Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M66753 + (01:28:32, 27 May 2025)
- IR 05000269/1993017 + (01:28:50, 27 May 2025)
- ML20056F106 + (01:29:13, 27 May 2025)
- 05000458/LER-1993-010, :on 930514,SDC Loss for Three Minutes When SDC Suction Valves Closed.Caused by Failure to Identify Need for Compensatory Measures.Revised Procedural Guidance Clarifying Valve Isolation + (01:29:35, 27 May 2025)
- TXX-9328, Forwards line-by-line Description of Changes in Amend 89 to FSAR + (01:30:35, 27 May 2025)
- IR 05000327/1993024 + (01:30:40, 27 May 2025)
- IR 05000395/1993016 + (01:31:30, 27 May 2025)
- IR 05000327/1993027 + (01:31:37, 27 May 2025)
- IR 05000482/1993014 + (01:31:41, 27 May 2025)
- ML20056E683 + (01:31:48, 27 May 2025)
- TXX-9327, Responds to Suppl 5 of GL 89-10, Inaccuracy of MOV Diagnostic Equipment + (01:32:33, 27 May 2025)
- VR-SECY-19-0071, Denial of Petition for Rulemaking on Fire Protection Compensatory Measures (PRM-50-115; NRC-2017-0132) + (01:32:41, 27 May 2025)
- L-93-010, Forwards Application for Exemption from 10CFR50 App J & Proposed Amend to OL PCOL-93/1010 Re Local Leak Rate & Integrated Leak Testing Intevals & TS Changes to Implement Exemption + (01:33:16, 27 May 2025)
- 05000271/LER-1993-004, :on 930225,discovered That Surveillance for Jet Pumps Not Performed During Single Loop Operations Due to Inadequate Plant Procedures.Procedures OP-4110 & OP-2428 Revised + (01:33:22, 27 May 2025)
- B14542, Proposed Tech Specs Permanently Removing Ability for Plant to Operate W/Three Loops While in Modes 1 or 2 + (01:33:48, 27 May 2025)
- ML20056E321 + (01:33:53, 27 May 2025)
- ML20056E277 + (01:34:09, 27 May 2025)
- 05000499/LER-1993-013-01, :on 930719,Train B CCW Pump 2B Received Automatic Actuation Signal from non-nuclear Supply Header Low Pressure Signal Due to Less than Adequate Plant Impact review.M0V-0236 Repaired + (01:34:28, 27 May 2025)
- ML20056E156 + (01:34:45, 27 May 2025)
- TAC:M79067 + (01:34:53, 27 May 2025)
- IR 05000271/1993010 + (01:35:12, 27 May 2025)
- IR 05000352/1993010 + (01:35:15, 27 May 2025)
- 05000440/LER-1993-003, :on 930113-14,LLRT of Three MSL Penetrations Determined Leakaged in Excess of Ts.Caused by Defective Gaskets.Valves & Flanges Replaced & Retested + (01:35:49, 27 May 2025)
- IR 05000440/1993007 + (01:36:03, 27 May 2025)
- ML20056D868 + (01:36:29, 27 May 2025)
- ML20056D846 + (01:36:36, 27 May 2025)
- 05000245/LER-1993-006, :on 930604,dicovered Unsealed Fire Barrier Penetration in TS Fire Wall Due to Lack of Detailed Guidance Re Procedure Used in Insp.Established Fire Watch to Compensate for Unsealed Penetrations + (01:36:39, 27 May 2025)
- 05000245/LER-1993-006-01, Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars + (01:36:42, 27 May 2025)
- IR 05000382/1993022 + (01:37:06, 27 May 2025)
- ML20056D644 + (01:38:05, 27 May 2025)
- 05000482/LER-1993-004, :on 930316,discovered That Broken Fuel Rod Segment Protruding Out of Fuel Assembly F67 at Core Position H-6 Due to grid-to-rod Fretting.Detailed Remote Visual Insp Conducted + (01:38:09, 27 May 2025)
- IR 05000454/1993001 + (01:38:40, 27 May 2025)
- ML20056D530 + (01:38:48, 27 May 2025)
- 05000416/LER-1993-003, :on 930324,SSW C Sys Pump Motor Failed Due to Movement of Motor Stator End Windings During Motor star-ups.SSW C Pump Replaced & Failed Motor Refurbished by GE & Being receipt-inspected + (01:39:03, 27 May 2025)
- TAC:M83513 + (01:39:10, 27 May 2025)
- ML20056D398 + (01:39:32, 27 May 2025)
- IR 05000327/1993300 + (01:39:38, 27 May 2025)
- IR 05000302/1993008 + (01:40:14, 27 May 2025)
- IR 05000302/1993009 + (01:40:29, 27 May 2025)
- IR 05000338/1993014 + (01:40:35, 27 May 2025)
- TXX-9326, Notifies That Jd Stone Operator License Number OP-42437 Will No Longer Be Performing License Dutied & Request That License Be Discontinued + (01:41:22, 27 May 2025)
- IR 05000219/1993006 + (01:42:35, 27 May 2025)
- IR 05000528/1993018 + (01:42:39, 27 May 2025)
- IR 05000424/1993012 + (01:42:42, 27 May 2025)
- DD-93-13, Informs That Time Provided within Which Commission May Act to Review DD-93-13 Has Expired & Commission Has Declined Review.Decision Became Final Agency Action on 930702. W/Certificate of Svc.Served on 930721 + (01:42:44, 27 May 2025)
- IR 05000528/1993015 + (01:43:08, 27 May 2025)
- TXX-9323, Forwards Rev 12 to Technical Requirements Manual. Manual Revs Evaluated for Relative Significance & Reviewed Under 10CFR50.59 Process & Found Not to Include Any Unreviewed Safety Questions + (01:43:29, 27 May 2025)
- ML20056C765 + (01:43:46, 27 May 2025)
- ML20056C445 + (01:44:53, 27 May 2025)
- ML20056C431 + (01:44:58, 27 May 2025)
- TAC:M84749 + (01:45:30, 27 May 2025)