Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000290/2018001 + (10:04:27, 25 May 2025)
- TAC:M97370 + (10:06:30, 25 May 2025)
- 05000245/LER-1996-046-01, Forwards Supplemental LER 96-046-01 Which Documents an Event That Occurred at Mnps,Unit 1 on 960627.Supplement Changes Completion Date of Commitment B15820 from 961115 to 970301 + (10:06:40, 25 May 2025)
- 05000423/LER-1996-026, :on 960730,non-conservative Primary Grade Water Flow Rates Was Used in Boron Dilution Safety Analysis. Caused by Loss of Control of Tracking Appropriate Design Basis Calculations.Calculations Will Be Updated or Deleted + (10:06:43, 25 May 2025)
- ML20134K922 + (10:07:05, 25 May 2025)
- ML20134K771 + (10:07:43, 25 May 2025)
- 05000369/LER-1996-003, :on 960618,during Scheduled Operability Test of EDG 1A,EDG Declared Inoperable.Caused by Equipment Failure/ Malfuction of EDG 1A & Equipment Failure & Mfg Process Deficiency of EDG 1B.EDGs SD & Failed Components Replaced + (10:08:16, 25 May 2025)
- ML20134K612 + (10:08:38, 25 May 2025)
- NUREG-1366, Amends 170 & 152 to Licenses NPF-9 & NPF-17,respectively, Incorporating Guidance & Recommendations for Diesel Generators Contained in NUREG-1366,GL 93-05,Gl 94-01 & NUREG-1431 + (10:11:20, 25 May 2025)
- 05000245/LER-1996-054, :on 961030,high Range Stack Gas Monitor Failed & Declared Inoperable.Due to Intermittent Nature of Failure. Cause of Event Will Be Provided in Supplemental Rept.Cause of Intermittent Failures Will Be Determined + (10:13:17, 25 May 2025)
- 05000423/LER-1997-002, :on 970108,torquing of Battery Connections Not Performed as Part of Connection Tightness Checks Occurred. Caused by Lack of Effective Verification & Validation of Maint Procedure.Procedure Revised + (10:13:23, 25 May 2025)
- ML20134J690 + (10:14:15, 25 May 2025)
- ML20134J377 + (10:17:19, 25 May 2025)
- IR 05000250/1985037 + (10:17:37, 25 May 2025)
- ML20134J153 + (10:20:37, 25 May 2025)
- ML20134J074 + (10:21:33, 25 May 2025)
- EPID:L-2019-LLR-0078 + (10:21:56, 25 May 2025)
- EPID:L-2019-LLA-0134 + (10:22:05, 25 May 2025)
- ML20134H928 + (10:22:16, 25 May 2025)
- IR 05000259/1984052 + (10:23:34, 25 May 2025)
- ML20134H692 + (10:23:46, 25 May 2025)
- 05000285/LER-1996-003, :on 960425,fuel Movement W/O Control Room Filtration in Operation Was Noted.Caused by Inadequate Implementation of Change to Station Design Basis.Appropriate Station Operation Procedures Have Been Revised + (10:24:16, 25 May 2025)
- L-96-024, Forwards Revs to Security Plan for Pbnp.Encl Withheld + (10:27:46, 25 May 2025)
- ML20134H147 + (10:29:14, 25 May 2025)
- 05000336/LER-1996-031, Forwards LER 96-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961003.Commitments,listed + (10:29:56, 25 May 2025)
- 05000341/LER-1996-013, :on 961004,determined Nonconservative Bias Existed for Calculating Core Thermal Power Due to Reactor Recirculation Pump Power Computer Point Scaling Error. Discrepancy Corrected + (10:35:17, 25 May 2025)
- L-83-100, Responds to 850628 Generic Ltr 85-12 Re TMI Action Plan Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. SECY-82-475 & Generic Ltr 83-10 Provide Issue Resolution. Generic Ltr 83-10d Info to Be Submitted by 860131 + (10:37:40, 25 May 2025)
- IR 05000280/1995020 + (10:38:53, 25 May 2025)
- ML20134F673 + (10:42:41, 25 May 2025)
- ML20134F627 + (10:42:58, 25 May 2025)
- 05000341/LER-1985-039, :on 850716,after Starting HPCI Sys to Perform Startup Test,Oil Leak Developed at Operator of Turbine Stop Valve.Caused by Loose Flange Between Pilot Valve Assembly & Valve Operator.Flange Bolts Tightened + (10:43:06, 25 May 2025)
- ML20134F550 + (10:43:24, 25 May 2025)
- ML20134F533 + (10:43:29, 25 May 2025)
- 05000424/LER-1990-008, S-00:on 901011,eleven Documents Found Unattended & Unsecured in Folder on Desk Being Moved.Caused by Cognitive Personnel Error.Safeguards Documents Returned to Their Approved Storage Container + (10:43:34, 25 May 2025)
- 05000424/LER-1990-007, S-00:on 900829,safeguards Info Container Observed Unsecured & Unattended in Document File Room.Caused by Safeguards Info Coordinator Failure to Secure Container Before Going to Lunch.Coordinator Counseled & Reprimanded + (10:43:38, 25 May 2025)
- ML20134F443 + (10:44:06, 25 May 2025)
- 05000341/LER-1996-024, :on 961228,automatic Reactor Scram Occurred Due to Perturbations in Reference Leg Backfill Sys While Placing Sys in Service.Procedures Revised + (10:44:10, 25 May 2025)
- ML20134F404 + (10:44:21, 25 May 2025)
- ML20134F372 + (10:44:33, 25 May 2025)
- ML20134F361 + (10:44:37, 25 May 2025)
- ML20134F344 + (10:44:43, 25 May 2025)
- ML20134F321 + (10:44:49, 25 May 2025)
- ML20134F317 + (10:44:52, 25 May 2025)
- ML20134F314 + (10:44:54, 25 May 2025)
- ML20134F313 + (10:44:55, 25 May 2025)
- ML20134F283 + (10:45:04, 25 May 2025)
- 05000395/LER-1996-007, :on 960730,determined That Itt Barton Model 763 Pressure Transmitters Safety Hazard After Previous Failures. Caused by Loose Strain Gauge Lead.Devices Returned for Analytical Testing.Also Reportable Per Part 21 + (10:45:11, 25 May 2025)
- ML20134F252 + (10:45:16, 25 May 2025)
- 05000327/LER-1985-030-01, :on 850721,ESF Actuations for Auxiliary Feedwater Pump Start Occurred Due to Loss of Both Main Feed Pumps & hi-hi Level in Generator Loop 4.Caused by Failed Condensate Dump Back Valve + (10:45:20, 25 May 2025)
- 05000249/LER-1984-005-03, :on 840716,during Unit Shutdown for Turbine Repair,Lpci Submarine Door Found Open.Caused by Personnel Error.Doors Secured W/Locking Bar to Prevent Handle Operation + (10:45:25, 25 May 2025)
- ML20134F109 + (10:45:54, 25 May 2025)