Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215N187 + (02:22:03, 4 December 2024)
- IR 05000400/1986083 + (02:22:03, 4 December 2024)
- BSEP-86-1490, Forwards Supplemental Response to Violation 1 Noted in Insp Repts 50-324/85-26 & 50-325/85-26.Failure to Sufficiently Analyze Rockbestos Firewall III Cable Documentation Denied. Argument Supporting Denial Presented + (02:22:04, 4 December 2024)
- ML20215N181 + (02:22:05, 4 December 2024)
- ML20215N180 + (02:22:07, 4 December 2024)
- ML20215N179 + (02:22:07, 4 December 2024)
- ML20215N178 + (02:22:08, 4 December 2024)
- ML20215N176 + (02:22:10, 4 December 2024)
- 05000327/LER-1986-045, :on 861002,short Occurred in Remote Control Power Branch Circuit Resulting in Blown MIS-5 Fuse in Feeder Circuit C42.Caused by Deenergized Wire Touching Energized Part of Circuit During Maint + (02:22:12, 4 December 2024)
- ML20215N173 + (02:22:13, 4 December 2024)
- 05000317/LER-1986-006-01, :on 861010,reactor Tripped Due to Loss of Load Trip as Result of Turbine Trip from Partial Loss of Condenser Vacuum.Caused by Operator Error.Operating Shift Will Be Briefed on Test Procedure + (02:22:15, 4 December 2024)
- IR 05000416/1986031 + (02:22:17, 4 December 2024)
- ML20215N168 + (02:22:18, 4 December 2024)
- ML20215N167 + (02:22:19, 4 December 2024)
- ML20215N165 + (02:22:19, 4 December 2024)
- ML20215N162 + (02:22:20, 4 December 2024)
- ML20215N161 + (02:22:20, 4 December 2024)
- ML20215N156 + (02:22:21, 4 December 2024)
- ML20215N159 + (02:22:21, 4 December 2024)
- IR 05000416/1986030 + (02:22:22, 4 December 2024)
- ML20215N152 + (02:22:23, 4 December 2024)
- PNO-III-86-123, on 861027,television Station Received Anonymous Call Re Obstruction of Burlington Northern Railroad Track Which Serves as Route for Reactor Spent Fuel Shipment.Barricade Found & 39-ft Section of Track Missing + (02:22:24, 4 December 2024)
- ML20215N150 + (02:22:24, 4 December 2024)
- 05000461/LER-1986-011, :on 861016,automatic Initiation of Div 1 Shutdown Svc Water Sys Pump Occurred.Caused by Deficiency in Surveillance Procedure.Procedure Corrected Using Procedure Deviation for Rev (PDR) 86-1271 + (02:22:26, 4 December 2024)
- ML20215N147 + (02:22:28, 4 December 2024)
- ML20215N144 + (02:22:29, 4 December 2024)
- 05000255/LER-1986-036, :on 860930,discovered That Svc Water Sys Pumps Incapable of Meeting Flow/Head Values of 8,000 Gpm Per Fsar. Caused by Installation of Incorrect Pump Impellers.Periodic Testing Will Be Implemented + (02:22:31, 4 December 2024)
- ML20215N142 + (02:22:33, 4 December 2024)
- ML20215N141 + (02:22:33, 4 December 2024)
- IR 05000369/1986025 + (02:22:35, 4 December 2024)
- ML20215N139 + (02:22:35, 4 December 2024)
- 05000461/LER-1986-015, :on 861021,during Removal of Panel,Panel Slipped Into Exposed Breaker Handles,Causing All Even Numbered Breakers to Change to Off Position.Caused by Lack of Attention to Detail.Breakers Restored + (02:22:37, 4 December 2024)
- ML20215N134 + (02:22:37, 4 December 2024)
- ML20215N133 + (02:22:38, 4 December 2024)
- ML20215N132 + (02:22:39, 4 December 2024)
- ML20215N131 + (02:22:39, 4 December 2024)
- ML20215N130 + (02:22:40, 4 December 2024)
- ML20215N128 + (02:22:41, 4 December 2024)
- ML20215N127 + (02:22:42, 4 December 2024)
- ML20215N125 + (02:22:43, 4 December 2024)
- ML20215N126 + (02:22:43, 4 December 2024)
- 05000482/LER-1986-053, :on 860930,hourly Patrols of One Impairment Not Performed as Required by Tech Spec 3.7.11.Caused by Personnel Error.Fire Impairment Initiated.Rept Incorporated Into Required Reading for Operating Personnel + (02:22:45, 4 December 2024)
- 05000482/LER-1986-050, :on 860925,resident Inspector Discovered That Fire Door 15031 Defeated by Piece of Foreign Matl,Violating Tech Spec 3.7.11.Caused by Personnel Neglecting to Ensure Proper Closure of Door.Personnel Counseled + (02:22:47, 4 December 2024)
- 05000482/LER-1986-051, :on 860925,spent Fuel Pool Crane Overload Limit Found Improperly Adjusted from 860923-25,while Fuel Moved in & Around Spent Fuel Storage Facility,In Violation of Tech Spec 3.9.7.Caused by Personnel Error + (02:22:48, 4 December 2024)
- ML20215N119 + (02:22:49, 4 December 2024)
- ML20215N118 + (02:22:49, 4 December 2024)
- 05000528/LER-1986-052, :on 860905,discovered Reactor Protection Sys Channel B Reactor Coolant Low Flow Trip Setpoint Set Nonconservatively.Caused by Personnel Error.Disciplinary Action Taken & Procedures Changed + (02:22:51, 4 December 2024)
- ML20215N116 + (02:22:52, 4 December 2024)
- 05000461/LER-1986-010, :on 861015,main Control Room Received Auto Initiation of Reactor Protection Sys Trip Function.Caused by Spurious Divisional Main Steam Line Radiation hi-hi or Inoperable Trip.Shielding Added + (02:22:54, 4 December 2024)
- IR 05000333/1986016 + (02:22:55, 4 December 2024)
- ML20215N112 + (02:22:55, 4 December 2024)