Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D356 + (05:04:22, 6 December 2024)
- ML20211D354 + (05:04:22, 6 December 2024)
- ML20211D353 + (05:04:23, 6 December 2024)
- ML20211D348 + (05:04:24, 6 December 2024)
- ML20211D351 + (05:04:24, 6 December 2024)
- ML20211D347 + (05:04:26, 6 December 2024)
- ML20211D342 + (05:04:27, 6 December 2024)
- ML20211D345 + (05:04:27, 6 December 2024)
- ML20211D339 + (05:04:28, 6 December 2024)
- NSD-NRC-97-5336, Advises NRC of Implementation of AP600 Design Change Re Pressurizer Heater Control Logic.No SSAR Design Description Is Affected by Change.Current PRA Results Remain Conservative W/Respect to Reanalysis Considering Change + (05:04:32, 6 December 2024)
- ML20211D334 + (05:04:35, 6 December 2024)
- ML20211D332 + (05:04:36, 6 December 2024)
- ML20211D330 + (05:04:37, 6 December 2024)
- 05000280/LER-1986-023-01, :on 860820,containment Sump Trip Valve Found Leaking from Inside Containment Isolation Valve.Caused by Loose Valve Position Indication Arm.Valve Manually Isolated & Screw Set Tightened in Indication Arm + (05:04:38, 6 December 2024)
- ML20211D324 + (05:04:40, 6 December 2024)
- ML20211D321 + (05:04:41, 6 December 2024)
- ML20211D315 + (05:04:42, 6 December 2024)
- ML20211D310 + (05:04:43, 6 December 2024)
- ML20211D307 + (05:04:46, 6 December 2024)
- ML20211D305 + (05:04:46, 6 December 2024)
- 05000346/LER-1986-040, :on 860908,during Annual Fire Protection Audit, Fire Detection Instruments Inside Containment & Containment Annulus Declared Inoperable & Fire Watches Confirmed.Caused by Misinterpretation of Tech Spec 4.3.3.8.2 + (05:04:48, 6 December 2024)
- ML20211D302 + (05:04:49, 6 December 2024)
- ML20211D300 + (05:04:50, 6 December 2024)
- ML20211D295 + (05:04:51, 6 December 2024)
- ST-HL-AE-1912, Requests That SER (NUREG-0781),Section 13.2.1.1.3 Be Revised Re Number of Senior Reactor Operators & Reactor Operators. Util Expects 60 Employees to Complete License Training Prior to Issuance of OL in June 1987 + (05:04:51, 6 December 2024)
- ML20211D292 + (05:04:52, 6 December 2024)
- ML20211D287 + (05:04:53, 6 December 2024)
- ST-HL-AE-1877, Forwards marked-up FSAR Pages 3.9-84 (Table 3.9-1.1) & 3.9-88b (Table 3.9-1.2) Re Lists of Active Components & Valves Reflecting Revs from Update & Consistency Check,To Be Incorporated Into Future Amend + (05:04:58, 6 December 2024)
- ML20211D282 + (05:04:59, 6 December 2024)
- ML20211D277 + (05:05:02, 6 December 2024)
- ML20211D275 + (05:05:04, 6 December 2024)
- ML20211D272 + (05:05:04, 6 December 2024)
- ML20211D271 + (05:05:05, 6 December 2024)
- ML20211D269 + (05:05:06, 6 December 2024)
- ML20211D267 + (05:05:07, 6 December 2024)
- ML20211D266 + (05:05:07, 6 December 2024)
- RBG-44223, Application for Amend to License NPF-47,proposing Addl Change to Administrative Controls Associated W/Lar 97-18. Change Listed + (05:05:08, 6 December 2024)
- ML20211D254 + (05:05:09, 6 December 2024)
- ML20211D253 + (05:05:10, 6 December 2024)
- ML20211D251 + (05:05:11, 6 December 2024)
- ML20211D252 + (05:05:11, 6 December 2024)
- ML20211D250 + (05:05:12, 6 December 2024)
- ML20211D245 + (05:05:12, 6 December 2024)
- BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered + (05:05:13, 6 December 2024)
- ML20211D241 + (05:05:14, 6 December 2024)
- ML20211D239 + (05:05:15, 6 December 2024)
- ML20211D240 + (05:05:15, 6 December 2024)
- ML20211D236 + (05:05:19, 6 December 2024)
- ML20211D235 + (05:05:20, 6 December 2024)
- NSD-NRC-97-5331, Forwards Response to Comment 41 on AP600 Ssar,Chapter 15, Accident Analyses + (05:05:21, 6 December 2024)
- ML20211D230 + (05:05:22, 6 December 2024)