ML20216D339

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents Re Defective Westinghouse Motors & Reactor Coolant Pump Pressure Tap Nozzles Developed Through Wall Cracks.Forwards App C Documents.Documents in Apps B & C Available in PDR
ML20216D339
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/23/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Holmes G
TECHNICAL ASSOCIATES
Shared Package
ML20216D344 List:
References
FOIA-87-261 NUDOCS 8706300507
Download: ML20216D339 (7)


Text

U.S. NUCLEAR REGULATORY COMMISSION NRC FOIA RtOU151 NUM8 IRIS 6 .

/""% 50/A~ ERespoNsg F ek& / \

/ h _ J net -

IY RESPONSE TO FREEDOM OF I I **"

^

Kl "'

1 INFORMATION ACT (FOIA) REQUEST JlIN 2 31987

, 00CKEi NUM8ERi$1 g/r sagersom IEQUE$71R A k % o/ n v A. ALa s ~

/ ART f.- RECORDS RELEASLO OR NOT LOCATED (See checked boxes l i ,

No agency records sub#ect to the request have been located.

No additional agency records subsect to the request have been located.

Agency records subsect to the request that are identified in Appendia A are already available for public inspection and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.

Agency records subsect to the request that are ioentifed in Appendix d are being made available for public inspection and copying in the NRC Public Document l Room,1717 H Street, N.W.. Washington, DC. in a folder under this FOIA number and requester name. '

r The nonproprietary version of the proposal (s) that you agreed 10 accept m a telephone convertation with a member of my staff is now being made avadable for public inspectic9 and coying at the NRC Public Document Room,17t7 H Street, N W., Washington, DC. in a folder under this FOIA nutnber and requester name.

Enclosed se inforrnation on how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W.. Washington, DC.

Agency records sub# ect to the request are enclosed. Any applicable charge for copies of the records orovided and payment procedures are noted in the comments section.

Records subject tc the request have been referred to another Federal agencybest for revsew and direct response to you, in view of NRC's responae to the r3 quest, no further action is being taken on appeal letter dated  ;

PART ll.A-tNFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain enformation in the requested records is bemg withheld from public disclosure pursuant to the FOIA exemptons described in and for the reasons stated in Part II, sec-tions I, C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and Copying in the N' C Public Document Room.1717 H Street, N.W., Washington, DC. en a folder under this FOIA number and requester name.

Comments Dk 7 B70623 HOLMEssy-261 PDR

$8 NATU JiRECTOR DIVIS ' RULES A ,

M -: ;p0 RECORDS

-w Aef A m IL -

. k  :

l NIC FORM 464 (Part H G e61 4

Re: F0IA- 87-261 3

APPENDIX B RECORDS MAINTAINED AMONG PDR FILES NUMBER DATE

' DESCRIPTION i

1. 12/23/81. Letter to B.H. Faulkenberry, Region V from E. E. Van Brunt; Arizona Public Service Company (APS), subject: Interim Report - DER 81-44 Acc.LNo.-8201130227
12. 3/5/82 Letter to B. H. Faulenberry, Region V from E. E. Van Brunt, APS, subject: Time Extension for Report - DER 81-44 1 Acc. No. 8203220329

, 3. , 4/5/82 Letter to B. H. Faulkenberry, Region V. from E. E. Van Brunt, subject: Interim Report - DER 82-5 Acc. No. 8205040222 4.. 5/3/82 Letter to T. W. Bishop, Region V from E. -E. Van Brunt ~,  !

APS, subject: Time Extension for Report - DER 81-44 Acc. No. 8205180438 5.. 6/4/82 Letter to'T. W. Bishop, Region V from E. E. Van Brunt, APS, subject: Time Extension for Report - DER 81-44 Acc. No. 8206180305

6. 6/16/82 Letter to T. W. Bishop, Region V from E. E. Van Brunt, APS, subject:

Final Report - DER 82-5 Acc. No. 827060119 i 7.- 7/ 6/82 Letter to T. W. Bishop, Region V from E. E. Van Brunt, APS, subject: Final Report - DER 81-44 Acc. No. 8207230197 8 .- 8/5/82 Letter to T. W. Bishop, Region V from E. E. Van' Brunt, APS, subject: Interim Report - DER 82-35 Acc. No. 8208160181 -

9. 9/29/82 Letter to D. M. Sternberg from E. E. Van Brunt, APS, subject: Final Report - DER 82-35 Acc. No. 8210130495
10. 3/28/83 Letter to D. M. Sternberg from E. E. Van Brunt, APS, subject: Final Report - DER 82-42 Acc. No. 8304070410
11. 8/4/83 Memorandum for Darrell G. Eisenhut from Thomas Bishop, subject: Request for Transfer of Lead Responsibility for i Evaluation of Reactor Coolant System Damage in Combustion i Engineering System 80 Components at Palo Verde Nuclear i Generating Station and Other Affected Plants Acc. No. 8308100373  !
12. 8/16/83 Task Interface Agreement Acc. No. 8402080047
13. 9/14/83 Letter to Thomas M. Novak from' Lynne Bernabei  ;

