Forwards Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted
ML20216B016
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 04/08/1998
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20216B019 List:
References
70-7001-98-07, 70-7001-98-7, NUDOCS 9804130350
Download: ML20216B016 (3)


Text

[

10 -

.]

l.:

1 l.

April 8, 1998 l

y.

L Mr. J. H. Miller i

Vice President - Production

(

United States Enrichment Corporation Two Democracy Center

6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

NRC INSPECTION REPORT 70-7001/98007(DNMS) o L

Dear Mr. Miller:

- On March 20,1998, the NRC completed an operrstor training inspection at your Paducah Gaseous Diffusion Plant. The purpose of the inspection was to determine whether activities l

. authorized by the certificate were conducted safely and in accordance with NRC requirements.

l At the conclusion of the. inspection, the inspector discussed the findings with members of your j

. staff as identified in the enclosed report.

i L

' Areas examined during the inspection are identified in the report. Within these areas', the i

inspection consisted of a selective examination of procedures and representative records, i

interviews with personnel, and observations of activities in progress. No violations of NRC requirements.were identified.

Based upon the results of the inspection, the NRC identified an Unresolved item which is described in the enclosed report. You are requested to respond to the Unresolved item within thirty days of the date of this letter. Your response should identify the criteria used to determine which staff are covered by the requirements of 10 CFR 76.95 and the adequacy of your current training program for cascade first-line managers that supervise Area Control Room

.l activities, including the safety basis for recent changes to the first-line manager training j

, requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room.

]

)

l i:

4

'9804130350 980400

~

PDR ADOCK 07007001

.C PDR J

'J. Miller e We will gladly discuss any questions you have conceming these observations.

Sincerely, Original Signed by J.

Kniceley for Patrick L. Hiland, Chief Fuel Cycle Branch Docket No. 70-7001 Certificate No. GDP-1

Enclosure:

Inspection Report 70-7001/98007(DNMS) cc w/enet:

S. A. Polston, Paducah General Manag:r L. L. Jackson, Paducah Regulatory Affairs Manager J. M. Brown, Portsmouth General Manager S. A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC Paducah Resident inspector Office Portsmouth Resident inspector Office R. M. DeVault, Regulatory Oversight Manager J. C. Hodges, Paducah Site Manager, DOE DOCUMENT NAME: G\\SEC\\ PAD 98007.DNM To receive a copy of thie document, indicate in the box:"C" = Copy without enclosure 'E" = Copy with enclosure"N"= No copy OFFICE Rill C.

Rit!

I l

l NAME Blanchard:ib%lf : Hiland hfd b DATE 04/2'/98 Ot/ f /98 j

OFFICML RECORD COPY t

4

?

,e

.g.

I J. Miller l

- Distribution:

Docket File w/enct PUBLIC IE-07 w/enci OCFO/LFARB w/ encl A. B. Beach, Rill w/enci

- J. L. Caldwell, Rill w/enci

?

C. D. Pederson, Rlll w/enci -

Rlli Enf. Coordinator w/enct R. Pierson, NMSS w/enct P. Ting, NMSS w/enct W. Schwink, NMSS w/enci P. Harich, NMSS w/enci M. L. Hom, NMSS w/enci R. Bellamy, RI w/enci

- EJM, Rll w/enci (e-mail)