Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141E553 + (01:23:29, 25 May 2025)
- ML20141E500 + (01:23:44, 25 May 2025)
- A000737, Renewed NPDES Permit LA0007374,issued to Louisiana Power & Light Co + (01:23:46, 25 May 2025)
- ML20141E420 + (01:24:11, 25 May 2025)
- ML20141E369 + (01:24:24, 25 May 2025)
- ML20141E341 + (01:24:39, 25 May 2025)
- ML20141E187 + (01:25:31, 25 May 2025)
- ML20141E125 + (01:25:52, 25 May 2025)
- ML20141E104 + (01:25:58, 25 May 2025)
- 05000335/LER-1985-012, :on 851219,during Shutdown for Scheduled Refueling Outage,Visual Exams & Functional Testing Identified Failed Snubbers.Caused by Installation/Maint Errors.Snubbers Replaced + (01:26:18, 25 May 2025)
- ML20141D909 + (01:26:54, 25 May 2025)
- ML20141D771 + (01:27:44, 25 May 2025)
- TAC:M95010 + (01:28:58, 25 May 2025)
- ML20141D478 + (01:29:03, 25 May 2025)
- IR 05000387/1996008 + (01:29:33, 25 May 2025)
- ML20141D038 + (01:30:53, 25 May 2025)
- ML20141C942 + (01:31:32, 25 May 2025)
- TAC:M92251 + (01:32:01, 25 May 2025)
- 05000254/LER-1986-006, :on 860122,reactor Bldg Ventilation Sys Isolation Occurred as Result of Spurious Trip of Reactor Bldg Ventilation Monitor 1B.Caused When Disconnected Signal Cable Resulted in Spike + (01:32:13, 25 May 2025)
- ML20141C800 + (01:32:15, 25 May 2025)
- 05000382/LER-1997-017, :on 970515,control Room Emergency Filtration Unit Common Mode Failed.Caused by Inadequate Design.Both Crefu Trains Declared Inoperable & TS 3.7.6.2 Was Entered & Emergency Work Authorization,Initiated + (01:32:25, 25 May 2025)
- ML20141C753 + (01:32:28, 25 May 2025)
- ML20141C750 + (01:32:30, 25 May 2025)
- ML20141C747 + (01:32:33, 25 May 2025)
- ML20141C743 + (01:32:34, 25 May 2025)
- ML20141C737 + (01:32:37, 25 May 2025)
- ML20141C710 + (01:32:46, 25 May 2025)
- 05000454/LER-1997-013-03, :on 970522,valve Mistakenly Opened & Caused post-LOCA Leakage to Exceed Limit.Cause Unknown.Licensee Identified Affected Sys & Procedures That Vent or Open Affected Sys + (01:32:47, 25 May 2025)
- 05000255/LER-1986-014, :on 860227,automatic Start of Both Emergency Diesel Generators Occurred.Caused by Personnel Error During Maint on auto-stop Oil Sys.Repair Group & Responsible Engineer Will Be Counseled on Occurrence + (01:32:52, 25 May 2025)
- 05000261/LER-1986-002-02, :on 860115,during Test Procedure,Turbine Trip/ Reactor Trip Occurred Due to High Level in Steam Generator A.Caused by Either Personnel Error or Equipment Malfunction. Loose Connection on Test Jack Corrected + (01:32:56, 25 May 2025)
- 05000423/LER-1986-020, :on 860301,RCS Loop 2 Hot Leg Injection Valve 3SIL*V932 Found danger-tagged Shut Instead of Locked Open as Required by Plant Operational Mode.Valve Reopened.Review of All danger-tag Restorations Conducted + (01:33:02, 25 May 2025)
- ML20141C643 + (01:33:16, 25 May 2025)
- ML20141C633 + (01:33:28, 25 May 2025)
- ML20141C626 + (01:33:31, 25 May 2025)
- ML20141C607 + (01:33:36, 25 May 2025)
- ML20141C584 + (01:33:42, 25 May 2025)
- TAC:M98187 + (01:33:51, 25 May 2025)
- 05000373/LER-1997-022, :on 970529,minimum Shift Manning Was Not Met. Caused by Ineffective Tracking of Active License Maintenance Requirements.Proper Criteria Applied to Proficiency Records from First Quarter 1997 + (01:33:58, 25 May 2025)
- 05000352/LER-1997-003, :on 970204,degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Caused by Failure to Include Periodic Cycling & Cleaning of Bdps.Addl Failures,Corrected + (01:34:00, 25 May 2025)
- ML20141C516 + (01:34:02, 25 May 2025)
- ML20141C513 + (01:34:04, 25 May 2025)
- ML20141C507 + (01:34:06, 25 May 2025)
- ML20141C503 + (01:34:08, 25 May 2025)
- ML20141C500 + (01:34:10, 25 May 2025)
- ML20141C495 + (01:34:12, 25 May 2025)
- 05000341/LER-1997-008, :on 970410,discovered Potential Common Mode Failure Mechanism for 480 Volt MCC Disconnect Switches Due to Not Being Fully Latched Due to Inadequate Maint.Cleaned & Lubricated Fused Disconnect Switches + (01:34:16, 25 May 2025)
- 05000461/LER-1997-014, :on 880426,MSIV Closure Time Testing Was Not Adequate,Due to Procedural Inadequacy.Revised DPS 9061.09 to Account for Full Valve Travel & Verified MSIV Operability Before Plant Start Up + (01:34:19, 25 May 2025)
- ML20141C477 + (01:34:20, 25 May 2025)
- 05000336/LER-1997-012-02, :on 970410,inadequate DG Start Surveillance Test Was Identified.Caused Because Personnel Was Unaware That Design of Circuitry for DG Ready to Load Annunciator Did Not Adequately Represent Engine Speed.Revised Sps + (01:34:29, 25 May 2025)
- 05000336/LER-1993-023-02, Forwards LER 93-023-02,documenting Event Occurred at Unit 2 on 930622.Commitments Made within Ltr Listed + (01:34:31, 25 May 2025)
- 05000254/LER-1997-020-01, :on 970519,B-train Control Room Ventilation Sys Became Inoperable When AHU Breaker Tripped When Performing Monthly Surveillance.Cause Could Not Be Determined.Circuitry Testing Completed + (01:34:38, 25 May 2025)