wa te d wici l

NEMdRAleUM OF tm0ERSTMOING As part of sqy participation as an Cbserver of the NRC's oversight of Northeast i

Nuclear Energy Company's (NNECO's) conduct of the Independent Corrective Action Verification Program (ICAVP) and other NRC Team Inspection activities at Millstone.

I agree to the folicwing protocols:

I will make advance arrangements with the licensee for site access training e

and badg1ng (sub L

on-site period. ject to fitness-for-duty requirements), pr1or to the actual Pty communicatinn with the licensee will be thro h the NRC Deputy Director of e

ICAVP Oversight. Eugene V.

Imbro or Steven A.

lds. Branch Chief for ICAVP Oversight. With respect to NRC Team Inspection activities. I will communicate with the licensee through the Team Leader.

i When informed of an unannounced assessment activity. I will not release f

e information concerning its time and purpose.

I I will remain in the company of NRC personnel throughout the course of e

assessment activities.

I understand that nty participation may be terminated by the NRC if my conduct e

interferes with a fair and orderly assessment.

I will not be provided with proprietary or safeguards information. I will not e

remove any material from the site without NRC or licensee approval.

)

I understand that in accompanying the NRC inspectors. I do this at my own j

e risk.

NRC will not be responsible for in substances which may occur during the asse,1uries or exposures to harmful ssment and will assume no liability for any incidents associated with sty accompaniment, 1 agree to achere to the same standards of conduct as NRC inspectors during e

assessments.

If I become aware of any apparent non-conformance with safety or regulatory e

reguirements during the assessment. or have any comments on the conduct of the NRC's activities. I will make those observations prom tly known to the NRC team manager on site. Likewise when my overall conclusions or views are substantially different from those of NRC team members. I will advise the l

Deputy Director for ICAVP Oversight or the Team Leader, and forward those v 6 s, in writing. to Dr. W.

D.

Travers. This will allow NRC to take any rwcessery regulatory actions.

under no circumstances will Nuclear Energy Advisory Council (NEAC) e i

corsuunications regarding the results of these assessments be released to the public or the licensee Mfore they are reviewed by the NRC and the inspection

{

report is issued. NEAC comunications may be made publicly available. similar to NRC inspection reports. after they have been tr9tsmitted to and reviewed by hf

')

NRC.

/

Print Name 3c% C. twah.s L Date

-- [ hl c

Signature t bb-M D.

4l

== mb appm p