r
'*'
..
DR SP125
Docket No.
50-482
License No. NPF-42
h
Kansas Gas and Electric Company
. ATTN:
Glenn-L. Koester
~
. .Vice President - Nuclear
' P. O. Box ' 208 ~
Wichita, Kansas 67201
- Gentlemen:
SUBJECT:
NOTICEOF' VIOLATION (NRCINSPECTIONREPORTNO. 50-482/85-35)
Thisirefers to the inspection conducted during the period September 1 through
October 4,'1985, of activities authorized by NRC Operating License No. NPF-42,-
for the Wolf Creek Generating Station, Burlington, Kansas. A number of violations
of NRC requirements were identified during this inspection. An enforcement.
conference was not deemed necessary because of the corrective measures that we
understand your staff-has taken.
Violation A involves centrifugal cnarging pump A (CCP-A) which was taken out' of
service for maintenance on August 27, 1985. The pump was declared operable
on August 30, 1985 after maintenance was completed even though the discharge
isolation valve for CCP-A was still closed. This resulted in a technical
specification action statement being exceeded by 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />.
You discovered the
violation on August-31, 1985 and reported it to the NRC Senior Resident
Inspector on the next working day-(September 3,1985).
Violation B involves the failure of a worker to observe protective clothing
requirements of a radiation work permit. Violation C involves the violation of'
a technical specification . requirement to establish a fire watch patrol or
increase containment temperature monitoring frequency whenever fire detection
instrumentation in certain zones is out of service. Violation D addresses a
failure to follow installation criteria for various conduits. Violation E
involves failure to follow housekeeping requirements.
In accordance with the " General Statement of Policy and Procedure for NRC
- Enforcement Actions," 10 CFR Part 2. Appendix C (1985), Violation A described
'
in the enclosed Notice has been classified as a Severity Level III violation.
'
Normally, a civil penalty is considered for a Severity Level III violation.
However, after consultation with the Director Office of Inspection and
Enforcement. I have decided that a civil penalty will not be proposed in this
case because your staff promptly identified and reported the violation to the
NRC and unusually prompt and extersive corrective action was taken to prevent.
recurrence.
CERTIFIED MAIL
kETURN RECEIPT REQUESTED
__,
8532240005-851218
~"
s
.gDR
ADOCK 03000482 : '
,
e
.
.
e.
3
u-
,- j.
,
~k
.
.
.m
w
Kansas. Gas and Electric Company-
-2-
,
You-.are required to respond to this' letter and should follow the . instructions -
'
specified in the enclosed. Notice when preparing.your response.
In your response,
- you should. document the specific. actions taken and any additional actions you
[
w
-plan:to prevent recurrence. -(Other specific responses required should.be. addressed
>
as required;) . After reviewing your response -to this LNotice, including your-
.
-proposed corrective actions, the NRC will determine whether further NRC enforcement..
action is' necessary to ensure compliance with NRC regulatory requirements.-
In.accordance with~Section 2.790 of the NRC's " Rules ~of Practice," Part 2,_
'
Title 10. Code of Federal Regulations, a copy of this letter and its enclosure
J.will be placed in the NRC Public Document Room..
Sincerely.
r
Original'aigned by:
^
Bobert D. Martin
Robert D. Martin
. Regional Administrator
LEnclosure:
' Notice of. Violation
.
Kansas'-Gas and Electric Company
.
ATTN: Gene P.~ Rathbun, Manager
of Licensing.
P. 0.-Box 208
Wichita, Kansas -67201
Forrest Rhodes, Plant. Superintendent
- Wolf Creek Generating Station
P. O. Box 309
-Burlington, Kansas
66839-
-Kansas Radiation Control Program Director
f
L
-
,,
. .
M
DISTRIBUTION
bec-'w/enb1:
PDR ~
SECY.
CA
'JMTaylor,.IE
RYo11mer, IE-
'
JAxelrad, IE-
JLieberran,-ELD
Entorcement' Officers
RI, RII, RIII, RY-
- LCobb, IE
FIngram, PA
7 Crooks, AE00-
BHayes, 01
-
SConnelly, OIA
DNussbaumer, OSP
IE:ES File
TIE:EA File
BSumers, IE (1tr hd).
RIV Distribution:
Regional Administrator, RMartin
Division Director
Branch Chief
DPowers
-Inspector (2. copies)
CWisner(1trhd)
RDoda
RIV Files
h C:RPSB S
'
RIV:RPS
C:RP
D:Dh
E0
RC
R
JECummi
gig -DMHuny/85
icutt
LEMartin--RPDenise DAPowers WLB
R
in
/0/gf/85
/0 /g5
%/y/85
A/j/85~ // //f/85 //h /85
/#//f /85
d:2
d, ._
R.$ p,ny2/T/85et avme,1it >
n
.r
.<
.,
.
12///85
12
/85
12/9 /85
If/v/85 32/p/85
'
., .,
'
.
f DESIGNATED ORIGINAD
(
x
,mbog ,, //$7sV?>h
- ~ -
WE /
/fI