Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327B245 + (12:53:31, 31 December 2024)
- ML19327B242 + (12:53:32, 31 December 2024)
- ML19327B241 + (12:53:38, 31 December 2024)
- ML19327B240 + (12:53:41, 31 December 2024)
- ML19327B239 + (12:53:47, 31 December 2024)
- ML19327B238 + (12:53:48, 31 December 2024)
- ML19327B236 + (12:53:51, 31 December 2024)
- ML19327B235 + (12:53:53, 31 December 2024)
- ML19327B234 + (12:53:54, 31 December 2024)
- ML19327B232 + (12:53:55, 31 December 2024)
- ML19327B231 + (12:53:56, 31 December 2024)
- BECO-89-156, Responds to Generic Ltr 89-07 Re Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs.Changes Made to Contingency Plan,Per 10CFR50.54.Plan Withheld (Ref 10CFR73.21) + (12:53:59, 31 December 2024)
- ML19327B228 + (12:54:01, 31 December 2024)
- ML19327B227 + (12:54:02, 31 December 2024)
- ML19327B225 + (12:54:04, 31 December 2024)
- ML19327B222 + (12:54:40, 31 December 2024)
- LD-89-108, Forwards Figures 1,2,2A,3,4 & 5 from C-E Nucelar Fuel Mfg License Compliance Status Rept Transmitted in ,Per Confirmatory Action Ltr 88-23,Item 5.Encls I & II Provide Sept 1989 Status Rept.W/Six Oversize Figures + (12:54:47, 31 December 2024)
- 05000311/LER-1989-015-02, :on 890918,discovered That Channel Calibr for Containment Wide Range Pressure post-accident Channels Not Done within Required Time Frame.Caused by Weak Tech Spec Amend Implementation in 1987.Process Upgraded + (12:54:53, 31 December 2024)
- 3F1089-16, Forwards Description of Electrical Enhancement Plan to Upgrade Understanding of Plant Electrical Design Basis. Configuration Which Existed Prior to Recent Changes Under Evaluation to Verify Design Capability + (12:54:55, 31 December 2024)
- ML19327B219 + (12:54:55, 31 December 2024)
- 05000499/LER-1989-022, :on 890919,overtemp Delta Temp Turbine Runback Occurred,Resulting in Reactor Trip.Caused by Turbine Setpoint Design Intolerance of Small Temp Deviations.Runback Feature Disabled & Analysis Performed + (12:54:59, 31 December 2024)
- ML19327B212 + (12:55:12, 31 December 2024)
- ML19327B211 + (12:55:18, 31 December 2024)
- ML19327B209 + (12:55:24, 31 December 2024)
- 05000353/LER-1989-008-02, :on 890922,discovered That Normally Open Manual Emergency Svc Water Isolation Valve Found to Be in Closed Position.Exact Cause Not Determined.Valve Promptly Opened. Administrative Procedure A-8 Revised + (12:55:26, 31 December 2024)
- ML19327B207 + (12:55:32, 31 December 2024)
- ML19327B204 + (12:55:33, 31 December 2024)
- ML19327B203 + (12:55:33, 31 December 2024)
- ML19327B201 + (12:55:39, 31 December 2024)
- ML19327B199 + (12:55:45, 31 December 2024)
- ML19327B198 + (12:55:46, 31 December 2024)
- ML19327B196 + (12:55:53, 31 December 2024)
- ML19327B194 + (12:56:08, 31 December 2024)
- IR 05000295/1989033 + (12:56:14, 31 December 2024)
- ML19327B191 + (12:56:21, 31 December 2024)
- ML19327B189 + (12:56:27, 31 December 2024)
- ML19327B187 + (12:56:33, 31 December 2024)
- ML19327B188 + (12:56:33, 31 December 2024)
- ML19327B186 + (12:56:39, 31 December 2024)
- 05000334/LER-1989-011-01, :on 890920,engineering Determined That Rupture Restraint Gaps Were Opened to Greater than Original Design Analysis.Caused by Alignment Performed During Hot Functional Testing.Design Change Mod to Be Performed + (12:56:41, 31 December 2024)
- 1CAN108908, Monthly Operating Rept for Sept 1989 for Arkansas Nuclear One Unit 1 + (12:56:42, 31 December 2024)
- ML19327B182 + (12:56:44, 31 December 2024)
- ML19327B180 + (12:56:50, 31 December 2024)
- ML19327B181 + (12:56:50, 31 December 2024)
- IR 05000498/1989034 + (12:57:00, 31 December 2024)
- ML19327B177 + (12:57:07, 31 December 2024)
- ML19327B175 + (12:57:12, 31 December 2024)
- ML19327B173 + (12:57:13, 31 December 2024)
- ML19327B172 + (12:57:14, 31 December 2024)
- ML19327B171 + (12:57:14, 31 December 2024)
- ML19327B170 + (12:57:15, 31 December 2024)
- B13358, Application for Amend to License NPF-49,changing Tech Specs to Require Both Input Relay Trains of Any Reactor Protection Sys or ESFs Channel to Be Included in Response Time Testing of Channel + (12:57:16, 31 December 2024)