Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261E716 + (15:19:15, 3 January 2025)
- ML19261E715 + (15:19:16, 3 January 2025)
- ML19261E714 + (15:19:21, 3 January 2025)
- ML19261E713 + (15:19:23, 3 January 2025)
- ML19261E711 + (15:19:24, 3 January 2025)
- ML19261E708 + (15:19:25, 3 January 2025)
- ML19261E703 + (15:19:26, 3 January 2025)
- ML19261E680 + (15:19:27, 3 January 2025)
- ML19261E679 + (15:19:30, 3 January 2025)
- ML19261E675 + (15:19:31, 3 January 2025)
- ML19261E670 + (15:19:32, 3 January 2025)
- ML19261E622 + (15:19:33, 3 January 2025)
- ML19261E607 + (15:19:35, 3 January 2025)
- ML19261E600 + (15:19:36, 3 January 2025)
- ML19261E574 + (15:19:38, 3 January 2025)
- ML19261E573 + (15:19:39, 3 January 2025)
- ML19261E550 + (15:19:41, 3 January 2025)
- ML19261E549 + (15:19:43, 3 January 2025)
- ML19261E547 + (15:19:50, 3 January 2025)
- IR 05000327/1979030 + (15:19:53, 3 January 2025)
- ML19261E544 + (15:19:56, 3 January 2025)
- 05000338/LER-1979-097-03, /03L-0 on 790803:greater than 12 Step Disagreement Was Noted Between Individual & Group Indication for Rod D-10.Caused by Instrument Drift.Immediate Calibr & Functional Checks Were Performed + (15:19:59, 3 January 2025)
- ML19261E542 + (15:20:02, 3 January 2025)
- 05000338/LER-1979-097, Forwards LER 79-097/03L-0 + (15:20:05, 3 January 2025)
- ML19261E539 + (15:20:07, 3 January 2025)
- ML19261E538 + (15:20:15, 3 January 2025)
- ML19261E537 + (15:20:17, 3 January 2025)
- 05000317/LER-1979-030-03, /03L-0 on 790728:water Leak Discovered on Discharge Isolation Valve of Reactor Coolant Charging Pump. Caused by Cracked Repair Weld on Discharge Isolation Valve. Weld Repaired Using Gas Tungsten Arc Process + (15:20:26, 3 January 2025)
- ML19261E534 + (15:20:28, 3 January 2025)
- 05000317/LER-1979-030, Forwards LER 79-030/03L-0 + (15:20:31, 3 January 2025)
- ML19261E531 + (15:20:33, 3 January 2025)
- ML19261E527 + (15:20:35, 3 January 2025)
- ML19261E525 + (15:20:37, 3 January 2025)
- ML19261E523 + (15:20:42, 3 January 2025)
- ML19261E522 + (15:20:45, 3 January 2025)
- ML19261E519 + (15:20:46, 3 January 2025)
- ML19261E518 + (15:20:49, 3 January 2025)
- ML19261E516 + (15:20:50, 3 January 2025)
- ML19261E515 + (15:20:53, 3 January 2025)
- ML19261E512 + (15:20:54, 3 January 2025)
- 05000293/LER-1979-030-03, /03L-0 on 790725:motor Control Ctr Breaker of Globe Valve MOV-1001-36B Tripped on Overload After Valve Given Signal to Open.Caused by Shear in Valve Stem Guide Key.Stem Clamps Drilled in Place & Tapped for Set Screws + (15:20:57, 3 January 2025)
- 05000293/LER-1979-030, Forwards LER 79-030/03L-0 + (15:21:01, 3 January 2025)
- ML19261E504 + (15:21:04, 3 January 2025)
- ML19261E502 + (15:21:09, 3 January 2025)
- ML19261E501 + (15:21:11, 3 January 2025)
- ML19261E499 + (15:21:12, 3 January 2025)
- 05000334/LER-1979-028, Discusses LER 79-028/01P-0 on 790820:reactor Was Manually Tripped Following Trip of Main Feed Pump 1B Due to Low Net Positive Suction Head.Manual Trip Caused 1A & 1B 4kV Buses to Trip on All Reactor Coolant Pumps on Underfreque + (15:21:43, 3 January 2025)
- ML19261E475 + (15:21:47, 3 January 2025)
- ML19261E472 + (15:21:49, 3 January 2025)
- ML19261E470 + (15:21:52, 3 January 2025)
- ML19261E458 + (15:21:53, 3 January 2025)