Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19208A190 + (04:59:34, 5 January 2025)
- ML19208A189 + (04:59:35, 5 January 2025)
- ML19208A186 + (04:59:36, 5 January 2025)
- ML19208A185 + (04:59:36, 5 January 2025)
- ML19208A184 + (04:59:37, 5 January 2025)
- ML19208A183 + (04:59:38, 5 January 2025)
- ML19208A182 + (04:59:39, 5 January 2025)
- ML19208A180 + (04:59:40, 5 January 2025)
- ML19208A178 + (04:59:41, 5 January 2025)
- ML19208A179 + (04:59:41, 5 January 2025)
- ML19208A176 + (04:59:42, 5 January 2025)
- ML19208A173 + (04:59:43, 5 January 2025)
- ML19208A172 + (04:59:44, 5 January 2025)
- ML19208A170 + (04:59:45, 5 January 2025)
- ML19208A169 + (04:59:46, 5 January 2025)
- ML19208A167 + (04:59:47, 5 January 2025)
- ML19208A161 + (04:59:47, 5 January 2025)
- ML19208A159 + (04:59:49, 5 January 2025)
- ML19208A150 + (04:59:50, 5 January 2025)
- ML19208A147 + (04:59:51, 5 January 2025)
- ML19208A143 + (04:59:52, 5 January 2025)
- ML19208A142 + (04:59:53, 5 January 2025)
- ML19208A140 + (04:59:54, 5 January 2025)
- ML19208A139 + (04:59:55, 5 January 2025)
- ML19208A137 + (04:59:56, 5 January 2025)
- ML19208A136 + (04:59:57, 5 January 2025)
- ML19208A124 + (04:59:59, 5 January 2025)
- ML19208A123 + (05:00:00, 5 January 2025)
- ML19208A121 + (05:00:03, 5 January 2025)
- ML19208A119 + (05:00:05, 5 January 2025)
- ML19208A117 + (05:00:05, 5 January 2025)
- ML19208A116 + (05:00:06, 5 January 2025)
- ML19208A114 + (05:00:06, 5 January 2025)
- ML19208A113 + (05:00:07, 5 January 2025)
- 05000254/LER-1979-024-03, /03L-0:on 790724,pressure Suppression Chamber Reactor Bldg Vacuum Breaker Pressure Switch Was Found to Actuate Below Limiting Condition for Operation Level.Caused by Instrument Setpoint Drift.Switch Recalibr + (05:00:09, 5 January 2025)
- 05000254/LER-1979-024, Forwards LER 79-024/03L-0 + (05:00:11, 5 January 2025)
- ML19208A109 + (05:00:13, 5 January 2025)
- 05000266/LER-1979-011-01, /01T-0:on 790804,while Proceeding to Cold Shutdown Condition,Containment Integrity Was Briefly Violated.Caused by Faulty Interlock Allowing Inside Containment Door to Open When Outside Door Was Already Open + (05:00:14, 5 January 2025)
- 05000266/LER-1979-011, Forwards LER 79-011/01T-0 + (05:00:16, 5 January 2025)
- 05000368/LER-1979-069-03, /03L-0:on 790814,diesel Generator 2 Could Not Be Stopped from Control Room Handswitch 2HS-2829-2 During Mode 2 Operation.Caused by Internal Spring on Handswitch Contact Being Out of Adjustment.Spring & Switch Contacts Adjust + (05:00:18, 5 January 2025)
- 05000368/LER-1979-064-03, /03L-0:on 790807,trips in Plant Protection Sys D Placed in Bypass to Investigate Oscillations in delta-T Power Indication.Caused by Cold Leg Temp Indication Oscillation.All Related Signal Connections Tightened + (05:00:21, 5 January 2025)
- 05000368/LER-1979-067-04, /04L-0:on 790808,auxiliary Bldg Radwaste Area Radiation Monitor 2RE-E542 Sample Pump Found W/Broken Coupling.Cause Not Stated.Plastic Coupling Replaced W/Metal Coupling.Appropriate Grab Samples Taken + (05:00:23, 5 January 2025)
- 05000368/LER-1979-068-03, /03L-0:on 790812,emergency Feedwater Flow Control Valve 2CV-1025-1 from Pump 2P7B to Steam Generator a Failed to Fully Close from Control Room Demand Signal.Caused by Nonalignment of Limit Stop Switch.Switch Realigned + (05:00:26, 5 January 2025)
- ML19208A100 + (05:00:27, 5 January 2025)
- 05000338/LER-1979-104-01, /01T-0:on 790823,feeder Breakers to Several Electrical Penetrations Found Not Set to Protect Penetration Integrity for Range of Faults.Caused by Design Problem + (05:00:28, 5 January 2025)
- 05000338/LER-1979-104, Forwards LER 79-104/01T-0 + (05:00:31, 5 January 2025)
- 05000324/LER-1979-071-03, /03L-0:on 790808,RHR Sys Pump 2D Vibrated at Level Higher than Allowable Limit During RHR Sys Operational Component Test.Caused by Spring Part Lodged in Vane of Impeller.Part Removed,Pump Inspected & Tested + (05:00:34, 5 January 2025)
- 05000219/LER-1979-026-03, /03L-0:on 790807,while Excavating to Repair Equipment Drain Tank Line,Leak in Laundry Tank Discharge Pipe Discovered.Caused by Levels of Mn-54 & Co-60.Line Temporarily Rerouted Until Repairs Made + (05:00:35, 5 January 2025)
- 05000295/LER-1979-042-99, /99X-0:on 790523,during Safeguards Logic Testing at 98% Power,Inadvertent Power Trip & Safety Injection Was Initiated.Caused by Operator Error.Operator Was Reinstructed + (05:00:39, 5 January 2025)
- 05000219/LER-1979-026, Forwards LER 79-026/03L-0 + (05:00:41, 5 January 2025)
- 05000295/LER-1979-042, Forwards LER 79-042/99X-0 + (05:00:43, 5 January 2025)