Submits Containment Isolation Sys Design Review FSAR Update Commitment Correction.Correct Date for Scheduled FSAR Update 880415,not 870415.Commitment List Encl
ML20212J613
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/27/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Youngblood B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 8703090068
Download: ML20212J613 (3)


Text

.

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place FEB 271987 .

I U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Reactor Regulation Washington, D.C. 20555 Attention: Mr. B. J. Youngblood In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - CONTAINMENT ISOLATION SYSTEM DESIGN REVIEW -

FINAL SAFETY ANALYSIS REPORT (FSAR) UPDATE COMMITMENT CORRECTION Our letter dated February 13, 1987, identified a tentative schedule to update the SQN FSAR to reflect resolution of containment isolation design issues.

The body of the letter incorrectly gave the tentatively scheduled FSAR update as April 15, 1987. The correct date, pending NRC approval by September 15, 1987, of SQN submittals currently under review, is April 15, 1988. The correct date was, however, given in the comunitment list e1 closed with our February 13, 1987 letter. That conunitment to update the SQN Flut is again given in the enclosure to this submittal.

Please direct any additional questions you may have regarding this or any Other CQN containment isolation issuen to Timothy S. Andreychek at

615) 870-7470.

Very truly yours, TENNESSEE VALLEY AUTHORITY

/

R. Gridley, D ector Nuclear Safet and Licensing Enclosure cc: see page 2 AoS3 e70309ooets ts70227 I PDR ADOCK 05000327 p PDR An Equal Opportunity Employer

r-o n

U.S. Nuclear Regulatory Commission P cc (Enclosure):

U.S. Nuclear Regulatory Commission Region II Attn: Dr. J. Nelson Grace, ReSi onal Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. J. Holonich Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Mr. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georsia 30323 Sequoyah Resident Inspector ,

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 1-(

l l

l i

l

ENCLOSURE SEQUOYAH NUCLEAR PLANTS UNITS 1 AND 2 CONTAINMENT ISOLATION SYSTEM DESIGN FSAR AMENDMENT COMMITMENTS ACTIVITY COMMITMENT DATE Amend FSAR to reflect revised April 15, 1988

  • containment isolation system design as accepted by NRC.
  • This commitment date is contingent upon receipt of NRC acceptance of the SQN containment isolation design description by September 15, 1987. If acceptance is not received by that date, the commitment date slips one year.

0826h

.