Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19329F982 + (10:36:08, 31 December 2024)
- 05000321/LER-1980-061, Forwards LER 80-061/01T-0 + (10:36:09, 31 December 2024)
- ML19329F979 + (10:36:20, 31 December 2024)
- AECM-80-146, Status Rept 1 Re Procedural Violation in Cutting Rebar.Stop Work Order Issued on 800530 to Stop Hole Drilling Operations for Electrical Support.Craft & Field Engineering Personnel Trained.Final Rept Will Be Submitted by 800117 + (10:36:21, 31 December 2024)
- 05000366/LER-1980-091, Forwards LER 80-091/03L-0 + (10:36:24, 31 December 2024)
- ML19329F974 + (10:36:25, 31 December 2024)
- 05000321/LER-1980-063-03, /03L-0:on 800612,while Performing Surveillance Procedure HNP-1-3102,reactor High Pressure Shutdown Cooling Mode Switch 1B31-N0l8B Found to Actuate Higher than Limit. Caused by Setpoint Drift.Switch Recalibr + (10:36:26, 31 December 2024)
- 05000346/LER-1980-046-03, /03L-0:on 800606,during Performance of ST 5095.01, Spent Fuel Pool Level Fell Below Tech Spec Requirement. Caused by Improper Alarm Setpoint.Alarm Setpoint Adjusted to Prevent Recurrence + (10:36:28, 31 December 2024)
- ML19329F971 + (10:36:29, 31 December 2024)
- ML19329F970 + (10:36:30, 31 December 2024)
- 05000346/LER-1980-046, Forwards LER 80-046/03L-0 + (10:36:31, 31 December 2024)
- AECM-80-148, Final Deficiency Rept Re Mod to Dragon Valves,Inc,Valve Manifolds.Failure of Valve Would Not Cause Malfunction During Emergency Operation of Standby Liquid Control Sys & Not Considered Reportable Per 10CFR50.55(e) + (10:36:32, 31 December 2024)
- 05000346/LER-1980-045-03, /03L-0:on 800609,while Preparing to Perform ST 5091.01,NI-2 Found Partially Disconnected from Equipment in Control Room.Apparently Caused by Personnel Error.Info Tags Hung on Coax Cables to Insure Proper Connection + (10:36:35, 31 December 2024)
- 05000321/LER-1980-063, Forwards LER 80-063/03L-0 + (10:36:37, 31 December 2024)
- ML19329F963 + (10:36:38, 31 December 2024)
- ML19329F961 + (10:36:39, 31 December 2024)
- AECM-80-140, Forwards Affidavit of Svc for Amend 40 to Fsar,Per NRC + (10:36:40, 31 December 2024)
- 05000302/LER-1980-025-03, /03L-0:on 800609,while Performing SP-112 Calibr of Reactor Protection Sys,Count Rate Amplifier for Channel a Source Range Neutron Flux Monitor Found out-of-tolerance Caused by Defective Pulse & Output Amplifier Cards + (10:36:42, 31 December 2024)
- 05000346/LER-1980-045, Forwards LER 80-045/03L-0 + (10:36:44, 31 December 2024)
- BSEP-80-1124, Forwards Monthly Operating Repts for June 1980 + (10:36:47, 31 December 2024)
- ML19329F956 + (10:36:47, 31 December 2024)
- 05000302/LER-1980-025, Forwards LER 80-025/03L-0 + (10:36:53, 31 December 2024)
- ML19329F948 + (10:37:00, 31 December 2024)
- ML19329F946 + (10:37:03, 31 December 2024)
- ML19329F945 + (10:37:05, 31 December 2024)
- ML19329F942 + (10:37:07, 31 December 2024)
- ML19329F941 + (10:37:08, 31 December 2024)
- ML19329F939 + (10:37:09, 31 December 2024)
- 05000219/LER-1980-025-01, /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow + (10:37:11, 31 December 2024)
- ML19329F936 + (10:37:15, 31 December 2024)
- ML19329F934 + (10:37:16, 31 December 2024)
- 05000327/LER-1980-087-03, /03L-0:on 800602,while in Mode 5 After Inadvertent Si,Diesel Generators Would Not Shut Down Normally.All Lockout Relays Damaged During Shutdown Attempt.Caused by Relay Plunger Malfunction.Relay Coils Replaced + (10:37:18, 31 December 2024)
- 05000219/LER-1980-025, Forwards LER 80-025/01T-0 + (10:37:19, 31 December 2024)
- 05000219/LER-1980-022-03, /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation + (10:37:21, 31 December 2024)
- 05000327/LER-1980-087, Forwards LER 80-087/03L-0 + (10:37:23, 31 December 2024)
- 05000219/LER-1980-022, Forwards LER 80-022/03L-0 + (10:37:25, 31 December 2024)
- ML19329F924 + (10:37:26, 31 December 2024)
- ML19329F925 + (10:37:26, 31 December 2024)
- ML19329F921 + (10:37:27, 31 December 2024)
- ML19329F922 + (10:37:27, 31 December 2024)
- ML19329F919 + (10:37:28, 31 December 2024)
- ML19329F918 + (10:37:29, 31 December 2024)
- ML19329F917 + (10:37:30, 31 December 2024)
- ML19329F916 + (10:37:31, 31 December 2024)
- 05000301/LER-1980-007-01, /01T-0:on 800619,at Full Power,Test IT-04 Was Performed W/Emergency Diesel Generator 3D Out of Svc. Emergency Safeguards Train Equipment Would Have Been Inoperable on Loss of Ac Power.Caused by Personnel Error + (10:37:32, 31 December 2024)
- 05000301/LER-1980-007, Forwards LER 80-007/01T-0 + (10:37:34, 31 December 2024)
- 05000301/LER-1980-006-01, /01T-0:on 800617,during Safeguards Logic Test W/ One Emergency Diesel Generator Out of Svc,Auto Containment Spray Pump Actuation Threatened During Loss of Ac & high- High Containment Pressure.Caused by Personnel Error + (10:37:36, 31 December 2024)
- ML19329F911 + (10:37:37, 31 December 2024)
- ML19329F910 + (10:37:39, 31 December 2024)
- ML19329F909 + (10:37:39, 31 December 2024)
- ML19329F908 + (10:37:40, 31 December 2024)