- L-93-001, Advises That Draft Decommissioning Funding Plan in Final Stages of Internal Review & Expected to Be Submitted in Next Few Wks.Licensee Stated That Funding Plan Would Be Submitted by End of 1992 + (20:14:28, 25 May 2025)
- L-93-002, Advises That Draft Decommissioning Funding Plan Presently in Final Stages of Internal Review & Expected to Be Completed within Next Few Wks.Plan Originally Expected to Be Submitted on or Before 921231,per Licensee + (20:14:38, 25 May 2025)
- ML20127A741 + (20:14:45, 25 May 2025)
- IR 05000341/1992018 + (20:15:17, 25 May 2025)
- DD-92-07, Informs That Time within Which Commission May Act to Review Directors Decision DD-92-07 Expired.Commission Declined Review.Decision Became Final Agency Action on 931218.W/ Certificate of Svc.Served on 920104 + (20:15:18, 25 May 2025)
- IR 05000373/1992028 + (20:15:38, 25 May 2025)
- ML20127A464 + (20:16:30, 25 May 2025)
- NUREG-0694, Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance + (20:21:51, 25 May 2025)
- IR 05000546/1979008 + (20:31:12, 25 May 2025)
- IR 05000293/1992027 + (20:34:03, 25 May 2025)
- 05000301/LER-1981-002, Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps + (20:36:23, 25 May 2025)
- IR 05000424/1992030 + (20:37:30, 25 May 2025)
- IR 05000277/1991099 + (20:37:54, 25 May 2025)
- 05000321/LER-1981-038-03, /03L-0:on 810424,local Leak Rate Test Coordinator Reviewed 810423 Test Results & Determined That Valve G11-F019 Was Leaking Excessively.Cause Unknown.Valve Will Be Repaired & Retested.Investigation Underway + (20:40:43, 25 May 2025)
- 05000321/LER-1981-038, Forwards LER 81-038/03L-0 + (20:40:49, 25 May 2025)
- TAC:42126 + (20:41:23, 25 May 2025)
- ML20126K668 + (20:42:05, 25 May 2025)
- IR 05000313/1980020 + (20:44:01, 25 May 2025)
- NUREG-0785, Forwards Draft NUREG-0785, Safety Concerns Associated W/Pipe Breaks in BWR Scram Sys. Requests Rept Re Applicability to Facility & Determination of Remedial Measures + (20:44:33, 25 May 2025)
- A800058, Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-200 + (20:45:41, 25 May 2025)
- 05000295/LER-1981-002-03, MSIV 1B Failed to Close During Closure Time Testing While in Hot Shutdown Mode. Caused by Failure of Two Dc Solenoid Valves to Actuate.Both Valves Replaced + (20:45:51, 25 May 2025)
- IR 05000397/1985007 + (20:46:00, 25 May 2025)
- 05000295/LER-1981-002, Forwards Updated LER 81-002/03X-1 + (20:46:01, 25 May 2025)
- A810017, Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages + (20:46:24, 25 May 2025)
- IR 05000313/1981002 + (20:47:59, 25 May 2025)
- 05000245/LER-1981-003-01, /01P-0:on 810419,two Containment Instrument Isolation Valves Found in Closed Position.Isolation Valve to Pressure Instrumentation Which Bypasses Reactor Protection Sys Scrams Also Closed.Corrective Action in Followup Rept + (20:48:22, 25 May 2025)
- 05000336/LER-1990-015, :on 900919,unit Experienced Inadvertent Isolation of Containment Purge Valves.On 900920,unit Experienced Actuation of SI Actuation Sys.Caused by Operator Error.Technician Counseled + (20:49:36, 25 May 2025)
- 05000336/LER-1991-010, :on 911018,reanalysis of Main Steam Line Break Confirmed That Main Steam Line Break Exceeded Containment Design Limits.Caused by Incorrect Assumption in FSAR Analysis.Jco Developed & Mods Installed + (20:49:43, 25 May 2025)
- IR 05000272/1985008 + (20:50:41, 25 May 2025)
- IR 05000267/1981001 + (20:50:54, 25 May 2025)
- IR 05000445/1992051 + (20:51:37, 25 May 2025)
- TAC:55647 + (20:51:38, 25 May 2025)
- IR 05000445/1992047 + (20:51:57, 25 May 2025)
- ML20126J314 + (20:52:07, 25 May 2025)
- NUREG-0659, Forwards IEEE Comments on NUREG-0659.Response to Comments Should Be Received by 810421 + (20:52:13, 25 May 2025)
- TAC:11260 + (20:53:18, 25 May 2025)
- 05000353/LER-1990-006-01, :on 900312,automatic Actuation of HPCI Sys & Primary Containment & Reactor Vessel Isolation Control Sys Occurred.Caused by Spurious Low Reactor Water Level Signal. Event Discussed at I&C Group Meeting + (20:55:34, 25 May 2025)
- IR 05000321/1980048 + (20:56:04, 25 May 2025)
- 05000334/LER-1981-029, Forwards LER 81-029/01T-0 + (20:56:36, 25 May 2025)
- 05000346/LER-1981-001-01, /01X-1:on 810107,discovered Contractor Personnel on 801204 Disassembled Restraints Other than Those Requested & Failed to Perform Reassembly in Timely Manner. Caused by Inadequate Procedural Control + (20:56:50, 25 May 2025)
- 05000346/LER-1981-001, Forwards LER 81-001/01X-1 + (20:56:54, 25 May 2025)
- 05000344/LER-1992-026-04, Forwards LER 92-026-04 Discussing Addl Degraded 3 H Fire Barriers & Barrier Penetrations Discovered During 1992 18 Month Fire Barrier Penentration Surveillance.Evaluations Will Be Completed & Provided in Suppl Rept by 930701 + (20:57:40, 25 May 2025)
- ML20126H336 + (20:57:49, 25 May 2025)
- 05000278/LER-1981-011-03, /03L-0:on 810307,seven MSIVs Failed Individual Tech Spec Leakage Limits.Single Valves Failed on HPCI 2-inch Turbine Exhaust Line.Test Taps Failed on Reactor Core Isolation Cooling 10 & 2-inch Exhaust Lines.Cause Unknown + (20:57:59, 25 May 2025)
- IR 05000508/1979010 + (20:59:26, 25 May 2025)
- 05000206/LER-1990-018, :on 900920 & 25,concluded That Testing for 10 Main Steam ASME Code Class Valves Had Not Been Performed Per Unit 1 TS 4.7 IST Requirements.Caused by Failure to Update Program Correctly.Ist Program Updated + (21:00:08, 25 May 2025)
- IR 05000302/1992301 + (21:02:12, 25 May 2025)
- SECY-19-0126, VR-SECY-19-0126: Closure of Petition for Rulemaking on Categorization of the Licensee Fee Category for Full-Cost Recovery (PRM-170-7; NRC-2018-0172) (Baran) + (21:02:23, 25 May 2025)
- EPID:L-2019-LLA-0287 + (21:02:30, 25 May 2025)
- ML20126G349 + (21:02:52, 25 May 2025)
- IR 05000348/1980041 + (21:04:09, 25 May 2025)