ML20215N125
| ML20215N125 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/27/1986 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| GN-1139, NUDOCS 8611040319 | |
| Download: ML20215N125 (1) | |
Text
Georgia Fbwer Company Pbst Offic3 Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.
Post Office Box 2625 B;rmingham Alabama 35202 Vogtle Project wepnene 20s 8' *"
October 27, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-1139 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 REF: BAILEY TO DENTON, DATED 7/24/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC CENERATING PLANT - UNITS 1 AND 2 SER LICENSE CONDITION 12: RVLIS IMPLEMENTATION REPORT
Dear Mr. Denton:
In the referenced letter a commitment was made to provide your staff with the reactor vessel level instrumentation system (RVLIS) implementation le'tter report within 90 days after receipt of the Westinghouse analysis report on RVLIS testing. The implementation letter report will however be submitted to your staff prior to the commencement of commercial operation which is presently scheduled for June'1, 1986.
If your staff requires any additional information, please do not hesitate to contact me.
Sincerely, V J. A. Bailey Project Licensing Manager JAB /sm NRC Regional ' dministrator xc R._E.
Conway A
R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. A. McManus M. A. Miller (2)
L. T. Cucwa r
-B.
Jones, Esquire Vogtle Project File G. Bockhold, Jr.
I p kk j h K 05000424 9 861027 0819V E