Notifies of Replacement of safety-related Load Center Transformer W/Fully Qualified Transformer
ML19261E573
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/20/1979
From: Counsil W
NORTHEAST UTILITIES
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7908290597
Download: ML19261E573 (1)


Text

NOIFINI!Affr IFFII. FRIES 7%2 M2 % 27~ **

3 f8nTronEcoNNECTICUT 06101

  • ":::,7 :.2'a7"*~ <2m) ess*

L t a :=;OASI"l=l August 20, 1979 Docket No. 50-336 Mr. V. Stello, Jr.

Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Wr.shington, D. C. 20555

Reference:

(1) W. G. Counsil letter to V. Stello, Jr., dated August 9, 1979.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Load Center Transformers In Reference (1), the NRC Staff was informed of Northeast Nuclear Energy Company's (NNECO) plans to replace one safety-related load center transformer during the current outage and the second safety-related load center transformer during a scheduled outage planned to commence no later than October 6, 1979.

With the extended duration of the present outage, NNECO has effected the re-placement of the second safety-related load center transformer with a fully qualified transformer. This completes the corrective action necessary for disposition of the concerns of Reference (1).

y Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

[e M1A W. G. Counsil Vice President 2022 060 7908290 9 7 .