Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210U221 + (05:58:17, 6 December 2024)
- ML20210U218 + (05:58:18, 6 December 2024)
- ML20210U215 + (05:58:19, 6 December 2024)
- ML20210U216 + (05:58:19, 6 December 2024)
- ML20210U208 + (05:58:22, 6 December 2024)
- ML20210U205 + (05:58:24, 6 December 2024)
- ML20210U206 + (05:58:24, 6 December 2024)
- ML20210U199 + (05:58:25, 6 December 2024)
- ML20210U196 + (05:58:26, 6 December 2024)
- ML20210U198 + (05:58:26, 6 December 2024)
- ML20210U195 + (05:58:27, 6 December 2024)
- ML20210U192 + (05:58:27, 6 December 2024)
- W3P86-3331, Application for Amend to License NPF-38,revising Tech Specs Re DNBR Setpoints,Boron Dilution Requirements,Peak Linear Heat Generation Curve,Reactor Protective Instrumentation & Liquid & Gaseous Monitoring Instrumentation.Fee Paid + (05:58:28, 6 December 2024)
- ML20210U188 + (05:58:29, 6 December 2024)
- ML20210U187 + (05:58:30, 6 December 2024)
- PNO-I-86-072A, investigation of Alleged Offsite Drug Use by Two Operations Dept Personnel Led to Termination of Employment.Press Release Issued on 861001 & Region I Responding to Media Inquiries + (05:58:30, 6 December 2024)
- ML20210U183 + (05:58:31, 6 December 2024)
- ML20210U185 + (05:58:31, 6 December 2024)
- ML20210U180 + (05:58:32, 6 December 2024)
- ML20210U178 + (05:58:33, 6 December 2024)
- ML20210U177 + (05:58:33, 6 December 2024)
- ML20210U172 + (05:58:34, 6 December 2024)
- ML20210U176 + (05:58:34, 6 December 2024)
- PNO-V-86-066, on 860929,shutdown Commenced Due to Excessive Leakage from Reactor Coolant Pump Seal.Seals to Be Replaced & Addl Maint Performed + (05:58:35, 6 December 2024)
- ML20210U170 + (05:58:36, 6 December 2024)
- PNO-IV-99-036, on 990813,licensee Notified NRC Operations Ctr That Inaccurate Lab Analysis Method Resulted in Potential for Criticality Safety Limit to Be Exceeded by 23%.Affected Process Was Shut Down & Tagged Out.Region Will Conduct Insp + (05:58:36, 6 December 2024)
- ML20210U168 + (05:58:37, 6 December 2024)
- ML20210U167 + (05:58:37, 6 December 2024)
- ML20210U164 + (05:58:38, 6 December 2024)
- PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping + (05:58:38, 6 December 2024)
- W3P86-2549, Forwards Response to Request for Addl Info Re Util 860829 Proposed Tech Spec Change Revising Location of Two Seismic Monitors.No safety-related Equipment Lies Below Seismic Monitor Location + (05:58:39, 6 December 2024)
- ML20210U161 + (05:58:40, 6 December 2024)
- 05000388/LER-1985-018, :on 850529,circuit Breaker 8B in Reactor Protection Sys Distribution Panel 2Y201B Tripped.Caused by Loose Load Side Connection Leading to Overheating of Terminal Lug.Breaker Replaced + (05:58:41, 6 December 2024)
- ML20210U159 + (05:58:42, 6 December 2024)
- ML20210U157 + (05:58:43, 6 December 2024)
- ML20210U156 + (05:58:43, 6 December 2024)
- ML20210U154 + (05:58:44, 6 December 2024)
- ML20210U155 + (05:58:44, 6 December 2024)
- ML20210U153 + (05:58:45, 6 December 2024)
- ML20210U152 + (05:58:46, 6 December 2024)
- ML20210U150 + (05:58:47, 6 December 2024)
- ML20210U151 + (05:58:47, 6 December 2024)
- ML20210U149 + (05:58:48, 6 December 2024)
- ML20210U148 + (05:58:49, 6 December 2024)
- ML20210U144 + (05:58:50, 6 December 2024)
- ML20210U146 + (05:58:50, 6 December 2024)
- ML20210U143 + (05:58:51, 6 December 2024)
- ML20210U140 + (05:58:52, 6 December 2024)
- IR 05000498/1999008 + (05:58:54, 6 December 2024)
- IR 05000250/1987004 + (05:58:55, 6 December 2024)
- ML20210U136 + (05:58:56, 6 December 2024)
- ML20210U133 + (05:58:57, 6 December 2024)