Grants Temporary Waiver of Compliance from Tech Spec Tables 3.2.2 & 4.2.1 Until 871221 While Util 871020 Amend Request to Delete Low Reactor Pressure Permissive Switches from ECCS Pump Start Logic Processed
ML20236B143
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/21/1987
From: Boyle M
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8710230367
Download: ML20236B143 (2)


Text

,

y

_u 5

4,,.

)

g j.

October?21,1987 I

k d

4-50-7tt.

DISTRIBUTION i

i Docket No.:

SV5iikTETTTeTaip MBoyle s

NRC/ Local'PDR PShuttleworth

. Mr. Edward J.' Mroczka',' Senior Vice President ISAPD File.

EJordan Nuclear Engineering'and Operations' DCrutchfield BGrimes Northeast Nuclear' Energy Company LBettenhausen JPartlow Post Office Box 270' EMcCabe

0GC Behtesda Hartford, Connecticut 06141-0270 WRaymond ACRS(10)

WKane OPA

Dear Mr. Mroczka:

LRubenstein 3

SUBJECT:

TEMPORARY WAIVER OF COMPLIANCE FROM TECHNICAL SPECIFICATION TABLES 3.2.2 AND 4.2.1; Re:

Millstone Nuclear Power Station, Unit No. 1 By letter d'ated October 20, 1987, you requested an amendment change to Technical Specifications Tables 3.2.2 and 4.2.1 of Facility Operating License

. No. DPR-21 to reflect the deletion of the. low reactor pressure permissive

- switches from the emergency core cooling system-(core spray and low pressure

- coolant injection) pump start logic. The current Technical Specifications.-

cit'ed above states that the low reactor pressure permissive switches are-part q

of the pump start logic and states their minimum test and calibration frequency.

- These switches were deleted from Millstone Unit No. I during the 1987 refueling outage.

We have reviewed.the justification provided by your letter and conclude that the pump start logic without the low reactor pressure permissive switches will not place the plant in an unsafe condition nor will it present any undue risk -

to the health and safety of the public. This conclusion is based upon the technical justifications in your October 20, 1987, letter and upon our review of the removal of these switches in the Integrated Safety Assessment Program (ISAP Topic 2.16, Reactor Protection Trip System).

This letter grants a waiver of compliance with the cited Technical Specifica-tion requirements and will be in effect through December 21, 1987, while we complete the processing of the requested license amendment.

original signed by Michael L. Boyle, Acting Director Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, V and Special Projects cc:

See next page 4 h[n gowccuc +

,1 h

1. vfynlvaun Y\\

\\-

U: ISAPD F D: RP/RI OGC thesda ADI D:

MBoyle b; g<WKane LRubenstein DCr chfield g/2{ /87

//(

/e/z/ /87 h/24/87 to /U /87 8710230367 871021 PDR ADOCK 05000245 P

PDR

_ _ =

l-4 bg Mr. Edward J. Mroczka Millstone Nuclear Power Station-l Northeast Nuclear Energy Company Unit No. 1 I

CC.

Gerald Garfield. Esquire Kevin McCarthy, Director E

Day, Berry & Howard Radiation Control Unit Counselors at law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Wayne'D. Romberg Richard M. Kacich, Manager

-Vice President, Nuclear Operations Generation Facilities Licensing Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut -06141-0270 Hartford,. Connecticut 06*.41-0270 i

Bradford S. Chase, Under Secretary Donald 0..Ncrdquist. Director Energy Division Quality Services Department Office of Policy and Management Northeast Utilities Service Department 80 Washington Street Post Office Box 270

' Hartford, Connecticut 06160 Hartford, Connecticut 06141-0270 Regional Administrator, Region !

J. Stetz, Plant Superintendent U.S. Nuclear Regulatory Commission Millstone, Unit 1 631 Park Avenue.

Northeast Nuclear Energy Company King of Prussia, Pennsylvania 19406 P. O. Box 128 Waterford, Connecticut 06385 j

Northeast Nuclear Energy Company j

ATTN:. Superintendent l

Millstone Nuclear Power Station P. O. Box.128 Waterford, Connecticut 06305 Resident Inspector I

c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford i

Hall of Records 200 Boston Post Road l

Waterford, Connecticut 06385 l

l 1

- _ _ _ _ - _ _ _ _ _. - -.. - _. - -.