Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236B543 + (08:00:20, 3 December 2024)
- IR 05000461/1987023 + (08:00:21, 3 December 2024)
- ML20236B541 + (08:00:22, 3 December 2024)
- 05000334/LER-1989-002-01, :on 890213,reactor Trip Occurred Due to Feedwater Regulating Valve (MFRV) Malfunction.Caused by Failure of electro-pneumatic transducer.Electro-pneumatic Transducers for Valves Replaced + (08:00:23, 3 December 2024)
- ML20236B539 + (08:00:24, 3 December 2024)
- 05000498/LER-1989-008, :on 890212,discovered That Inverter IV-1203 Which Supplies Uninterruptible Power to Distribution Panel DP-1203 Overheating,Causing Actuation of Control Room & Fuel Handling Bldgs HVAC Sys.Transformer Replaced + (08:00:26, 3 December 2024)
- ML20236B536 + (08:00:30, 3 December 2024)
- ML20236B533 + (08:00:32, 3 December 2024)
- ML20236B530 + (08:00:32, 3 December 2024)
- IR 05000259/1987024 + (08:00:35, 3 December 2024)
- ML20236B528 + (08:00:35, 3 December 2024)
- ML20236B526 + (08:00:36, 3 December 2024)
- ML20236B524 + (08:00:37, 3 December 2024)
- PNO-II-87-071, on 871016,licensee Received Package W/ Radiation Levels in Excess of Allowable Limits.Package Contained No Removable Contamination on surface.Med-Physics Representative Will Examine Package on 871017 + (08:00:38, 3 December 2024)
- ML20236B522 + (08:00:38, 3 December 2024)
- ML20236B519 + (08:00:39, 3 December 2024)
- ML20236B517 + (08:00:40, 3 December 2024)
- ML20236B518 + (08:00:40, 3 December 2024)
- ML20236B516 + (08:00:41, 3 December 2024)
- ML20236B514 + (08:00:42, 3 December 2024)
- ML20236B511 + (08:00:43, 3 December 2024)
- ML20236B512 + (08:00:43, 3 December 2024)
- ML20236B510 + (08:00:44, 3 December 2024)
- ML20236B507 + (08:00:46, 3 December 2024)
- ML20236B506 + (08:00:47, 3 December 2024)
- ML20236B505 + (08:00:47, 3 December 2024)
- ML20236B502 + (08:00:49, 3 December 2024)
- TXX-6889, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 871209 + (08:00:49, 3 December 2024)
- TXX-6586, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Charges That Do Not Conform to Vendor Assembly Drawings. Initially Reported on 860514.Evaluation Continuing + (08:00:50, 3 December 2024)
- ML20236B498 + (08:00:51, 3 December 2024)
- ML20236B496 + (08:00:52, 3 December 2024)
- ML20236B495 + (08:00:52, 3 December 2024)
- ML20236B493 + (08:00:53, 3 December 2024)
- ML20236B492 + (08:00:53, 3 December 2024)
- 05000366/LER-1985-017, :on 850430 & 0501,molded Case Circuit Breakers Discovered W/Trip Setpoints &/Or Breaker Locations Contrary to Tech Spec Table 3.8.2.6-1.Caused by Inadequate Instructions for Implementing Design Change + (08:00:56, 3 December 2024)
- ML20236B489 + (08:00:56, 3 December 2024)
- ML20236B487 + (08:00:57, 3 December 2024)
- ML20236B484 + (08:00:58, 3 December 2024)
- ML20236B483 + (08:00:58, 3 December 2024)
- ML20236B482 + (08:00:59, 3 December 2024)
- ML20236B479 + (08:01:00, 3 December 2024)
- ML20236B480 + (08:01:00, 3 December 2024)
- 05000325/LER-1987-021-03, :on 870821,primary Containment Groups 2,3 & 6 Isolations & Logic Scram Occurred.Caused by Inadvertent Deenergization of Plant Emergency Ac Bus E2.Blown Fuse Replaced & Bus E2 Reenergized + (08:01:02, 3 December 2024)
- ML20236B476 + (08:01:03, 3 December 2024)
- ML20236B474 + (08:01:04, 3 December 2024)
- ML20236B473 + (08:01:04, 3 December 2024)
- 1CAN078701, Forwards Rev 5 to Updated SAR for Arkansas Nuclear One,Unit 1 + (08:01:05, 3 December 2024)
- ML20236B472 + (08:01:05, 3 December 2024)
- ML20236B470 + (08:01:06, 3 December 2024)
- ML20236B467 + (08:01:07, 3 December 2024)
- ML20236B468 + (08:01:07, 3 December 2024)
- ML20236B466 + (08:01:08, 3 December 2024)