Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18106B099 + (05:06:08, 6 January 2025)
- ML18106B098 + (05:06:09, 6 January 2025)
- TAC:M98259 + (05:06:10, 6 January 2025)
- LR-N990127, Provides Clarification of Design & Fabrication Code Requirements & post-installation Test Requirements for Salem Outage Equipment Hatch,As Described in License Amends 217 & 199 + (05:06:12, 6 January 2025)
- ML18106B096 + (05:06:12, 6 January 2025)
- IR 05000272/1998301 + (05:06:32, 6 January 2025)
- ML18106B093 + (05:06:33, 6 January 2025)
- ML18106B090 + (05:06:34, 6 January 2025)
- ML18106B089 + (05:06:37, 6 January 2025)
- LR-N990078, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1998, IAW TS 6.9.1.8.Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Plant + (05:06:38, 6 January 2025)
- ML18106B086 + (05:06:40, 6 January 2025)
- ML18106B085 + (05:06:41, 6 January 2025)
- LR-N990073, Forwards fitness-for-duty Performance Data Rept for Six Month Period Ending 981231.Without,encl + (05:06:42, 6 January 2025)
- ML18106B083 + (05:06:42, 6 January 2025)
- ML18106B080 + (05:06:47, 6 January 2025)
- LR-N990039, Forwards Response to RAI & Changes to Differential Pressure Acceptance Criteria CR Emergency Air Conditioning Sys,Dtd 990107.Revised TS mark-ups,also Encl + (05:06:48, 6 January 2025)
- ML18106B077 + (05:06:51, 6 January 2025)
- PNO-I-99-010, on 990228,Unit 1 Reactor Automatically Tripped, Due to Main Turbine Trip That Resulted from Rapid Loss of Lube Oil Pressure.Plant Equipment Operators Adjusting Isolation Valve of Main Turbine Lube Oil Cooler + (05:06:53, 6 January 2025)
- ML18106B074 + (05:06:54, 6 January 2025)
- TAC:MA4607 + (05:06:55, 6 January 2025)
- ML18106B073 + (05:06:56, 6 January 2025)
- LR-N990085, Documents Changes Agreed to Between Util & NRC Re Request for License Amend Re Auxiliary Bldg Ventilation.Attachment 1 Contains Revised LCO Submitted in + (05:06:57, 6 January 2025)
- 05000311/LER-1998-015-01, :on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With + (05:07:00, 6 January 2025)
- IR 05000272/1998012 + (05:07:09, 6 January 2025)
- ML18106B067 + (05:07:10, 6 January 2025)
- ML18106B065 + (05:07:11, 6 January 2025)
- ML18106B064 + (05:07:12, 6 January 2025)
- LR-N990069, Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing + (05:07:13, 6 January 2025)
- LR-N980155, Forwards Addl Rev to SR 4.8.1.1.2.f & Change to Definition of Standby Conditions Proposed in 960925 Submittal Re EDG Testing + (05:07:15, 6 January 2025)
- ML18106B061 + (05:07:15, 6 January 2025)
- LR-N990055, Revises 981019 Request to Change QA Program for Hope Creek & Salem Generating Stations,In Response to NRC 981218 Rrai. Details Re Revised Proposal & Responses to NRC Questions, Including Proposed UFSAR Changes for Plants Encl + (05:07:22, 6 January 2025)
- LR-N99-0080, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With + (05:07:24, 6 January 2025)
- LR-N99-0081, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With + (05:07:26, 6 January 2025)
- ML18106B055 + (05:07:27, 6 January 2025)
- ML18106B054 + (05:07:28, 6 January 2025)
- ML18106B053 + (05:07:29, 6 January 2025)
- NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test + (05:07:30, 6 January 2025)
- LR-N990056, Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl + (05:07:31, 6 January 2025)
- 05000311/LER-1998-007, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With + (05:07:37, 6 January 2025)
- ML18106B047 + (05:07:38, 6 January 2025)
- PNO-I-99-008, on 990203,determined That Computer Sys Supporting Overhead Annunciators in CR Had Malfunctioned. Mishap Occurred During Preventive Maint on Annunciator Computer Sys,Which Involves Two Computer Processors + (05:07:40, 6 January 2025)
- ML18106B044 + (05:07:41, 6 January 2025)
- LR-N990049, Provides Revised TS Bases Pages for Units 1 & 2 Tech Specs. Bases Section Affected 3/4.1.2,boration Sys.Revised Bases Pages Reviewed Through 10CFR50.59 Process + (05:07:42, 6 January 2025)
- ML18106B043 + (05:07:42, 6 January 2025)
- 05000311/LER-1998-016, :on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With + (05:07:49, 6 January 2025)
- LR-N990022, Discusses Evaluation of part-length CRDM Housing Weld Crack of Prairie Island,Unit 2.Conclusions in WCAP-15126 Support Return to Normal Plant Operation & Normal RCS Leakage Monitoring + (05:07:50, 6 January 2025)
- ML18106B031 + (05:07:52, 6 January 2025)
- ML18106B029 + (05:07:53, 6 January 2025)
- ML18106B028 + (05:07:54, 6 January 2025)
- LR-N99-0007, Monthly Operating Rept for Dec 1998 for Salem Unit 1.With + (05:07:55, 6 January 2025)
- LR-N99-0008, Monthly Operating Rept for Dec 1998 for Salem Unit 2.With + (05:08:00, 6 January 2025)