Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18142B281 + (01:43:26, 6 January 2025)
- 05000244/LER-2076-016, Rod Position Deviation Channel Was Found to Be Inoperable + (01:43:28, 6 January 2025)
- 05000244/LER-2076-010, R. E. Ginna - Supplemental Report on LER 1976-10-00, R. E. Ginna Plant, Containment Purge Supply Valve Having Excessive Leakage During Testing + (01:43:31, 6 January 2025)
- 05000244/LER-2076-020, For R.E. Ginna, a Accumulator Level Below Technical Specification Limit + (01:43:34, 6 January 2025)
- 05000244/LER-2076-019, For R. E. Ginna, Release of Liquid Radioactive Waste Without Continuous Operation of a Gross Activity Monitor. for R. E. Ginna, Release of Liquid Radioactive Waste Without Continuous Operation of a Gross Activity Monitor + (01:43:38, 6 January 2025)
- 05000244/LER-2076-021, R. E. Ginna, Unit 1, D Bank Group 2 RCCs G-3 and G-11 Partially Dropped Into Core + (01:43:40, 6 January 2025)
- ML18142B254 + (01:43:41, 6 January 2025)
- 05000244/LER-2076-022, R. E. Ginna, Unit 1, Error in Westinghouse Safety Analysis Methods + (01:43:46, 6 January 2025)
- 05000244/LER-2076-023, R. E. Ginna, Unit 1, Incorrect Piping Installation for Modification SM 75-9.21 + (01:43:48, 6 January 2025)
- 05000244/LER-2076-024, R. E. Ginna, Unit 1, Accumulation of Borated Water Near Valve in Safety Injection System Piping Between Boric Acid Tanks and Safety Injection Pumps + (01:43:49, 6 January 2025)
- 05000244/LER-2076-025, R. E. Ginna, Unit 1, Leak at Residual Heat Removal System Return Pipe Vent + (01:43:52, 6 January 2025)
- 05000244/LER-2076-026, R. E. Ginna, Unit 1, Controller Output for Cv Spray Naoh Valve 836A Was Less than 10 Ma + (01:43:54, 6 January 2025)
- ML18142B245 + (01:43:55, 6 January 2025)
- 05000244/LER-2076-027, R. E. Ginna, Unit 1, Liquid Leak Through Insulation on 2 Letdown Diversion Line + (01:43:57, 6 January 2025)
- 05000244/LER-2076-029, R. E. Ginna, Unit 1, Core Quadrant Power Tilt Ratio Calculation in Excess of Limit During Dropped Rod Condition + (01:43:58, 6 January 2025)
- 05000244/LER-2076-028, R. E. Ginna, Unit 1, on Control Rod F-12 Dropping Into Core During Operation at Reduced Load for Condenser Work + (01:44:00, 6 January 2025)
- ML18142B241 + (01:44:04, 6 January 2025)
- 05000244/LER-2076-030, A Mixed Bed Demineralizer Inlet Piping Leak + (01:44:06, 6 January 2025)
- 05000244/LER-2077-001, R. E. Ginna, Bus 14 Circuit Breaker for C Safety Injection Pump + (01:44:08, 6 January 2025)
- ML18142B237 + (01:44:09, 6 January 2025)
- 05000244/LER-2077-003, Abnormal Degradation of Steam Generator Tubes + (01:44:10, 6 January 2025)
- ML18142B232 + (01:44:11, 6 January 2025)
- ML18142B230 + (01:44:12, 6 January 2025)
- 05000244/LER-2076-030-03, Leak in Letdown Diversion Line on 12/16/1976, and LER 1976-030-03 a Mixed Bed Demineralizer Inlet Piping Leak + (01:44:13, 6 January 2025)
- ML18142B228 + (01:44:14, 6 January 2025)
- ML18142B227 + (01:44:15, 6 January 2025)
- ML18142B226 + (01:44:16, 6 January 2025)
- ML18142B224 + (01:44:16, 6 January 2025)
- ML18142B223 + (01:44:17, 6 January 2025)
- 05000244/LER-2077-008, B Steam Generator Tube Leak + (01:44:19, 6 January 2025)
- 05000244/LER-2077-007, Bus 14 Breaker for C Safety Injection Pump + (01:44:24, 6 January 2025)
- DD-18-01, Letter from Annette Vietti-Cook to Barry Quigley Regarding Directors Decision DD-18-01 + (01:44:25, 6 January 2025)
- 05000244/LER-2078-003, B Steam Generator Tube Leak + (01:44:28, 6 January 2025)
- 05000244/LER-2078-002, R. E. Ginna, Power Range Low Range Trip Set Point Test + (01:44:30, 6 January 2025)
- 05000244/LER-1977-023, Letter Forwarding Update Report LER 77-023/1X-1, Supplemental Report on Reportable Occurrence 77-023/1T, Control Rod Urgent Failure Rod Stop + (01:44:32, 6 January 2025)
- 05000244/LER-2078-005, For R. E. Ginna, Unplanned Reactivity Insertion of More than 0.5% K/K While Subcritical + (01:44:37, 6 January 2025)
- 05000244/LER-2078-004, For R. E. Ginna, Motor Control Center 1C Circuit Breaker to Motor Control Center 1H Trip + (01:44:39, 6 January 2025)
- L-77-004, R. E. Ginna - Response to IE Bulletin No. 77-04, Calculation Error Affecting the Design Performance of a System for Controlling Ph of Containment Sump Water Following a Loca + (01:44:40, 6 January 2025)
- ML18142B201 + (01:44:43, 6 January 2025)
- ML18142B200 + (01:44:44, 6 January 2025)
- ML18142B198 + (01:44:45, 6 January 2025)
- ML18142B194 + (01:44:47, 6 January 2025)
- BVY 18-016, Response to Request for Additional Information Regarding the Request for Direct and Indirect License Transfers from Entergy to Northstar for the Vermont Yankee Nuclear Power Station + (01:44:48, 6 January 2025)
- ML18142B180 + (01:44:49, 6 January 2025)
- ML18142B178 + (01:44:52, 6 January 2025)
- ML18142B176 + (01:44:53, 6 January 2025)
- ML18142B175 + (01:44:56, 6 January 2025)
- ML18142B173 + (01:44:57, 6 January 2025)
- ML18142B172 + (01:44:58, 6 January 2025)
- ML18142B171 + (01:45:02, 6 January 2025)
- ML18142B169 + (01:45:02, 6 January 2025)