ML19276H029

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-11.No Westinghouse DB-50 or DB-75 Circuit Breakers Are Installed or Planned for Installation at Facility
ML19276H029
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/12/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LPL-11556, NUDOCS 7908310475
Download: ML19276H029 (1)


Text

- 75c LOUISIANA f 242 OuAnONOe sinEer POWE R & LIG H T/ P O BOX 6008 . NEW OnLEANS. LOUIStANA 70174 . (504) 366-2345 ISONSrSSEU July 12, 1979 O L. ASWRL V.ca %sedeat Power Productum LPL 11556 Q-3-A30.03.13 3-A1.01.04 Mr. Karl V. Seyfrit, Director Region IV U. S. Nuclear Regulatory Conraission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 I. E.Bulletin 79-11

Dear Mr. Seyfrit:

In response to the subject bulletin, we have determined that there are no Westinghouse type DB-50 and DB-75 circuit breakers installed or planned for installation at Waterford 3.

If you have any questions, please advise. -

Yours very truly, D. L. Aswell DLA:JEH: sed cc: U. S. Nuclear Regulatory Commistion Office of Inspection and Enforcement Division of Reactor Operation Inspection Washington, D. C. 20555 0?>.5 510 r

4083.7o y7,