Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235H854 + (10:18:44, 3 December 2024)
- ML20235H853 + (10:18:45, 3 December 2024)
- ML20235H850 + (10:18:45, 3 December 2024)
- B13150, Forwards Topical Rept NUSCO-165, Large Break LOCA Fuel Rod Response (NUFRAP-T6) & Core Oxidation Evaluation Models (Nucom). Final Rept Providing plant-specific Large Break LOCA Analysis Remains Scheduled for Submittal in Jul 1989 + (10:18:47, 3 December 2024)
- TXX-6563, Informs That Util Corporate Ofcs Telephone Exchange Changed, as Indicated,On 870706 + (10:18:47, 3 December 2024)
- IR 05000324/1987024 + (10:18:48, 3 December 2024)
- ML20235H841 + (10:18:49, 3 December 2024)
- ML20235H842 + (10:18:49, 3 December 2024)
- 05000333/LER-1987-008, :on 870610,w/plant at 100% Power,Reactor Feed Pump Tripped & Low Level Scram Occurred,Due to Failed Pump Seal.Possibly Caused by Suction Pressure Transient.Seal Replaced & Speed Control Sys Will Be Modified + (10:18:51, 3 December 2024)
- ML20235H832 + (10:18:53, 3 December 2024)
- ML20235H834 + (10:18:53, 3 December 2024)
- ML20235H831 + (10:18:54, 3 December 2024)
- ML20235H830 + (10:18:54, 3 December 2024)
- ML20235H829 + (10:18:55, 3 December 2024)
- ML20235H818 + (10:18:56, 3 December 2024)
- ML20235H825 + (10:18:56, 3 December 2024)
- ML20235H816 + (10:18:57, 3 December 2024)
- IR 05000344/1987017 + (10:18:58, 3 December 2024)
- IR 05000219/1988202 + (10:23:05, 3 December 2024)
- ML20235H806 + (10:23:05, 3 December 2024)
- ML20235H803 + (10:23:06, 3 December 2024)
- ML20235H799 + (10:23:07, 3 December 2024)
- ML20235H800 + (10:23:07, 3 December 2024)
- 05000461/LER-1987-032, :on 870604,operations Dept Determined That Stroke Time Test Surveillance Required by Tech Spec 4.6.4.1 Not Performed for Containment Isolation Valve.Caused by Operations Personnel Error.Valve Deactivated + (10:23:09, 3 December 2024)
- ML20235H796 + (10:23:11, 3 December 2024)
- ML20235H797 + (10:23:11, 3 December 2024)
- ML20235H795 + (10:23:12, 3 December 2024)
- ML20235H794 + (10:23:12, 3 December 2024)
- TXX-6552, Interim Deficiency Rept CP-86-51 Re Anchor Bolts Supplied by Hilti Corp.Initially Reported on 860717.Current Evaluation Indicates That half-inch Diameter Bolts Unacceptable for Average Ultimate Tensile Loads.Next Rept Expected by 871021 + (10:23:13, 3 December 2024)
- ML20235H789 + (10:23:14, 3 December 2024)
- ML20235H788 + (10:23:14, 3 December 2024)
- ML20235H785 + (10:23:15, 3 December 2024)
- ML20235H783 + (10:23:17, 3 December 2024)
- ML20235H781 + (10:23:18, 3 December 2024)
- ML20235H780 + (10:23:18, 3 December 2024)
- ML20235H775 + (10:23:19, 3 December 2024)
- ML20235H777 + (10:23:19, 3 December 2024)
- ML20235H773 + (10:23:20, 3 December 2024)
- ML20235H769 + (10:23:23, 3 December 2024)
- ML20235H768 + (10:23:23, 3 December 2024)
- ML20235H765 + (10:23:24, 3 December 2024)
- ML20235H762 + (10:23:26, 3 December 2024)
- IR 05000454/1987034 + (10:23:29, 3 December 2024)
- ML20235H757 + (10:23:29, 3 December 2024)
- ML20235H755 + (10:23:30, 3 December 2024)
- ML20235H754 + (10:23:31, 3 December 2024)
- ML20235H751 + (10:23:32, 3 December 2024)
- ML20235H752 + (10:23:32, 3 December 2024)
- ML20235H749 + (10:23:33, 3 December 2024)
- ML20235H748 + (10:23:33, 3 December 2024)
- ML20235H747 + (10:23:34, 3 December 2024)
- ML20235H746 + (10:23:35, 3 December 2024)