Monthly Operating Rept for June 1980
ML19329F963
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/02/1980
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18045A351 List:
References
NUDOCS 8007110414
Download: ML19329F963 (4)


Text

_ _ _ _ - _ _

7.7 V

OPERATING DATA REPORT DOCKET NO 50-255 DATE 7/2/80 COMPLETED BY PJBodtke Ub-764-8913 TELEPHONE OPERATING STATUS b"I'5

1. Unit Name:

Palisades 800601 - 800630

2. Reporting Period:

2530

3. Licensed Thermal Power (SIW ):
4. Nameplate Rating (Gross $1We):

811.7

5. Design Electrical Rating (Net MWe):

805

  • 675
6. Ma\\imum Dependable Capacity (Gross MWe):
  • 635
7. Ma\\imum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Lesel To %hich Restricted. lf Any (Net 314e):
10. Renons For 'testrictions. lf Any:

This Month Yr..t o-Da t e Cumulatise 720 4367 74,798

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720 900.6 40,465.4
13. Reactor Resene Shutdown Hours
14. Hours Generator On Line 720 822.6 38,248.9
15. Unit Rewrve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,600,296 1,761,384 73.272.864
17. Gross Electrical Energy Generated (MWH,

'498,740,_,

549.470 22,581.700 IS. Net Electrical Energy Generated (MWH) 470.439 516,627 21.187.402 19.' Unit Senice Factor 100.0 18.8 51.1

20. Unit Asailability Factor 100.0 18.8 51.1 102.9 18.6 44.6
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 81.2 14.7 35.2 0

0 35.8

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type,Date,and Duration of Eachi:
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior o Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITI A L ELECTRICITY COMMERCIA L OPERATION

  • Based on Condenser-Backpressure (4/77) 8007110 Y k

AVERAGE DAILY L* NIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 7/2/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH June 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 644 626 37 2

670 623 33 654 614 3

39 4

637 322 20 5

630 666 21 6

627 688 22 653 7

23 675 8

705 680 74 9

712 674 25 10 702 673 26 11 663 27 677 12 669 680 23 13 653 679 29 14 645 698 30 IS 702 3j 16 662 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

s s

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-255 UNIT NAME Palisades DATE 7/2/80 REPORT MONTil June 1980 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 "L

.! E 3

.E Licensee gn, Cause & Corrective No.

Date g

gg g

,g g 5 Event u?

83 Action to H

$5 5

3 di e Report sr N0

$U Prevent Recurrena u

e c5 15 800620 1

30 A

Reduced power to repair condenser leak.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER) File INUREG-D Regulatory Restriction 4-01her (E xplain) 01611 E-Operator Training & Ucense Examination F-Administrative 5

G-Operatismal Error (Esplain)

E-labit I - Same Source (9/77)

II-Other (*d sphin)

1

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1980 General The plant was on line the entire month with only a short power reduction on the 20th to repair a condenser leak.