Forwards IE Insp Rept 50-346/79-04 on 790205-09 & Notice of Violation
ML19261D639
Person / Time
Site: Crane, Davis Besse  
Issue date: 03/28/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19261D640 List:
References
TASK-TF, TASK-TMR NUDOCS 7906200482
Download: ML19261D639 (2)


See also: IR 05000346/1979004

Text

T

9

g>R Rf CW,

UNITED STATES

. , .

  • 2

NUCLEAR REGULATORY COMMISSION

f ,'l

_V ) j

REGION m

'

g

799 ROOSEVELT ROAD

%,

y .,.

/

G LE N E LL Y N, IL LINOIS 60137

.....

U

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Messrs. J. F. Streeter,

E. Chow, and J. S. Creswell of this office on February 5-9, 1979,

of activities at Davis-Besse Nuclear Power Plant, Unit 1, authorized

by NRC Operating License No. NPF-3 and to the discussion of our find-

ings with Mr. Murray at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of proceduree and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this

office within twenty days of your receipt of this notice a written

statement or explanation in reply, including for each item of non-

compliance: (1) corrective action taken and the results achieved;

(2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the N'IC's Public Document Room, except as follows.

If the enclo-

sures contain information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within twenty

days of your receipt of this letter, to withhold such information

2286

24

790920M>

.

.

R 2a 979

Toledo Edison Company

-2-

from public disclosure. The application must include a full statement

of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/o

h

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Report

No. 50-346/79-04

cc w/encls:

Mr. T. Murray, Station

Superintendent

2286

25

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

U. Young Park, Power

Siting Commission