- 05000424/LER-1987-043, :on 870628,improper Performance of Containment Pressure Surveillance Discovered.Caused by Personnel Error. Temporary Change to Procedure 1400-1 Incorporated Into Applicable Data Sheets + (06:57:51, 3 December 2024)
- 2CAN069804, Application for Amend to License NPF-6,increasing Allowable as-found Lift Setting Tolerances on MSSVs & Pressurizer Safety Valves + (06:57:52, 3 December 2024)
- ML20236G480 + (06:57:53, 3 December 2024)
- ML20236G479 + (06:57:53, 3 December 2024)
- 05000369/LER-1998-003-02, :on 980529,inoperability of 1CF-30 During Unit 1 Cycle 12 from 970906-1117,occurred.Caused by Improper Valve Assembly.Valve Logged Inoperable Under Requirements of TS 3/4.6.3 & Operators Entered Action Statement + (06:57:55, 3 December 2024)
- ML20236G477 + (06:57:56, 3 December 2024)
- NOC-AE-0208, Requests Approval to Use ASME Section IX Code Cases 2142-1 & 2143-1 in Fabrication & Installation of Replacement SGs for Plant + (06:57:57, 3 December 2024)
- ML20236G469 + (06:57:57, 3 December 2024)
- ML20236G468 + (06:57:58, 3 December 2024)
- NLS8700541, Application for Amend to License DPR-46,consisting of Proposed Change 46,replacing U-235 Loading Limit for Spent Fuel Storage Pool W/Infinite Multiplication Factor Limit. Fee Paid + (06:57:58, 3 December 2024)
- ML20236G464 + (06:57:59, 3 December 2024)
- BSEP-98-0136, Responds to NRC Re Violations Noted in Insp Repts 50-324/98-05 & 50-325/98-05.Corrective Actions:Scaffolding Deficiencies Were Corrected,Walkdown of Other Erected Scaffolds Was Performed & Counseled Individuals Involved + (06:58:02, 3 December 2024)
- ML20236G459 + (06:58:02, 3 December 2024)
- 05000369/LER-1998-003, Forwards LER 98-003-00,re Inoperability of 1CF-30 During Unit 1 Cycle 12.Hydraulic Actuators for All of the Unit 1 Feedwater Isolation Valves Are Being Replaced W/Pneumatic Actuators During Current Refueling Outage + (06:58:03, 3 December 2024)
- ML20236G458 + (06:58:03, 3 December 2024)
- B17292, Responds to NRC Re Violations Noted in Insp Rept 50-245/98-206 on 980101-0228.Corrective Actions:Ninety Percent of Accessible Valves in Valve Lineups for Sys in Operation or Sys Credited for Shutdown Risk,Verified + (06:58:04, 3 December 2024)
- ML20236G455 + (06:58:04, 3 December 2024)
- ML20236G453 + (06:58:05, 3 December 2024)
- CY-98-103, Responds to 2.206 Petition Questions Re Spent Fuel Pool Cooling Methods,For Haddam Neck Plant.Listed Commitment Is Made within Ltr + (06:58:13, 3 December 2024)
- TXX-6597, Revised Deficiency Rept,Revising Notice of Deviation,Item I.5 to Reflect New Completion Date of Util Electric Hardware Program as 880101.Addl Insp Attributes Incorporated Into Program + (06:58:13, 3 December 2024)
- ML20236G447 + (06:58:14, 3 December 2024)
- ML20236G446 + (06:58:15, 3 December 2024)
- ML20236G445 + (06:58:15, 3 December 2024)
- 05000456/LER-1987-025, :on 870606,inadvertent Opening of MSIV Occurred During Maint Activities.Caused by Deficiency in Maint Procedure.Event Will Be Reviewed W/Mechanical & Instruments Maint Crew.Procedure Revised + (06:58:17, 3 December 2024)
- ML20236G442 + (06:58:17, 3 December 2024)
- ML20236G441 + (06:58:18, 3 December 2024)
- 05000245/LER-1987-022-01, :on 870702,unacceptable Inclusions Discovered in Base Metal of Isolation Condenser Bl Return Line Piping. Caused by Mfg Defect.Piping Replaced W/Matl More Resistant to IGSCC + (06:58:19, 3 December 2024)
- ST-HL-AE-2312, Advises That Info Provided in Doe/Nrc Forms 741 & 742 Should Be Withheld from Public Disclosure for Listed Reasons & Info Classified as Defined in 10CFR73.21,per NRC 870619 Request + (06:58:20, 3 December 2024)
- ML20236G437 + (06:58:21, 3 December 2024)
- ML20236G436 + (06:58:21, 3 December 2024)
- ML20236G434 + (06:58:22, 3 December 2024)
- ML20236G432 + (06:58:23, 3 December 2024)
- ML20236G431 + (06:58:23, 3 December 2024)
- B17338, Informs of Rev to Commitments Associated W/Notice of Violation 04033.Design Change Eliminated Previous Commitments for Computer Priority Alarm.Attachment 1 Identifies New Commitments Which Have Been Implemented + (06:58:24, 3 December 2024)
- ML20236G426 + (06:58:24, 3 December 2024)
- ML20236G424 + (06:58:25, 3 December 2024)
- 05000456/LER-1987-047, :on 870928,discovered That Required Surveillance for Diesel Generator 1A Not Performed & Diesel Declared Inoperable.Caused by Personnel Error. Surveillance Completed & Diesel Found Operable + (06:58:27, 3 December 2024)
- ML20236G421 + (06:58:27, 3 December 2024)
- B17328, Forwards Revised NRC Form 396, Certification of Medical Exam by Facility Licensee, for Licensed Operator Now Requiring Corrective Lenses for Performing watch-standing Duties.Encl Withheld + (06:58:28, 3 December 2024)
- ML20236G418 + (06:58:28, 3 December 2024)
- IR 05000482/1987026 + (06:58:36, 3 December 2024)
- ML20236G413 + (06:58:36, 3 December 2024)
- ML20236G411 + (06:58:37, 3 December 2024)
- ML20236G410 + (06:58:38, 3 December 2024)
- ML20236G409 + (06:58:39, 3 December 2024)
- 05000289/LER-1987-009-01, :on 870927,personnel Discovered That Liquid Release Monitor RM-L-6 in Defeat & Did Not Automatically Terminate Release from Tank A.Caused by Personnel Error. Defeat Switch Placed in Enable + (06:58:41, 3 December 2024)
- ML20236G406 + (06:58:42, 3 December 2024)
- 05000397/LER-1987-019, :on 870628,reactor Scram & Partial Containment Isolation Occurred Due to Reactor Protection Sys (RPS) Full Trip.Caused by Concurrent Component Failures in Both RPS Channels.Pressure Switch Replaced + (06:58:44, 3 December 2024)
- ML20236G403 + (06:58:45, 3 December 2024)
- ML20236G404 + (06:58:45, 3 December 2024)
- ML20236G401 + (06:58:46, 3 December 2024)