Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236B180 + (08:04:27, 3 December 2024)
- ML20236B182 + (08:04:27, 3 December 2024)
- IR 05000156/1987001 + (08:04:29, 3 December 2024)
- ML20236B176 + (08:04:30, 3 December 2024)
- ML20236B175 + (08:04:30, 3 December 2024)
- 05000369/LER-1987-019, :on 870904,auxiliary Feedwater Autostart Occurred.Caused by Defective Procedure Due to Insufficient Instructions to Prevent Loss of Both Main Feedwater Pumps During Shutdown.Pump Control Valves Reset + (08:04:32, 3 December 2024)
- ML20236B172 + (08:04:33, 3 December 2024)
- ML20236B169 + (08:04:34, 3 December 2024)
- ML20236B165 + (08:04:34, 3 December 2024)
- ML20236B164 + (08:04:35, 3 December 2024)
- ML20236B162 + (08:04:36, 3 December 2024)
- 05000313/LER-1989-001, :on 881217,RCS Hot Leg Resistance Temp Detector Calibr Using Wrong Calibr Data Since Installation in May 1982.Caused by Procedural Inadequacy.Calibr Procedure for TE-1041/1042 Revised to Reflect Correct Calibr + (08:04:38, 3 December 2024)
- ML20236B155 + (08:04:39, 3 December 2024)
- ML20236B152 + (08:04:40, 3 December 2024)
- ML20236B154 + (08:04:40, 3 December 2024)
- ST-HL-AE-2308, Responds to NRC Re Violations Noted in Insp Repts 50-498/87-27 & 50-499/87-27.Corrective Actions:Affected RHR Pump Supports Reinspected to Ensure That Weld Size 5/16 Inch & Discrepant Drawing Revised to Show Appropriate Weld Size + (08:04:41, 3 December 2024)
- ML20236B150 + (08:04:42, 3 December 2024)
- ML20236B146 + (08:04:43, 3 December 2024)
- ML20236B145 + (08:04:44, 3 December 2024)
- BECO-87-119, Requests That All Correspondence from NRC Be Addressed to RG Bird & Listed Individuals + (08:04:45, 3 December 2024)
- ML20236B143 + (08:04:45, 3 December 2024)
- ML20236B142 + (08:04:46, 3 December 2024)
- ML20236B139 + (08:04:47, 3 December 2024)
- ML20236B135 + (08:04:48, 3 December 2024)
- ML20236B136 + (08:04:48, 3 December 2024)
- ML20236B134 + (08:04:49, 3 December 2024)
- ML20236B133 + (08:04:50, 3 December 2024)
- ML20236B132 + (08:04:51, 3 December 2024)
- ML20236B128 + (08:04:52, 3 December 2024)
- ML20236B127 + (08:04:53, 3 December 2024)
- ML20236B126 + (08:04:54, 3 December 2024)
- TAC:60067 + (08:04:54, 3 December 2024)
- ML20236B125 + (08:04:56, 3 December 2024)
- ML20236B124 + (08:04:57, 3 December 2024)
- ML20236B122 + (08:04:58, 3 December 2024)
- ML20236B120 + (08:04:59, 3 December 2024)
- ML20236B119 + (08:05:00, 3 December 2024)
- 05000413/LER-1987-024, :on 870617,after Diesel Generator 1B Declared Inoperable,Unit Supervisor Failed to Verify Operability of Ac Offsite Power Source within 8-h Time Limit.Incident Reviewed W/Supervisor & Appropriate Personnel + (08:05:02, 3 December 2024)
- ML20236B117 + (08:05:03, 3 December 2024)
- ML20236B116 + (08:05:03, 3 December 2024)
- ML20236B114 + (08:05:04, 3 December 2024)
- ML20236B115 + (08:05:04, 3 December 2024)
- ML20236B113 + (08:05:05, 3 December 2024)
- BECO-87-117, Forwards Rept Briefly Describing Changes,Tests & Experiments at Plant for 860122-870121,including Description of Changes, Ref to Relevant FSAR Section,Ref to Safety Evaluations Supporting Each Change & Temporary Test Procedures + (08:05:06, 3 December 2024)
- ML20236B112 + (08:05:06, 3 December 2024)
- U-601052, Responds to NRC Re Violations Noted in Insp Rept 50-461/87-28.Corrective Actions:Four Out of Five Process Radiation Monitors Calibr,Per Revised Procedure 9910.76 & Radiation Protection Procedures Reviewed,Per Tech Specs + (08:05:07, 3 December 2024)
- AECM-89-0026, Provides Rev to Proposed Schedule for Implementing Mods to Dcrdr Program.By End of Refueling Outage 3,all But Two of Category 2 Human Engineering Discrepancies Will Be Completed + (08:05:08, 3 December 2024)
- 05000368/LER-1989-002, :on 890109,discovered That Tech Spec Required 14-day Periodic Surveillance Test for Svc Water Flow Rate to Containment Cooling Units Not Performed.Caused by Personnel Error.Personnel Counseled + (08:05:09, 3 December 2024)
- ML20236B105 + (08:05:10, 3 December 2024)
- W3P89-0047, Responds to Violation Noted in Insp Rept 50-382/88-30. Corrective Actions:Overexposed Individuals Decontaminated Per Methods Established in Health Physics Procedure HP-02-704, Personnel Decontamination + (08:05:10, 3 December 2024)
- ML20236B102 + (08:05:11, 3 December 2024)