ML19261D637
| ML19261D637 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/17/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19261D638 | List: |
| References | |
| NUDOCS 7906200474 | |
| Download: ML19261D637 (2) | |
See also: IR 05000445/1979008
Text
e? "800
UNITED STATES
9(o
.
NUCLE AR REGULATORY COMMISSION
r_ ,j
2
')
e
REGION IV
3
4
.- c
611 RYAN PLAZA DRIVE, SUITE 1000
'
i'ti
ARLINGTON, TEXAS 76011
o,sy /
April 17,1979
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 79-08
50-446/Rpt. 79-08
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. J. I. Tapia of our staff
during the period March 26-29, 1979, of activities authorized by NRC Con-
struction Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units
No.1 and 2, and to the discussion of our findings with Mr. R. G. Tolson
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inapection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, inter-
views with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were iden-
tified.
One new unresolved item is identified in paragraph 4 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contaias any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 day'; of the date of this letter, requesting that
such information be withheld from public disclosure. The application
2286
A 7
7 9 0 6 20 0 4Vf
.
Texas Utilities Generating
Company
-2-
April 17,1979
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
%
--
,
W. C. Seidle,) Chief
Reactor Const+uction and
Engineering Support Branch
Enclosure:
IE Inspection Report 50-445/79-08
50-446/79-08
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
2286
318