Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action + (15:45:32, 3 December 2024)
- ML20216D356 + (15:45:33, 3 December 2024)
- ML20216D355 + (15:45:34, 3 December 2024)
- ML20216D350 + (15:45:35, 3 December 2024)
- PNO-I-99-035, on 990724,Calvert Cliffs,Unit 1 Automatically Shutdown from 100% Power.All Control Rods Fully Inserted & All Safety Equipment Operated as Designed During & Following Shutdown.Licensee Plans to Replace a Phase Bushing + (15:45:35, 3 December 2024)
- ML20216D343 + (15:45:36, 3 December 2024)
- ML20216D339 + (15:45:37, 3 December 2024)
- 05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service + (15:45:39, 3 December 2024)
- NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data + (15:45:39, 3 December 2024)
- ML20216D328 + (15:45:45, 3 December 2024)
- ML20216D325 + (15:45:46, 3 December 2024)
- ML20216D322 + (15:45:47, 3 December 2024)
- 05000382/LER-1999-007-01, :on 990625,operation Outside Tornado Missile Protection Licensing Basis for turbine-driven EFW Pump & Steam Supply Piping,Was Discovered.Caused Indeterminent. Entergy Will Submit 10CFR50.90 to NRC Staff + (15:45:50, 3 December 2024)
- ML20216D319 + (15:45:50, 3 December 2024)
- ML20216D318 + (15:45:51, 3 December 2024)
- 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached + (15:45:58, 3 December 2024)
- ML20216D313 + (15:45:58, 3 December 2024)
- PY-CEI-NRR-2272, Forwards Copy of Ohio EPA Approval for Use of Nalco Dynacool,As Scale Inhibitor + (15:45:59, 3 December 2024)
- ML20216D308 + (15:46:00, 3 December 2024)
- ML20216D307 + (15:46:00, 3 December 2024)
- ML20216D304 + (15:46:01, 3 December 2024)
- ML20216D306 + (15:46:01, 3 December 2024)
- ML20216D302 + (15:46:02, 3 December 2024)
- ML20216D300 + (15:46:03, 3 December 2024)
- ML20216D298 + (15:46:03, 3 December 2024)
- ML20216D296 + (15:46:04, 3 December 2024)
- ML20216D293 + (15:46:06, 3 December 2024)
- ML20216D289 + (15:46:07, 3 December 2024)
- ML20216D291 + (15:46:07, 3 December 2024)
- ML20216D286 + (15:46:08, 3 December 2024)
- ML20216D284 + (15:46:09, 3 December 2024)
- ML20216D282 + (15:46:09, 3 December 2024)
- NSD-NRC-97-5301, Forwards Suppl Info in Response to Open Item 3.7.2.12-1 Discussed During 970811-15 Meetings.Table 1 Which Compares Max Vertical Acceleration at Each Node of Steel Containment Vessel for Each of Listed Analysis,Encl + (15:46:10, 3 December 2024)
- ML20216D279 + (15:46:11, 3 December 2024)
- LR-N970558, Requests Approval of Attached Relief Request RR-A4 to First Ten Yr ISI Program.Details & Justification for Relief Explained Further in Attached Relief Request + (15:46:12, 3 December 2024)
- ML20216D275 + (15:46:12, 3 December 2024)
- NOC-AE-000148, Submits Info Re Operability of Main Steam Safety Valves,Per NRC Request During 980403 Telcon.Response & Commitments Encl + (15:46:13, 3 December 2024)
- ML20216D269 + (15:46:14, 3 December 2024)
- ML20216D266 + (15:46:15, 3 December 2024)
- ML20216D267 + (15:46:15, 3 December 2024)
- ML20216D265 + (15:46:16, 3 December 2024)
- ML20216D264 + (15:46:17, 3 December 2024)
- NSD-NRC-97-5300, Forwards SSAR Markup Which Shows Draft Changes Section 2.3 & 2.4 to Remove Term Site Interface.W Status for Item Will Be Confirm W Pending Incorporation Into Formal SSAR Rev + (15:46:18, 3 December 2024)
- ML20216D261 + (15:46:18, 3 December 2024)
- ML20216D257 + (15:46:23, 3 December 2024)
- 05000423/LER-1998-007, Forwards LER 98-007-00,documenting Event That Occurred at Millstone,Unit 3 on 980129.Commitments Made by Util,Encl + (01:04:06, 4 December 2024)
- ML20216D253 + (01:40:56, 4 December 2024)
- ML20216D251 + (01:40:58, 4 December 2024)
- ML20216D250 + (01:40:59, 4 December 2024)
- NSD-NRC-97-5297, Forwards Advance Markup of AP600 TS to Modify SR 3.6.9.1 & SR 3.6.9.2,consistent W/Nrc Example Provided in Question 68 & Consistent w/NUREG-1432 + (01:41:00, 4 December 2024)
- 05000368/LER-1998-001-02, :on 980309,surveillance Testing of Containment Bldg Personnel & Escape Air Lock Door Interlocks Did Not Verify Operability of Each Interlock Function.Caused by Inappropriate Interpretation.Revised Maint Task Documents + (01:41:03, 4 December 2024)