit Will Be Verified + (05:24:35, 6 January 2025)
- LR-N970758, Informs That Pse&G Is Revising Commitment to State That RWST Low Level back-up Alarm Will Be Set at Same Level as Existing RWST Low Level Alarm + (05:24:37, 6 January 2025)
- 05000272/LER-1997-011-02, :on 971119,failure to Test Isolation of Sgb & SS on Automatic Start of Afps Was Noted.Caused by Inadequate Incorporation of DBA Mitigation Features Into Plant Tp.Pse&G Committed to Complete GL 96-01 Evaluations by 971231 + (05:24:41, 6 January 2025)
- 05000272/LER-1997-011, Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A) + (05:24:44, 6 January 2025)
- 05000272/LER-1997-013-02, :on 970702,determined That EDG Should Have Been Declared Inoperable W/Test Instrumentation Connected.Caused by Personnel Error.Performed Satisfactory follow-up Test, Removed Equipment & Signed Off Procedure + (05:24:47, 6 January 2025)