Acc. No. 8309220176

'14. 9/28/83 Memorandum for Thomas Novak from E. A. Licitra, ' subject:

Updated Status on Palo Verde RCS Pumps and Related Matters Acc. No. 8310050010 i

Re: F0I A- 87-261 APPENDIX B-

~

RECORDS MAINTAINED AMONG PDR FILES o i

NUMBER DATE DESCRIPTION 4

15. l0'/11/83 Memorandum for Thomas Novak from E. A. Licitra, subject:

Updated Status on Palo Verde RCS Pumps and Related Matters Acc. No. 8310200052

16. 10/18/83 Letter to Lynne Bernabei from Thomas Novak with enclosure, in response to questions regarding Palo Verde Acc. No. 8311080433
17. 10/13/83 Letter to T. W. Bishop from E. E. Van Brunt, APS, subject: Interim Report - DER 83-61 Acc. No. 8310310316

-18. 1/16/84 Letter to T. W. Bishop from E. E. Van Brunt. APS, subject: Time Extension for Report - DER 83-61

' Acc. No. 8402030176

19. 1/25/84 Letter to T. W. Bishop from E. E. Van Brunt, APS, subject: Final Report - DER 82-61 Acc. No. 8402130406
20. 2/6/84 Memorandum for E. G. Eisenhut from T. W. Bishop, subject:

Request for Transfer of Lead Responsibility for Evaluation of LPSI Pump Problems and Modifications at Palo Verde Nuclear Generating Station Acc. No. 8405250297 21 . 2/15/84 Letter to T. W. Bishop from E. E. Van Brunt, APS, subject: Time Extension for Report - DER 83-61 Acc. No. 8402280481 ,

22.- 2/27/84 Letter to E. E. Van Brunt fro:n George W. Knighton, subject:

Request for Additional Information - Palo Verde Reactor Coolant Pumps Acc. No. 8403060429

23. 4/3/84 Letter to E. E. Van Brunt, APS, from George W. Knighton, subject: Request for Additional Infonnation - Palo Verfe Reactor System Compenents Acc. No. 8404170013

'24. 4/13/84 Letter to T. W. Bishop from E. E. Van Brunt, APS, I subject: Interim Report, Rev.1 - DER 83-61 Acc. No. 8404240159 9

25. 6/27/84 Letter to T. W. Bishop from E. E. Van Brunt, APS, subject: Time Extension for Report - DER 83-61 Acc. No. 8407100424
26. 8/9/84 Letter to T. W. Bishop from E. E. Van Brunt, APS, subject: Final Report - DER 83-61 Acc. No. 8408200322 j i

l l

)

  • -~

'Re: 'FOIA- 87-261 APPENDIX-' 'B t'

RECORDS MAINTAINED AMONG PDR FILES

- NUMBER I DATE DESCRIPTION 2 7. . .9/14/84. . Letter to T. W. Bishop from E. E; Van Brunt, AP3, subject: Final: Report - DER 83-49 : Acc. No. 8409280098 )

j

'1

.28.~ .7/19/85: Letter to E. E. Van Brunt from George W. Knighton,-

-. subject: Post-LOCA Status' of Reactor Coolant Pumps.  !

- Seal Cooling - Palo Verde ' Acc. No.' 8507310389

.29. 5/23/84-~ Letter to George Knighton from E. E.. Van Brunt subject: Palo' Verde Nuclear Generating Station w/o enclosure .Acc. No. 84053004991 j i

.. 30 : 7/12/84 - Paper. Clarifying Previous RCS Demonstration Test  !

- Description Acc. No. 8407180193.

l

. 31. - 9/11/84 ' Paper Clarifying response to Question 1.1 on Reactor Coolant Pump Report ' Acc. No. 8409170161 32.. -l'0/84 Nu' reg-0857, Supp. 6 - Safety Evaluation Report Related to -

the Operation of Palo Verde Nuclear Generating Station -

Acc. No. 8411210379,(pgs. 14-1) 33, 11/16/84 Meeting with Utility & Bechtel Corp. regarding Status of  !

