Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000302/LER-1986-020-01, :on 860929,discovered That Interval for Performance of Tech Spec 4.4.10.b Re Operability of Reactor Vessel Vent Valves Exceeded.Caused by Undetected Typo.Addl Review Identified Several Similar Events + (10:50:43, 4 December 2024)
- ML20212J684 + (10:50:45, 4 December 2024)
- ML20212J685 + (10:50:45, 4 December 2024)
- ML20212J683 + (10:50:46, 4 December 2024)
- ML20212J677 + (10:50:47, 4 December 2024)
- ML20212J675 + (10:50:47, 4 December 2024)
- ML20212J672 + (10:50:49, 4 December 2024)
- ML20212J671 + (10:50:50, 4 December 2024)
- ML20212J669 + (10:50:51, 4 December 2024)
- ML20212J662 + (10:50:53, 4 December 2024)
- ML20212J660 + (10:50:54, 4 December 2024)
- ML20212J661 + (10:50:54, 4 December 2024)
- ML20212J656 + (10:50:55, 4 December 2024)
- ML20212J655 + (10:50:57, 4 December 2024)
- HBL-87-002, Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan + (10:51:30, 4 December 2024)
- ML20212J650 + (10:51:31, 4 December 2024)
- ML20212J648 + (10:51:32, 4 December 2024)
- ML20212J649 + (10:51:32, 4 December 2024)
- ML20212J647 + (10:51:33, 4 December 2024)
- ML20212J642 + (10:51:33, 4 December 2024)
- ML20212J641 + (10:51:34, 4 December 2024)
- ML20212J640 + (10:51:34, 4 December 2024)
- TXX-6226, Interim Deficiency Rept CP-86-68 Re Provisions for Weather Protection of Class 1E Components Used in Outdoor Installations.Field Verification Program Being Developed. Next Rept Will Be Submitted by 870515 + (10:51:35, 4 December 2024)
- ML20212J637 + (10:51:36, 4 December 2024)
- ML20212J636 + (10:51:36, 4 December 2024)
- ML20212J631 + (10:51:39, 4 December 2024)
- ML20212J629 + (10:51:40, 4 December 2024)
- ML20212J628 + (10:51:40, 4 December 2024)
- ML20212J627 + (10:51:41, 4 December 2024)
- ML20212J624 + (10:51:42, 4 December 2024)
- ML20212J625 + (10:51:42, 4 December 2024)
- IR 05000282/1999007 + (10:51:45, 4 December 2024)
- ML20212J622 + (10:51:45, 4 December 2024)
- ML20212J620 + (10:51:46, 4 December 2024)
- ML20212J619 + (10:51:47, 4 December 2024)
- ML20212J618 + (10:51:47, 4 December 2024)
- ML20212J615 + (10:51:48, 4 December 2024)
- ML20212J612 + (10:51:49, 4 December 2024)
- ML20212J613 + (10:51:49, 4 December 2024)
- ML20212J610 + (10:51:51, 4 December 2024)
- ML20212J606 + (10:51:52, 4 December 2024)
- TXX-6234, Interim Deficiency Rept CP-86-12 Re Attachments at or Near Design Gaps Between Secondary Walls & Adjacent Walls/Floors. Initially Reported on 860227.Evaluation Continuing.Next Rept Expected by 870327 + (10:51:53, 4 December 2024)
- ML20212J601 + (10:51:53, 4 December 2024)
- ML20212J599 + (10:51:54, 4 December 2024)
- ML20212J594 + (10:51:55, 4 December 2024)
- ML20212J598 + (10:51:55, 4 December 2024)
- 05000373/LER-1987-005-01, :on 870131,reactor Scram Occurred on Turbine Stop Valve Fast Closure Due to Loss of Alternator Exciter Field.Caused by Degradation of Collector Brushes Due to Insp Failure.Brushes Replaced.Insps Upgraded + (10:51:57, 4 December 2024)
- ML20212J590 + (10:51:58, 4 December 2024)
- ML20212J591 + (10:51:58, 4 December 2024)
- ML20212J587 + (10:51:59, 4 December 2024)
- ML20212J585 + (10:52:00, 4 December 2024)
- TXX-6208, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 860915.Review Continuing.Final Rept Expected by 870313 + (10:52:00, 4 December 2024)