Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261D647 + (15:44:48, 3 January 2025)
- ML19261D646 + (15:44:49, 3 January 2025)
- ML19261D645 + (15:44:51, 3 January 2025)
- ML19261D644 + (15:44:52, 3 January 2025)
- ML19261D643 + (15:44:53, 3 January 2025)
- IR 05000346/1979004 + (15:45:01, 3 January 2025)
- ML19261D641 + (15:45:04, 3 January 2025)
- ML19261D639 + (15:45:06, 3 January 2025)
- ML19261D637 + (15:45:08, 3 January 2025)
- ML19261D636 + (15:45:08, 3 January 2025)
- ML19261D635 + (15:45:09, 3 January 2025)
- ML19261D634 + (15:45:11, 3 January 2025)
- ML19261D633 + (15:45:12, 3 January 2025)
- ML19261D632 + (15:45:17, 3 January 2025)
- 05000219/LER-1979-017-03, /03L-0 on 790517:during Routine Surveillance of Core Spray Sys Ii,Parallel Isolation Valve V-20-21 Failed to Operate.Caused by Circuit Breaker Contacts Making Poor Contact in B Phase,Creating Overcurrent.Part Replaced + (15:45:21, 3 January 2025)
- ML19261D630 + (15:45:23, 3 January 2025)
- 05000219/LER-1979-017, Forwards LER 79-017/03L-0 + (15:45:26, 3 January 2025)
- 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability + (15:45:30, 3 January 2025)
- ML19261D626 + (15:45:31, 3 January 2025)
- ML19261D624 + (15:45:32, 3 January 2025)
- 05000338/LER-1979-077-03, /03L-0 on 790531:during Power Reduction,Axial Flux Difference Deviated Greater than 5% from Target.Caused by Rapid Reduction Necessitated by High Bearing Temp of Feedwater Pump C Boration.Corrected Problem + (15:45:34, 3 January 2025)
- 05000338/LER-1979-077, Forwards LER 79-077/03L-0 + (15:45:40, 3 January 2025)
- ML19261D620 + (15:45:41, 3 January 2025)
- ML19261D618 + (15:45:42, 3 January 2025)
- ML19261D617 + (15:45:44, 3 January 2025)
- ML19261D616 + (15:45:45, 3 January 2025)
- ML19261D615 + (15:45:49, 3 January 2025)
- ML19261D614 + (15:45:56, 3 January 2025)
- ML19261D613 + (15:46:03, 3 January 2025)
- ML19261D611 + (15:46:06, 3 January 2025)
- 05000237/LER-1979-034-01, /01T-0 on 790530:diesel Generator Failed to Start During Operability Test.Caused by Failure to Engage of Lower Air Start Bendix Gear.Gear Aligment Will Be Checked After Diesel Generator Tests + (15:46:17, 3 January 2025)
- 05000237/LER-1979-034, Forwards LER 79-034/01T-0 + (15:46:52, 3 January 2025)
- ML19261D607 + (15:46:57, 3 January 2025)
- ML19261D605 + (15:46:58, 3 January 2025)
- 05000325/LER-1979-035-03, /03L-0 on 790517:coolant Sample Line Isolation Valves Would Not Close.Caused by Solenoids Stuck in Open Position & Control Switches of Sample Station Shorted. Solenoids Were Cleaned & Returned to Svc + (15:47:40, 3 January 2025)
- 05000323/LER-1979-035, Forwards LER 79-035/03L-0 + (15:48:21, 3 January 2025)
- ML19261D601 + (15:48:25, 3 January 2025)
- ML19261D599 + (15:48:28, 3 January 2025)
- ML19261D597 + (15:48:31, 3 January 2025)
- ML19261D596 + (15:48:34, 3 January 2025)
- ML19261D594 + (15:48:36, 3 January 2025)
- ML19261D593 + (15:48:38, 3 January 2025)
- ML19261D591 + (15:48:39, 3 January 2025)
- ML19261D590 + (15:48:43, 3 January 2025)
- ML19261D583 + (15:48:46, 3 January 2025)
- ML19261D582 + (15:48:49, 3 January 2025)
- ML19261D581 + (15:48:50, 3 January 2025)
- ML19261D580 + (15:48:52, 3 January 2025)
- ML19261D579 + (15:48:57, 3 January 2025)
- ML19261D577 + (15:48:59, 3 January 2025)
- ML19261D576 + (15:49:01, 3 January 2025)