Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216B061 + (02:07:38, 4 December 2024)
- ML20216B062 + (02:07:38, 4 December 2024)
- PNO-I-98-010, on 980316,NRC Model P-2051 Nuclear Ion Air Gun Containing Po-210 Was Found to Be Missing by Sonoco.Complete Search of Plant Was Performed But Device Was Not Found. Region I Notified by Ltr on 980330 + (02:07:39, 4 December 2024)
- ML20216B056 + (02:07:40, 4 December 2024)
- ML20216B055 + (02:07:41, 4 December 2024)
- ML20216B054 + (02:07:42, 4 December 2024)
- ML20216B053 + (02:07:43, 4 December 2024)
- ML20216B052 + (02:07:43, 4 December 2024)
- ML20216B051 + (02:07:44, 4 December 2024)
- ML20216B049 + (02:07:45, 4 December 2024)
- 05000339/LER-1998-002-02, :on 980411,average of as Found Setpoints for Three Pressurizer Safety Valves Exceeded Setpoint Tolerance Allowed by TS 3.4.3.1.Caused by Setpoint Drift.Pressurizer Safety Valves Disassembled,Inspected & Repaired + (02:07:48, 4 December 2024)
- ML20216B046 + (02:07:49, 4 December 2024)
- ML20216B044 + (02:07:52, 4 December 2024)
- SNRC-1347, Forwards QC Div 1986 Staffing Rept Re Suffolk County Contention 13(d) Settlement Agreement.Util Obligations Settlement Agreement Fulfilled + (02:07:52, 4 December 2024)
- ML20216B041 + (02:07:53, 4 December 2024)
- ML20216B035 + (02:07:54, 4 December 2024)
- ML20216B032 + (02:07:55, 4 December 2024)
- ML20216B034 + (02:07:55, 4 December 2024)
- PNO-IV-97-049, on 970902,lab Researcher Inadvertently Disposed of Vial Containing 250 Uci of P-32 Via Normal Trash.Package Contained Three P-32 Vials.Trash Tracted to Local Landfill But P-32 Vial Has Not Been Located + (02:07:56, 4 December 2024)
- ML20216B029 + (02:07:57, 4 December 2024)
- ML20216B027 + (02:07:57, 4 December 2024)
- ML20216B025 + (02:07:58, 4 December 2024)
- ML20216B024 + (02:07:58, 4 December 2024)
- IR 05000271/1997012 + (02:08:03, 4 December 2024)
- ML20216B021 + (02:08:04, 4 December 2024)
- ML20216B018 + (02:08:05, 4 December 2024)
- ML20216B016 + (02:08:06, 4 December 2024)
- ML20216B017 + (02:08:06, 4 December 2024)
- ML20216B014 + (02:08:07, 4 December 2024)
- ML20216B011 + (02:08:08, 4 December 2024)
- 05000339/LER-1998-002, Forwards LER 98-002-00,applicable to North Anna Unit 2.Rept Has Been Reviewed by Station Nuclear Safety Operating Committee & Will Be Forwarded to Mgt Safety Review Committee for Review + (02:08:09, 4 December 2024)
- ML20216B008 + (02:08:10, 4 December 2024)
- ML20216B005 + (02:08:10, 4 December 2024)
- ML20216B002 + (02:08:11, 4 December 2024)
- ML20216B004 + (02:08:11, 4 December 2024)
- ML20216B000 + (02:08:12, 4 December 2024)
- ML20216A999 + (02:08:13, 4 December 2024)
- ML20216A998 + (02:08:14, 4 December 2024)
- ML20216A995 + (02:08:15, 4 December 2024)
- BSEP-98-0073, Forwards Proprietary Draft,Unsigned Personal Qualification Statements for Each Applicant Scheduled to Participate in Upcoming Licensing Exams & NRC Form 396.Proprietary Encl Withheld (Ref 10CFR2.790(a)(6)) + (02:08:16, 4 December 2024)
- L-87-033, Application for Amends to Licenses DPR-71 & DPR-62,revising Tech Spec Section 3.11.2.3 to Allow Incineration of Radwaste Oil & Table 4.11.2-1 to Require Grab Sample Analysis of Each Batch Per 10CFR50,App I.Fee Paid + (02:08:16, 4 December 2024)
- ML20216A991 + (02:08:17, 4 December 2024)
- 05000412/LER-1998-005-01, :on 980402,inadequate FP SS Analysis for Boric Acid to Boric Acid Blender valve,2CHS*FCV113A,was Noted. Caused by Oversight of Missing Support Cables.Control Circuit of 2CHS*FCV113A Will Be Modified + (02:08:19, 4 December 2024)
- ML20216A988 + (02:08:20, 4 December 2024)
- ML20216A989 + (02:08:20, 4 December 2024)
- ML20216A987 + (02:08:21, 4 December 2024)
- ML20216A985 + (02:08:22, 4 December 2024)
- ML20216A984 + (02:08:22, 4 December 2024)
- ML20216A980 + (02:08:23, 4 December 2024)
- ML20216A983 + (02:08:23, 4 December 2024)
- 05000352/LER-1998-006, :on 980405,post Maint Surveillance Test Was Not Performed for A2 RPS Channel Relay Replacement.Caused by Incomplete Document Review.Relay Work Was Reviewed to Evaluate & Resolve Impact of Relay Work on Any Required Sys + (02:08:25, 4 December 2024)
- ML20216A977 + (02:08:26, 4 December 2024)