Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235R004 + (09:32:28, 3 December 2024)
- ML20235R009 + (09:32:28, 3 December 2024)
- NRC-89-0036, Annual Operating Rept for Fermi 2 for Jan-Dec 1988 + (09:32:29, 3 December 2024)
- ML20235Q990 + (09:32:31, 3 December 2024)
- ML20235Q988 + (09:32:32, 3 December 2024)
- AECM-89-0042, Forwards Addl Info in Support of 880923 Application for Amend to License NPF-29,adding Alternate DHR Sys + (09:32:34, 3 December 2024)
- ML20235Q974 + (09:32:34, 3 December 2024)
- 05000328/LER-1988-039-01, :on 881109,invertent Train B Containment Ventilation Isolation Occurred.Caused by Incomplete Labeling of Terminals in Main Control Room.Design Changes to Rewire Terminals O-M-12 of RMS Cable Implemented + (09:32:37, 3 December 2024)
- IR 05000410/1987018 + (09:33:12, 3 December 2024)
- ML20235Q968 + (09:33:12, 3 December 2024)
- ML20235Q966 + (09:33:13, 3 December 2024)
- ML20235Q959 + (09:33:18, 3 December 2024)
- ML20235Q962 + (09:33:18, 3 December 2024)
- ML20235Q952 + (09:33:19, 3 December 2024)
- 05000458/LER-1989-002, :on 890112,isolation of RWCU Due to Temp Spike from Thermocouple Servicing Temp Trip Unit 1E31-N6220B Occurred,Caused by Malfunction of Shutoff Adapter Allowing Formation of Steam Plume.Esf Sys Performed + (09:33:21, 3 December 2024)
- ML20235Q949 + (09:33:22, 3 December 2024)
- 05000454/LER-1987-021-03, :on 870917,control Room Ventilation Actuation Occurred Due to Distribution Sys Voltage Transient When Offsite Line Tripped.Mods Installed in 1985 to Reduce Undervoltage Trip Setpoints on All Process + (09:33:23, 3 December 2024)
- ML20235Q937 + (09:33:25, 3 December 2024)
- ML20235Q939 + (09:33:25, 3 December 2024)
- ML20235Q936 + (09:33:26, 3 December 2024)
- ML20235Q929 + (09:33:27, 3 December 2024)
- AECM-89-0039, Forwards Modified Pages from 881219 Application for Amend to License NPF-29 Re Scramming of Plant in Event of Two Recirculation Pump Trip While Mode Switch Is in Run Position,As Discussed in Meeting W/Nrc + (09:33:28, 3 December 2024)
- ML20235Q926 + (09:33:28, 3 December 2024)
- ML20235Q920 + (09:33:29, 3 December 2024)
- ML20235Q919 + (09:33:30, 3 December 2024)
- NL-89-046, Forwards Rept of 1988 Annual Emergency Exercise Conducted on 881003.Exercise Included Util & Offsite Agency Participation & Was Evaluated by NRC & FEMA + (09:33:31, 3 December 2024)
- ML20235Q908 + (09:33:32, 3 December 2024)
- ML20235Q910 + (09:33:32, 3 December 2024)
- ML20235Q903 + (09:33:33, 3 December 2024)
- TXX-6804, Interim Deficiency Rept CP-87-96 Re Cable Shielding Termination Insps.Initially Reported on 870908.Further Technical Evaluation Required to Assess Possible Impact on Safety of Plant.Next Rept Will Be Submitted by 871208 + (09:33:34, 3 December 2024)
- ML20235Q898 + (09:33:34, 3 December 2024)
- ML20235Q893 + (09:33:35, 3 December 2024)
- ML20235Q896 + (09:33:35, 3 December 2024)
- ML20235Q884 + (09:33:37, 3 December 2024)
- ML20235Q868 + (09:33:39, 3 December 2024)
- 05000424/LER-1987-035, :on 870614,steam Generator 4 lo-lo Water Level Led to Reactor Trip,Turbine Trip,Feedwater Isolation & Start Auxiliary Feedwater Pumps.Caused by Failure of Hydraulic Tubing Connection.Connection Replaced + (09:33:41, 3 December 2024)
- ML20235Q851 + (09:33:42, 3 December 2024)
- ML20235Q843 + (09:33:43, 3 December 2024)
- ML20235Q840 + (09:33:45, 3 December 2024)
- ML20235Q835 + (09:33:45, 3 December 2024)
- ML20235Q833 + (09:33:46, 3 December 2024)
- B13144, Forwards Rept Detailing Status of Each Open Item Noted in June 1988 Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR2.790) + (09:33:47, 3 December 2024)
- ML20235Q818 + (09:33:48, 3 December 2024)
- 05000412/LER-1987-011, :on 870730,two Surveillance Procedures in Progress Requiring Channel IV Steam Pressure Bistables for Steam Generator 21C to Be in Tripped Condition.Caused by Personnel Error.Test Engineer Reassigned + (09:33:50, 3 December 2024)
- 05000440/LER-1987-062, :on 870828,RHR Head Spray Containment Isolation Valve Energized in Violation of Tech Spec 3.6.4.Caused by Personnel Error.Operator Involved Counseled Re Need for Greater Attention to Detail + (09:33:52, 3 December 2024)
- ML20235Q811 + (09:33:52, 3 December 2024)
- ML20235Q810 + (09:33:53, 3 December 2024)
- ML20235Q809 + (09:33:54, 3 December 2024)
- ML20235Q806 + (09:33:55, 3 December 2024)
- ML20235Q805 + (09:33:55, 3 December 2024)
- ML20235Q795 + (09:33:57, 3 December 2024)
- ML20235Q798 + (09:33:57, 3 December 2024)