Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327C049 + (12:25:10, 31 December 2024)
- ML19327C047 + (12:25:11, 31 December 2024)
- ML19327C046 + (12:25:12, 31 December 2024)
- 3F1189-02, Submits Supplemental Info Re Resolution of Decay Heat Pump Operation at Low Flowrates,Per Util 890615 Commitment.Util Will Establish Realistic Decay Heat Pump Low Flow Rate Operating Time Limit to Bring Plant to Safe Condition + (12:25:13, 31 December 2024)
- ML19327C043 + (12:25:16, 31 December 2024)
- ML19327C042 + (12:25:17, 31 December 2024)
- ML19327C041 + (12:25:17, 31 December 2024)
- ML19327C039 + (12:25:18, 31 December 2024)
- NRC-89-0222, Responds to Generic Ltr 89-07 & Suppl 1, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Short-term Actions Initiated to Protect Against Radiological Sabotage by Subj Method + (12:25:19, 31 December 2024)
- ML19327C037 + (12:25:20, 31 December 2024)
- ML19327C036 + (12:25:21, 31 December 2024)
- ML19327C035 + (12:25:22, 31 December 2024)
- ML19327C032 + (12:25:24, 31 December 2024)
- ML19327C033 + (12:25:24, 31 December 2024)
- B13397, Responds to NRC Re Violations Noted in Insp Repts 50-245/89-80,50-336/89-80 & 50-423/89-80.Corrective Actions: NPRDS Task Force Created to Determine Stds of Performance & to Review Component Failure Analysis Rept + (12:25:26, 31 December 2024)
- ELV-01045, Responds to NRC Bulletin 88-010,Suppl 1.Util Successfully Completed Traceability Reviews on Approx 700 Breakers. Remaining Reviews Scheduled for Completion by 900102 + (12:25:28, 31 December 2024)
- ML19327C028 + (12:25:30, 31 December 2024)
- ML19327C027 + (12:25:30, 31 December 2024)
- 0CAN118909, Informs of Schedule for Submittal of Addl SPDS Info, Consisting of Isolation Device Failure Analysis.Results Will Be Available for Submittal by 900228 + (12:25:31, 31 December 2024)
- ML19327C024 + (12:25:39, 31 December 2024)
- ML19327C023 + (12:25:48, 31 December 2024)
- TAC:74174 + (12:25:49, 31 December 2024)
- ML19327C020 + (12:25:54, 31 December 2024)
- TAC:74503 + (12:25:55, 31 December 2024)
- ML19327C019 + (12:26:01, 31 December 2024)
- ML19327C018 + (12:26:02, 31 December 2024)
- ML19327C017 + (12:26:08, 31 December 2024)
- ML19327C016 + (12:26:20, 31 December 2024)
- TAC:74218 + (12:26:21, 31 December 2024)
- ML19327C014 + (12:26:27, 31 December 2024)
- ML19327C013 + (12:26:32, 31 December 2024)
- ML19327C012 + (12:26:38, 31 December 2024)
- TAC:74176 + (12:26:39, 31 December 2024)
- ML19327C010 + (12:26:45, 31 December 2024)
- ML19327C006 + (12:26:46, 31 December 2024)
- ML19327C005 + (12:26:46, 31 December 2024)
- 05000423/LER-1989-023, :on 891006,discovered That All Hydrant Hose Houses Did Not Have Required Fire Hose Lengths to Fulfill Operability Requirements.Caused by Personnel Error & Procedural Deficiency.Operable Status Restored + (12:26:48, 31 December 2024)
- ML19327C003 + (12:26:49, 31 December 2024)
- ML19327C002 + (12:26:55, 31 December 2024)
- ML19327C000 + (12:27:01, 31 December 2024)
- ML19327B999 + (12:27:07, 31 December 2024)
- ML19327B998 + (12:27:18, 31 December 2024)
- ML19327B997 + (12:27:24, 31 December 2024)
- ML19327B996 + (12:27:30, 31 December 2024)
- ML19327B995 + (12:27:36, 31 December 2024)
- 05000245/LER-1989-020-01, :on 890906,radiological Survey Re 890511 Release of Contaminated high-pressure Water Hydrolaser from Site Identified Contaminated Tools & Equipment Outside Control Area.Caused by Inadequate Procedures + (12:27:42, 31 December 2024)
- ML19327B993 + (12:27:44, 31 December 2024)
- ML19327B992 + (12:27:50, 31 December 2024)
- ML19327B990 + (12:27:56, 31 December 2024)
- ML19327B988 + (12:28:02, 31 December 2024)
- ML19327B987 + (12:28:03, 31 December 2024)