Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000296/LER-2077-001, For Browns Ferry Nuclear Plant, Unit 3, Relief Valve on Pump Discharge Opened at Lower than Set Pressure During Performance of Surveillance Instruction 4.4.A.1 on Standby Liquid Control Pump 3A + (17:25:02, 5 January 2025)
- 05000296/LER-2078-002, For Browns Ferry Nuclear Plant, Unit 3, Bendix Connectors of Type Used Inside Primary Containment Have Failed a Post-Aging Environmental Test at Wyle Laboratory Testing Facility + (17:25:03, 5 January 2025)
- PMNS20181066, October Reactor Oversight Process Monthly Public Meeting + (17:25:04, 5 January 2025)
- 05000296/LER-2078-003, For Browns Ferry Nuclear Plant, Unit 3, Valve FCV 3-74-52 Was Found Inoperable During Performance of Surveillance Instruction 4.5.B.1.C + (17:25:06, 5 January 2025)
- 05000296/LER-2077-005, For Browns Ferry Nuclear Plant, Unit 3, RPS MG Set a Which Continued Running & MG Set B Output Breaker Which Did Not Trip During Startup Test STI-31, Which Is Supplementing Previous Letter of 3/24/1977 + (17:25:08, 5 January 2025)
- 05000296/LER-2078-004, For Browns Ferry Nuclear Plant, Unit 3, Three of Five Test Specimens Failed During Simulated LOCA Conditions & During Qualification Testing of Bendix Electrical Connectors Identical to Those Used in Primary Containment + (17:25:10, 5 January 2025)
- ML18283B408 + (17:25:11, 5 January 2025)
- 05000296/LER-2078-005, For Browns Ferry Nuclear Plant, Unit 3, Six CRD Accumulator Level Switches Which Would Not Alarm with Level Increases During Plant Operation While Performing Electrical Maintenance Instruction 50 + (17:25:13, 5 January 2025)
- 05000296/LER-2078-006, For Browns Ferry Nuclear Plant, Unit 3, Electrical Connector Carrying Thermocouple Circuits Monitoring Primary Containment Atmospheric Temperature Not Included as Part of Modification Which Qualified Connector Assemblies for Ac + (17:25:16, 5 January 2025)
- 05000296/LER-2078-008, For Browns Ferry Nuclear Plant, Unit 3, Relief Valve 3-1-31 Which Failed to Reseat Until Reactor Pressure Reached 280 Psig During Reactor Scram + (17:25:18, 5 January 2025)
- 05000296/LER-2078-009, For Browns Ferry Nuclear Plant, Unit 3, Smoke Alarm Which Would Not Clear & Was Received for Preaction Sprinkler Zone in Reactor Building During Normal Operation + (17:25:20, 5 January 2025)
- 05000296/LER-2078-010, For Browns Ferry Nuclear Plant, Unit 3, Both RBM Channels Which Became Continuously Bypassed During Power Ascension + (17:25:21, 5 January 2025)
- ML18283B390 + (17:25:23, 5 January 2025)
- ML18283B393 + (17:25:23, 5 January 2025)
- ML18283B387 + (17:25:24, 5 January 2025)
- ML18283B389 + (17:25:24, 5 January 2025)
- ML18283B383 + (17:25:25, 5 January 2025)
- ML18283B375 + (17:25:26, 5 January 2025)
- ML18283B380 + (17:25:26, 5 January 2025)
- ML18283B374 + (17:25:27, 5 January 2025)
- ML18283B372 + (17:25:28, 5 January 2025)
- ML18283B373 + (17:25:28, 5 January 2025)
- ML18283B371 + (17:25:29, 5 January 2025)
- ML18283B342 + (17:25:30, 5 January 2025)
- ML18283B369 + (17:25:30, 5 January 2025)
- ML18283B341 + (17:25:31, 5 January 2025)
- ML18283B339 + (17:25:32, 5 January 2025)
- ML18283B340 + (17:25:32, 5 January 2025)
- 05000259/LER-2078-205-01, Four Main Steam Isolation Valves Which Exceeded the Leakage Limits of Technical Specification 4.7.A.2.i While Performing Local Leak Rate Testing During Refueling + (17:25:34, 5 January 2025)
- ML18283B325 + (17:25:35, 5 January 2025)
- ML18283B323 + (17:25:35, 5 January 2025)
- ML18283B278 + (17:25:36, 5 January 2025)
- ML18283B317 + (17:25:36, 5 January 2025)
- ML18283B246 + (17:25:37, 5 January 2025)
- ML18283B258 + (17:25:37, 5 January 2025)
- ML18283B245 + (17:25:38, 5 January 2025)
- ML18283B243 + (17:25:39, 5 January 2025)
- ML18283B244 + (17:25:39, 5 January 2025)
- ML18283B242 + (17:25:40, 5 January 2025)
- ML18283B240 + (17:25:41, 5 January 2025)
- ML18283B241 + (17:25:41, 5 January 2025)
- ML18283B239 + (17:25:42, 5 January 2025)
- ML18283B237 + (17:25:42, 5 January 2025)
- ML18283B236 + (17:25:43, 5 January 2025)
- ML18283B235 + (17:25:44, 5 January 2025)
- ML18283B233 + (17:25:45, 5 January 2025)
- ML18283B234 + (17:25:45, 5 January 2025)
- ML18283B232 + (17:25:46, 5 January 2025)
- ML18283B230 + (17:25:46, 5 January 2025)
- ML18283B229 + (17:25:47, 5 January 2025)
- ML18283B226 + (17:25:48, 5 January 2025)
- ML18283B228 + (17:25:48, 5 January 2025)