Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DD-81-15, Notice of Issuance of Directors Decision DD-81-15,denying Petition to Institute Enforcement Action Against Fl Power & Light Co for Failure to Abide by Antitrust Condition of Facility License + (02:36:17, 25 May 2025)
- ML20140A904 + (02:36:34, 25 May 2025)
- ML20140A871 + (02:36:42, 25 May 2025)
- ML20140A849 + (02:36:48, 25 May 2025)
- ML20140A804 + (02:36:59, 25 May 2025)
- ML20140A580 + (02:38:12, 25 May 2025)
- NUREG-0830, Advises That Condition 2.c.(3)(a) of License NPF-30 Fulfilled,Based on & 860117 Rept Re Environ Qualification Program for Electrical Equipment.Program Previously Accepted Per NUREG-0830,Section 3.11 + (02:38:21, 25 May 2025)
- ML20140A495 + (02:38:56, 25 May 2025)
- IR 05000335/1996004 + (02:41:45, 25 May 2025)
- 05000346/LER-1981-035-03, /03X-1:on 810624,analysis of Containment Purge Exhaust Valves Determined That Valves Not Operable Per Design of Sar.Caused by Design Deficiency by H Pratt.Valves Disabled to Prevent Use in Models 1-4 + (02:42:07, 25 May 2025)
- TAC:M89398 + (02:43:44, 25 May 2025)
- ML20139A265 + (02:44:00, 25 May 2025)
- OIG-17-A-19, Status of Recommendations: Evaluation of NRCs Network Storage Interruption Dated May 21, 2020 + (02:44:12, 25 May 2025)
- ML20139A145 + (02:44:18, 25 May 2025)
- TAC:52980 + (02:45:12, 25 May 2025)
- ML20138S008 + (02:45:31, 25 May 2025)
- ML20138R802 + (02:46:53, 25 May 2025)
- ML20138R601 + (02:49:46, 25 May 2025)
- ML20138R585 + (02:49:56, 25 May 2025)
- ML20138R561 + (02:50:12, 25 May 2025)
- ML20138R403 + (02:52:08, 25 May 2025)
- IR 05000272/1985029 + (02:52:10, 25 May 2025)
- ML20138R363 + (02:52:28, 25 May 2025)
- 05000317/LER-1982-085-03, /03X-1:on 821230,ESFAS AL Sequencer Inoperable During Surveillance Testing & Handswitch for CTMT Spray Pump 11 Placed in pull-to-lock.Caused of Failure Unknown.Module Replaced.Failed Module Returned to Vendor + (02:57:42, 25 May 2025)
- ML20138Q733 + (02:58:28, 25 May 2025)
- 05000336/LER-1995-020-01, :on 950516,automatic Actuation of Engineered Safety Feature Occurred During Maint.Caused by Procedure Deficiency.Revised Operations Procedure OP-2384 to Add Appropriate Caution for de-energization of Cabinets + (02:58:58, 25 May 2025)
- ML20138Q564 + (02:59:26, 25 May 2025)
- ML20138Q421 + (03:00:33, 25 May 2025)
- ML20138Q409 + (03:00:38, 25 May 2025)
- TAC:59188 + (03:00:40, 25 May 2025)
- ML20138Q339 + (03:01:01, 25 May 2025)
- 05000245/LER-1996-046, :on 960627,failure to Perform Applicable 10CFR50 Appendix J Tests to Satisfy TSs Occurred. Caused by Lack of Support for Conservative Decision Making at Millstone Unit 1.Appendix J Program Has Been Completed + (03:01:56, 25 May 2025)
- ML20138Q222 + (03:02:13, 25 May 2025)
- 05000245/LER-1996-046-03, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed + (03:02:24, 25 May 2025)
- ML20138Q164 + (03:02:39, 25 May 2025)
- 05000245/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970131,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii). Util Commitments Made within Ltr,Listed + (03:03:00, 25 May 2025)
- ML20138Q062 + (03:03:20, 25 May 2025)
- 05000029/LER-1985-006, :on 851120,during Surveillance Testing,Three Main Condensate Pump Circuit Breakers Failed to Open on Receipt of Trip Signal.Caused by Open Circuit + (03:03:50, 25 May 2025)
- ML20138P975 + (03:03:53, 25 May 2025)
- 05000289/LER-1981-013-01, /01X-1:on 811125,bubble Leakage Test Indicated Leaking Tubes in once-through Steam Generators (OTSG) a & B. Caused by Inadvertent Introduction of Sulfur Into Rcs. Chemical Agent Removed & OTSGs Repaired + (03:05:47, 25 May 2025)
- ML20138P355 + (03:08:40, 25 May 2025)
- 05000423/LER-1996-009, :on 960423,inoperable Shutdown Margin Monitors from Low Count Rate Occurred Due to Inadequate Design Control.Reduced SMM Setpoint + (03:09:13, 25 May 2025)
- ML20138P051 + (03:11:31, 25 May 2025)
- ML20138N996 + (03:11:58, 25 May 2025)
- ML20138N856 + (03:13:06, 25 May 2025)
- ML20138N804 + (03:13:29, 25 May 2025)
- TAC:60475 + (03:21:37, 25 May 2025)
- ML20138N448 + (03:22:09, 25 May 2025)
- ML20138N257 + (03:23:00, 25 May 2025)
- 05000259/LER-1985-049, :on 850623,determined That Weld Repair Procedure Used to Repair Diesel Generator Battery Rack Stud Not Suitable for Welding of ASTM A-307 Matls.Studs Installed + (03:24:55, 25 May 2025)
- TAC:54554 + (03:25:27, 25 May 2025)