Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19248C920 + (16:29:47, 4 January 2025)
- ML19248C919 + (16:29:48, 4 January 2025)
- ML19248C918 + (16:29:50, 4 January 2025)
- ML19248C916 + (16:29:54, 4 January 2025)
- ML19248C915 + (16:29:55, 4 January 2025)
- ML19248C914 + (16:29:57, 4 January 2025)
- ML19248C913 + (16:29:58, 4 January 2025)
- ML19248C912 + (16:30:00, 4 January 2025)
- ML19248C908 + (16:30:01, 4 January 2025)
- ML19248C906 + (16:30:03, 4 January 2025)
- ML19248C905 + (16:30:04, 4 January 2025)
- ML19248C900 + (16:30:05, 4 January 2025)
- ML19248C899 + (16:30:06, 4 January 2025)
- ML19248C896 + (16:30:13, 4 January 2025)
- ML19248C895 + (16:30:14, 4 January 2025)
- 05000282/LER-1979-018-03, /03L-0 on 790531:SP-1187 Diesel Fire Pump Weekly Battery Insp Not Performed in Fifth Week of Jan 1979. Procedures Changed to Require Fifth Signature Block on Data Sheets for Months W/Five Weekly Insps + (16:30:16, 4 January 2025)
- ML19248C893 + (16:30:17, 4 January 2025)
- ML19248C891 + (16:30:18, 4 January 2025)
- ML19248C889 + (16:30:19, 4 January 2025)
- ML19248C885 + (16:30:20, 4 January 2025)
- ML19248C883 + (16:30:21, 4 January 2025)
- ML19248C881 + (16:30:22, 4 January 2025)
- 05000282/LER-1979-018, Forwards LER 79-018/03L-0 + (16:30:23, 4 January 2025)
- ML19248C870 + (16:30:25, 4 January 2025)
- ML19248C869 + (16:30:26, 4 January 2025)
- ML19248C868 + (16:30:28, 4 January 2025)
- EPID:L-2019-OLL-0045 + (16:30:29, 4 January 2025)
- ML19248C866 + (16:30:29, 4 January 2025)
- ML19248C860 + (16:30:31, 4 January 2025)
- ML19248C856 + (16:30:32, 4 January 2025)
- ML19248C848 + (16:30:33, 4 January 2025)
- ML19248C850 + (16:30:33, 4 January 2025)
- NUREG-0478, Confirms 790508 Deliery of Metropolitan Siting - Historical Perspective (NUREG-0478,Oct 1978) + (16:30:34, 4 January 2025)
- ML19248C841 + (16:30:36, 4 January 2025)
- 05000366/LER-1979-052-03, /03L-0 on 790612:reactor Cooldown Max Rate of 100 F/H Was Exceeded.Caused by Manually Starting HPCI During Scram,Resulting in Rapid Pressure.Personnel Admonished + (16:30:37, 4 January 2025)
- ML19248C839 + (16:30:38, 4 January 2025)
- 05000366/LER-1979-052, Forwards LER 79-052/03L-0 + (16:30:40, 4 January 2025)
- ML19248C835 + (16:30:41, 4 January 2025)
- ML19248C834 + (16:30:42, 4 January 2025)
- ML19248C828 + (16:30:44, 4 January 2025)
- ML19248C832 + (16:30:44, 4 January 2025)
- ML19248C824 + (16:30:46, 4 January 2025)
- ML19248C823 + (16:30:47, 4 January 2025)
- ML19248C822 + (16:30:47, 4 January 2025)
- ML19248C817 + (16:30:49, 4 January 2025)
- ML19248C816 + (16:30:50, 4 January 2025)
- 05000368/LER-1979-038-03, /03L-0 on 790527:during Main Steam Safety Valve Testing in Mode 3 Operation,Steam Generator a Pressure indicator,2PI-1041-4 on Channel Dpps,Failed High.Caused by Heat Breakdown of Some Component + (16:30:51, 4 January 2025)
- ML19248C813 + (16:30:54, 4 January 2025)
- IR 05000327/1979023 + (16:30:55, 4 January 2025)
- 05000368/LER-1979-039-03, /03L-0 on 790527:during NRC Audit of Category E Valve Positions,While in Mode 3 Operation,Low Pressure Safety Injection Discharge Header Valve 25I-5091-3 Was Discovered in Closed Position.Cause Unstated.Valve Opened + (16:30:57, 4 January 2025)
- ML19248C809 + (16:30:59, 4 January 2025)
- ML19248C804 + (16:30:59, 4 January 2025)