ML19248C893
| ML19248C893 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/30/1979 |
| From: | Head J SOUTHERN CALIFORNIA EDISON CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 7907050413 | |
| Download: ML19248C893 (1) | |
Text
[J[Nb' Southern Celifornia Edison Company
}, Y 3,,
n o nox coo 2244 WALNUT GFrovE AVE NU E ROS E M E AD, C Att r o n N I A 9177 0 J
T.
HEAD,Jn, rr(re,4aur
..a.....'
April 30, 1979 s
U. S. I;uclear Rcgulatory Commission Of fice of Inspection and I'nforcement
,7 Region V G'
Walaut Creek Plaza, Suite 202 h,. (if f Sh..
. / @ ?p,p ra p p)
~
1990 Dorth California Boulevard Walnut Creek, California 94595 J
Attention:
Mr. R. II. Engelken, Director Docket 50-206 San Onofre Unit I lbar Sir:
IE Bulletin tb. 79-04 Incorrect Weights for Velan Swing Check Valve The subject IE Bullet.in was foniarded to fir. J. B. Moore with your letter dated March 30, 1979.
The response to the items in the referenced IE Bulletin No. 79-04 are listed belo.v.
Item 1 List all Seinnic Category I piping systems (or portions thereof) where 3, 4, or 6 inch diameter Velan swing check valves are ird stalled or are scheduled to be installed.
Response
Detailed investigation of system's caaponents has disclosed that at SONGS 1 there are no Velan swing check valves installed on any k
systcm.
The recponse to Item 1 nullifies the applicability of Iteras 2 through 6.
Sincerely,
- h )/ pc'd-
< n.
cc:
Director, Of fice of Inspection arx3 Enforcement, Division of Reactor Operations Inspection 7 90705 0 4 a 261
.c..