Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19276H039 + (06:25:55, 3 January 2025)
- ML19276H037 + (06:25:56, 3 January 2025)
- TAC:43142 + (06:25:57, 3 January 2025)
- ML19276H036 + (06:25:58, 3 January 2025)
- ML19276H035 + (06:25:59, 3 January 2025)
- ML19276H034 + (06:26:00, 3 January 2025)
- ML19276H033 + (06:26:01, 3 January 2025)
- ML19276H032 + (06:26:03, 3 January 2025)
- 05000302/LER-1979-071-03, /03L-0 on 790801:in Mode 1,reactor Bldg Isolation Valves CAV-4 & CAV-6 Would Not Close from Control Room After Securing from Continuous Blowdown.Caused by Valves Being Stuck & Underlubricated.Valves Freed & Lubricated + (06:26:06, 3 January 2025)
- ML19276H030 + (06:26:08, 3 January 2025)
- ML19276H029 + (06:26:09, 3 January 2025)
- 05000302/LER-1979-071, Forwards LER 79-071/03L-0 + (06:26:12, 3 January 2025)
- ML19276H026 + (06:26:13, 3 January 2025)
- ML19276H024 + (06:26:14, 3 January 2025)
- ML19276H023 + (06:26:15, 3 January 2025)
- 05000298/LER-1979-018-03, /03L-0 on 790706:during Routine Testing,Reactor Vessel Level Indicating Switch NBI-LIS-58A Was Found W/Trip Point Less than Allowed.Caused by Sediments of Dust & Moisture in Auxiliary Switch + (06:26:22, 3 January 2025)
- 05000298/LER-1979-018, Forwards LER 79-018/03L-0 + (06:26:25, 3 January 2025)
- 05000267/LER-1979-020-03, /03L-0 on 790717:during Normal Plant Operation, Engine Failed to Start.Caused by Failure of Emergency Diesel Temp Switch C.Switch Replaced + (06:26:29, 3 January 2025)
- ML19276H016 + (06:26:31, 3 January 2025)
- ML19276H015 + (06:26:31, 3 January 2025)
- ML19276H013 + (06:26:32, 3 January 2025)
- ML19276H012 + (06:26:33, 3 January 2025)
- 05000366/LER-1979-074-03, /03L-0 on 790808:reactor Recirculation Sys Motor Generator Set 2B Tripped While Unit at Steady State Power. Cause Unknown + (06:26:37, 3 January 2025)
- 05000366/LER-1979-074, Forwards LER 79-074/03L-0 + (06:28:16, 3 January 2025)
- 05000366/LER-1979-087-03, /03L-0 on 790810:while Increasing Reactor Power, Average Linear Planar Heat Generation Rate Exceeded Limit. Caused by Low Xenon Condition Reducing Equilibrium Condition in Control Rod Pattern.Rate Will Be Better Monitored + (06:28:22, 3 January 2025)
- 05000366/LER-1979-087, Forwards LER 79-087/03L-0 + (06:28:26, 3 January 2025)
- ML19276H002 + (06:28:28, 3 January 2025)
- ML19276H001 + (06:28:30, 3 January 2025)
- 05000302/LER-1979-070-03, /03L-0 on 790731:reactor Bldg Atmospheric Monitor RMA-6 Was Found Isolated.Caused by Damaged Wires to Control Switches for Containment Monitoring Isolation Valves WSV-5 & WSV-6.Wires Were Repaired + (06:28:32, 3 January 2025)
- ML19276G999 + (06:28:35, 3 January 2025)
- ML19276G998 + (06:28:37, 3 January 2025)
- ML19276G997 + (06:28:38, 3 January 2025)
- 05000302/LER-1979-070, Forwards LER 79-070/03L-0 + (06:28:40, 3 January 2025)
- ML19276G994 + (06:28:43, 3 January 2025)
- ML19276G993 + (06:28:44, 3 January 2025)
- ML19276G992 + (06:28:46, 3 January 2025)
- ML19276G990 + (06:28:48, 3 January 2025)
- ML19276G991 + (06:28:48, 3 January 2025)
- ML19276G989 + (06:28:50, 3 January 2025)
- ML19276G986 + (06:28:52, 3 January 2025)
- ML19276G988 + (06:28:52, 3 January 2025)
- ML19276G985 + (06:28:54, 3 January 2025)
- ML19276G984 + (06:28:56, 3 January 2025)
- ML19276G983 + (06:28:57, 3 January 2025)
- ML19276G982 + (06:28:59, 3 January 2025)
- ML19276G981 + (06:29:01, 3 January 2025)
- ML19276G979 + (06:29:02, 3 January 2025)
- ML19276G978 + (06:29:04, 3 January 2025)
- ML19276G977 + (06:29:05, 3 January 2025)
- ML19276G976 + (06:29:07, 3 January 2025)
- ML19276G975 + (06:29:08, 3 January 2025)