Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-9306, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-51 & 50-446/92-51 on 921025-1205.C/As:future Technical Bulletin Will Be Processed & Tracked Through Vendor Equipment Technical Info Program + (17:40:45, 25 May 2025)
- ML20128L478 + (17:41:34, 25 May 2025)
- ML20128K985 + (17:43:48, 25 May 2025)
- ML20128K964 + (17:43:55, 25 May 2025)
- IR 05000400/1985021 + (17:44:14, 25 May 2025)
- IR 05000456/1992025 + (17:47:57, 25 May 2025)
- ML20128K060 + (17:48:56, 25 May 2025)
- TAC:M84220 + (17:49:11, 25 May 2025)
- PMNS20200271, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:53, 25 May 2025)
- PMNS20200238, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:56, 25 May 2025)
- PMNS20200268, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:49:58, 25 May 2025)
- PMNS20200266, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:00, 25 May 2025)
- PMNS20200237, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:02, 25 May 2025)
- PMNS20200265, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:04, 25 May 2025)
- PMNS20200264, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:05, 25 May 2025)
- PMNS20200278, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:07, 25 May 2025)
- PMNS20200277, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:09, 25 May 2025)
- PMNS20200275, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:11, 25 May 2025)
- PMNS20200274, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:13, 25 May 2025)
- PMNS20200276, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:15, 25 May 2025)
- PMNS20200272, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:17, 25 May 2025)
- PMNS20200273, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:19, 25 May 2025)
- PMNS20200270, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:21, 25 May 2025)
- ML20128J555 + (17:50:23, 25 May 2025)
- PMNS20200267, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:23, 25 May 2025)
- PMNS20200269, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (17:50:25, 25 May 2025)
- TAC:57415 + (17:52:10, 25 May 2025)
- 05000265/LER-1993-004, :on 930114,noticed That Recombiner Temperatures Had Not Been Verified to Be in Allowable Band During Previous Four Shifts.Caused by Personnel Error.Individuals Involved Counseled on Mistakes + (17:52:41, 25 May 2025)
- ML20128H165 + (17:56:18, 25 May 2025)
- ML20128H069 + (17:56:46, 25 May 2025)
- ML20128G959 + (17:57:24, 25 May 2025)
- ML20128G792 + (17:58:17, 25 May 2025)
- TAC:57126 + (17:58:25, 25 May 2025)
- IR 05000327/1992037 + (17:58:46, 25 May 2025)
- 05000458/LER-1991-008-04, Forwards LER 91-008-04,documenting Addl Case of Improper Cable Separation Discovered as Result of Followup Safety Sys Functional Insp + (18:01:40, 25 May 2025)
- 05000443/LER-1993-002, :on 930107,discovered Potential for Premature Opening of Containment Bldg Spray Sump Isolation Valves. Caused by Failure to Recognize Sys Interactions.Affected Procedures Revised & Event Reviewed + (18:02:35, 25 May 2025)
- TAC:57419 + (18:02:46, 25 May 2025)
- IR 05000289/1977036 + (18:03:11, 25 May 2025)
- IR 05000324/1992044 + (18:03:26, 25 May 2025)
- IR 05000289/1977013 + (18:03:28, 25 May 2025)
- IR 05000289/1976008 + (18:03:45, 25 May 2025)
- IR 05000483/1992015 + (18:04:24, 25 May 2025)
- 05000338/LER-1993-003, :on 930122,three CRD Mechanism Cooling Fan Timers Drifted Outside Setpoint Tolerance Limits Specified in TS Table 4.8-1.Caused by Poor Repeat Accuracy of Agastat 2400/7000 Time Delays.Relays Reset + (18:04:59, 25 May 2025)
- IR 05000445/1993004 + (18:05:17, 25 May 2025)
- HL-1316, Monthly Operating Repts for Jan 1993 for Ei Hatch Nuclear Plant,Units 1 & 2 + (18:06:16, 25 May 2025)
- 05000498/LER-1992-003, :on 920314,reactor Tripped Due to Failure to Follow Procedures During RCS Flow Transmitter Restoration. Dept Training Sessions Conducted for Appropriate Maint Personnel + (18:06:48, 25 May 2025)
- 05000282/LER-1993-002, :on 921129,fire Door Between CR & Records Room & Fire Door Between CR & Operators Study Area Blocked Open to Provide Cooling.No Compensatory Measures Taken.Doors Closed & Administrative Procedures Revised + (18:07:09, 25 May 2025)
- 05000213/LER-1993-001, :on 930107,discovered That Fire Barrier Protecting Switchgear Room a from Turbine Bldg Open W/O Fire Watch Established.Caused by Personnel Error.Personnel Counseled on Procedural Requirements + (18:07:33, 25 May 2025)
- TAC:M82947 + (18:10:19, 25 May 2025)
- TAC:M60207 + (18:10:26, 25 May 2025)
- 05000397/LER-1992-032, :on 920702,unplanned Actuation of ESF Component Occurred Due to Decrease in Reactor Water Level Resulting from Voided Feedwater Piping.Water Level Restored within Normal Operating Parameters + (18:11:05, 25 May 2025)