Text
NOIFINI!Affr IFFII. FRIES 3
7%2 M2 % 27~
f8nTronEcoNNECTICUT 06101
- ":::,7 :.2'a7"*~
<2m) ess*
L t
a :=;OASI"l=l August 20, 1979 Docket No. 50-336 Mr. V. Stello, Jr.
- Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Wr.shington, D. C.
20555
Reference:
(1)
W. G. Counsil letter to V. Stello, Jr., dated August 9, 1979.
Gentlemen:
Millstone Nuclear Power Station, Unit No. 2 Load Center Transformers In Reference (1), the NRC Staff was informed of Northeast Nuclear Energy Company's (NNECO) plans to replace one safety-related load center transformer during the current outage and the second safety-related load center transformer during a scheduled outage planned to commence no later than October 6, 1979.
With the extended duration of the present outage, NNECO has effected the re-placement of the second safety-related load center transformer with a fully qualified transformer. This completes the corrective action necessary for disposition of the concerns of Reference (1).
y Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
[e M1A W. G. Counsil Vice President 2022 060 7908290 9 7
.