Forwards IE Insp Repts 50-445/79-08 & 50-446/79-08 on 790326-29.No Noncompliance Noted
ML19261D637
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/17/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19261D638 List:
References
NUDOCS 7906200474
Download: ML19261D637 (2)


See also: IR 05000445/1979008

Text

e? "800

UNITED STATES

9(o

.

NUCLE AR REGULATORY COMMISSION

r_ ,j

2

')

e

REGION IV

3

4

.- c

611 RYAN PLAZA DRIVE, SUITE 1000

'

i'ti

ARLINGTON, TEXAS 76011

o,sy /

April 17,1979

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-08

50-446/Rpt. 79-08

Texas Utilities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. J. I. Tapia of our staff

during the period March 26-29, 1979, of activities authorized by NRC Con-

struction Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units

No.1 and 2, and to the discussion of our findings with Mr. R. G. Tolson

and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inapection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were iden-

tified.

One new unresolved item is identified in paragraph 4 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If the report contaias any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office, within 20 day'; of the date of this letter, requesting that

such information be withheld from public disclosure. The application

2286

A 7

7 9 0 6 20 0 4Vf

.

Texas Utilities Generating

Company

-2-

April 17,1979

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

%

--

,

W. C. Seidle,) Chief

Reactor Const+uction and

Engineering Support Branch

Enclosure:

IE Inspection Report 50-445/79-08

50-446/79-08

cc: w/ enclosure

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

2286