Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216G207 + (15:17:54, 3 December 2024)
- ML20216G209 + (15:17:54, 3 December 2024)
- ML20216G204 + (15:17:55, 3 December 2024)
- ML20216G202 + (15:17:56, 3 December 2024)
- ML20216G200 + (15:17:57, 3 December 2024)
- ML20216G199 + (15:17:57, 3 December 2024)
- ML20216G197 + (15:17:58, 3 December 2024)
- ML20216G196 + (15:17:59, 3 December 2024)
- ML20216G192 + (15:18:00, 3 December 2024)
- ML20216G191 + (15:18:00, 3 December 2024)
- ML20216G188 + (15:18:01, 3 December 2024)
- ML20216G187 + (15:18:02, 3 December 2024)
- ML20216G185 + (15:18:03, 3 December 2024)
- ST-HL-AE-2265, Forwards safety-related Maint Procedures Which Require Use of Jumpers or Lifting Leads,Per NRC Requests.Util Will Not Lift Leads or Install Jumpers for Routine Channel Testing Unless No Other Method Practical + (15:18:03, 3 December 2024)
- ML20216G181 + (15:18:04, 3 December 2024)
- ML20216G180 + (15:18:05, 3 December 2024)
- 05000483/LER-1987-010, :on 870528,discovered That RHR Check Valves Not Tested as Required by Tech Spec 4.0.5.Caused by Personnel Error.Relief Requested for Testing Approved & Personnel Counseled + (15:18:07, 3 December 2024)
- ML20216G178 + (15:18:08, 3 December 2024)
- ML20216G174 + (15:18:09, 3 December 2024)
- 05000373/LER-1998-003-02, :on 980210,abnormal Startup of Idle Reactor Recirculation Loop Analysis Not Bounding Due to Vendor Inadequate Calculation.Caused by GE Insufficient Analyses. Resolution Will Be Addressed by GE CA Program + (15:18:11, 3 December 2024)
- ML20216G168 + (15:18:12, 3 December 2024)
- ML20216G170 + (15:18:12, 3 December 2024)
- ML20216G164 + (15:18:15, 3 December 2024)
- ML20216G162 + (15:18:15, 3 December 2024)
- ML20216G160 + (15:18:16, 3 December 2024)
- ML20216G157 + (15:18:17, 3 December 2024)
- ML20216G156 + (15:18:18, 3 December 2024)
- ML20216G152 + (15:18:18, 3 December 2024)
- ML20216G149 + (15:18:19, 3 December 2024)
- ML20216G151 + (15:18:19, 3 December 2024)
- ML20216G147 + (15:18:20, 3 December 2024)
- NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P + (15:18:21, 3 December 2024)
- ML20216G143 + (15:18:22, 3 December 2024)
- ML20216G141 + (15:18:22, 3 December 2024)
- ML20216G140 + (15:18:23, 3 December 2024)
- ML20216G139 + (15:18:23, 3 December 2024)
- ML20216G137 + (15:18:24, 3 December 2024)
- 05000277/LER-1987-004, :on 870407,primary Containment Isolation Occurred Due to Partial Loss of Startup Source.Operators Immediately Switched Load to 2 Startup Source + (15:18:26, 3 December 2024)
- ML20216G135 + (15:18:27, 3 December 2024)
- ML20216G131 + (15:18:28, 3 December 2024)
- ML20216G132 + (15:18:28, 3 December 2024)
- HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 + (15:18:29, 3 December 2024)
- ML20216G126 + (15:18:30, 3 December 2024)
- ML20216G124 + (15:18:30, 3 December 2024)
- ML20216G122 + (15:18:31, 3 December 2024)
- ML20216G120 + (15:18:32, 3 December 2024)
- LIC-97-0152, Requests Termination of License OP-42606,held by DA Levine, Per 10CFR50.74(a) + (15:18:33, 3 December 2024)
- RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 + (15:18:33, 3 December 2024)
- ML20216G114 + (15:18:34, 3 December 2024)
- ML20216G111 + (15:18:35, 3 December 2024)
- 05000423/LER-1997-048, :on 970806,oversized Primary Grade Water Sys Pump Impeller Could Result in Boron Dilution Event Was Determined.Caused by Insufficient Configuration Control in Design Program.Valves Administratively Locked Closed + (15:18:39, 3 December 2024)
- IR 05000423/1997209 + (15:18:56, 3 December 2024)