Equipment Qualification and Resolution of Testing. Problem Acc. No. 8412100286

34. 11/19/84- Meeting with utility & B'echtel Corp. regarding Status of .{

4 Equipment Qualification and Resolution of Testing Problem Acc. No. 8412100286 1

~ 35. 12/84 Nureg-0857, Supp. 7 - Safety Evaluation Report Related to the Operation of Palo-Verde Nuclear Generating Station Acc. No. 8501080275

36. F01A-83-609 - Filed at Public Document Room (PDR)
37. F01 A-84-212 - Filed at PDR O

I i

Re: F0IA.87-261

~

APPENDIX B RECORDS MAINTAINED AMONG PDR FILES NUM8ER DATE DESCRIPTION Various Dates INSPECTION REPORTS 528 Number Accession Number

38. 82-07 8204140241
39. 82-08 8206020507
40. 82-12 8207270073 41, 82-14 8208240291
42. 82-28 8211020270
43. 82-37 8303040361
44. 83-18 8306070256
45. 83-23 8307120549  !
46. 84-06 8404050319
47. 83-46 8401200211

- 48. . 84-50 8412140348 49, 84-54 8412310281 i 50, 85-25 8508210383

51. 83-13 8305170382 i
52. 83-25 8308090723 53, 83-31 8309140043 54 83-32 8309140009 55, 83-36 8309130324
56. 83-38 8310040537 57, 83-40 8312120151
58. 83-44 8312290422
59. 83-46 8401200211
60. 83-45 8401300302 3

i 61 84-02 8403080263

62. 84-08 8404050147 '
63. 84-06 8404050319 l
64. 84-12 8405100041
65. 84-18  !

8407180251 i

66. 84- 23 8408300195 l

'67 84-24 8409070163 68 84-28 8410150209

69. 84-30 8410050167
70. 84-33 8411160415 71 84-44
  • 8412070066
72. ,

84- 51 8502200195

t

.x 'Re: lFOIA.87-261 APPENDIX. 8 RECORDS MAINTAINED AMONG POR FILES NUMBER DATE-DESCRIPTION I

Various Da'tes ' 50.55(e) REPORTS - PART 21 REPORTS h

. Number ~

Accession Number

- 73. 81-42. 8112290235-

' 74.- 81'-52

'75 '

8205110628 1 82-42 8211220283

76. 82 8212130267
77. 83-09 8304040386
78. .83-21 :8305230517
79. 39
80. 8308220198'-

83-40 8308050376 81 . 83-50

' 82. '8308300647-83-61 8310310316 j

83. 84-12
84. 8404200306 C 84-18 8404270098
85. 84-39 8407230249
86. 83 8408200322 (without-enclosure) i I

4 q

l

.I 1

1 E.

i l

l

7 7 , g. . . ,

[; ,(

't,,

1, . ,

Re: FOI A .87-261

n. . .
i. . APPENDIX ___g__

.; RECORDS MAINTAINED IN'THE PDR UNDER THE ABOVE REQUEST NUMBER  !

NUM'ER B DATE ' DESCRIPTION 10- r,:4/25/84 Memorandum for E. ,L. Jordan from T. W. Bishop, subject:

0' "Dcfective Westinghca,sejd0 tors at PVNGS (1 pg.)-

v. - ,

2 .~ 4/6/83 Memorandum.for Multiplen Addressee from J.L. Crews,  !

subject: " Potential Generic Issue: Combustion Engineering -l Reactor Coolant Pump Pressure' Tap Nozzles Developed. through j Wall Cracks due to stainlass Steel Sensitisation from Field

Weld Heat Tnaatment of Adjacent Welds (2 pgs.)
3. 9/15/83 Morning Report - Region V (l'pg.)
4. 2/15/84- Handwritten'noth to E. Licitra from P. Narbut (1 pg.) ~
5. 2/24/84~ Task-Inte(face Agreement (2'pgs.)

t.

4 I f

's I

(

\

'\

i

, i e

s

gg TECHNICAL CONSULTANTS ON ENERGY Date G. Brodenbaugh 1723 Hamdton Aveve-Suite K Richard B Hubbard San Jose. Caldornia 95125 Gregory C. Minor 4 Phone'(408) 266 2716 Mr. Donnie H. Grimsley, Director FREEDOM 0F INFORMATION Division of Rules and Records ACT REQUEST Office of Administration U.S. Nuclear Regulatory Commission j f p g/

Washington, D.C. 20555 6 [

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act, please make -

available at the Commission's Washington, D.C., Public Document Room single copies of records as follows:

A. All documents discussing investigations conducted by or for the Arizona Nuclear Power Project (ANPP) or the NRC regarding the identification and resolution of problems with the Low Pressure Safety Injection (LPSI) pumps at Palo Verde Units 1, 2, and/or 3.

B. All documents discussing investigations conducted by or for ANPP or the NRC regarding I the identification and resolution of problems with the Reactor Coolant System (RCS) pumps at Palo Verde Units 1, 2, and/or 3.

These should-include inspection reports, other technical reports, memos, ANPP submittals, letters and other correspondence between ANPP and the NRC, and other documentation, regardless of origin, regarding these issues.

If there are any questions concerning this request, please contact me directly at (408) 266-2716. Your prompt response to this request will be appreciated.

i

- Sine s ,

/

$7 r gory A. Holmes Associate Consultant

)

l f (' 1