ML20141C584
| ML20141C584 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 05/01/1997 |
| From: | Edgar J SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| To: | Chotoo S NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| JBE:97:079, JBE:97:79, TAC-L30952, NUDOCS 9705190096 | |
| Download: ML20141C584 (13) | |
Text
_
1 SIEMENS ey #vAs2 e
'ay 1,1997
'JE:97:079 U.S. Nuclear Regulatory Commission Attn: Ms. S.D. Chotoo Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Washington, DC 20555
Dear Ms. Chotoo:
Ref.: Letter, JB Edgar to MF Weber, dated March 12,1997 With the referenced letter Siemens Power Corporation subrnitted a revised decommissioning cost estimate table (page 7-2 of the license application). It has been discovered that footnote 4 was inadvertently left off the table. Enclosed are six copies of page 7-1 and 7-2 to which footnote 4 has been added.
Very truly yours, i
J. B.Tdgar Staff Engineer, Licensing i
pg i
Enclosures J
i 100010 9705190096 970501 PDR ADOCK 07001257 C
g.
Siemens Power Corpor$ttion 2 Nuclear Division eup.2 SPECIAL NUOLEAR MATERIAL LICENSE NO. SNM-1227, NRC DOCKET NO. 70-1257 PART I-LICENSE CONDITIONS REv.
1 CHAPTER 7 DECOMMISSIONING 7.1 Decommissionina Plan i
A decommissioning plan has been prepared which meets the guidelines and requirements as specified in " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for By-Product, Source or Special Nuclear Material," U.S. Nuclear Regulatory Commission, April,1993. The disposition of uncontaminated equipment and facilities is not within the scope of this plan, provided that such facilities are verified to be uncontaminated in accordance with approved radiation survey procedures, and are therefore not addressed further.
I I
The residual contamination levels in decontaminated facilities to be unconditionally l
I released shall be within the values given in the guidelines mentioned above. Any equipment or facility which cannot be decontaminated to those levels shall be i
transferred to another Heensed facility or demolished, packaged and disposed of at a l
licensed low-level radioactive waste disposal site.
l The decommissioning plan is described in more detail in a document entitled, i
"Siemens Power Corporation, Decommissioning Funding Plan," August,1994, (DFP).
Prior to the start of deco';tamination, a detailed decommissioning plan, including a proposed closeout survey plan, will be submitted to the NRC for approval. The closeout survey shall be approved by the NRC prior to release of equipment or grounds to unrestricted use.
l l
7.2 Decommissionina Cost Estimate An updated decommissioning cost estimate has been made in 1997 dollars using the !
documented decommissioning plan as a basis. The cost estimate summary is in Table l
l-7.1. Further cost estimate review schedules are discussed in the DFP.
l 7.3 Decommissionina Fundina Plan SPC is using a parent compcay guarantee to provide assurance that sufficient funding will be available for plant decommissioning.
I AMENDMENT APPLCATON DATE:
PAGE NO.:
j March 12,1997 7-1 sPC ND.3330 947 (R-vo792)
.=.....
CO @
Fn TE z
E m
g O-e 3
bS z
e
~
c T h
A' 1997 U.S. DOLLAfts ORIGINAL COST IEVISED COST NOTE O
E m CD 6
g Pinnning. Admini.iretion, and emi ct management 5s0.300 580,300
~
xO Uo, aumeng 4.275,000 5,i S4.600 i
gO
>7 Dry Conversion BuBding 1.953.175 HU m ji; M Fuels Bumeno 1,180.200 1.331,700 1
3 C+.
E:
>o N
LUR/SPF BuikBng 254,500 I U
~
x cc a
Ancigary Facilities 934,600 839,600 1
H OZ e
mc k
Containemed Somd Waste 3,400,000 1,099,000 2
2g --
m su tagoon Closure Plan 7,739,200 9.127,?00 3
7m Lagoon Weste Inventory Processing 2,914,000 1,225,000 4
(TI
-oO en g
O CD --
-Subtotal 21.023.300 21,265,175 O
z E-z go Contingency 5,976,700 5,316,300 E
i d
to TOTAL ESTIMATED COST 27,000.000 26,581,475 1.
Adjusted for reduction in volume and increase in burial cost for contamensted egiapment.
2 33 2.
flemoved cost of solid waste already buried.
O O
h 3.
Adjusted for increase in burial cost for lagoon solids af ter liners have been removed.
O O
O P
4.
Removed completed capitalinvestment in LUR-SPF building e
5 o
z 5
N
~
o k
n
- 6 9
ei i'
ro m m e
a Nr.
a" 71
l
\\
~
SiemenS Powcr Corporation Nuclear Division eup.2 SPECIAL NUCLEAR MATERIAL LICENSE NO. SNM-1227, NRC DOCKET NO. 701257 PARTI-LICENSE CONDITIONS REV.
i L
CHAPTER 7 DECOMMISSIONING 7.1 DagemminalatkutPlan A decommissioning plan has been prepared which meets the guidelines and requirements as specified in " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for By-Product, Source or Special Nue:sar Material," U.S. Nuclear Regulatory Commission, l l
April,1993. The disposition of uncontaminated equipment and facilities is not within the scope of this plan, provided that such facilities are verified to be uncontaminated !
in accordance with approved radiation survey procedures, and arc therefore not addressed further.
i The residual contamination levels in decontamir.ated facilities to be unconditionally
' released shall be within the values given in the guidelines mentioned above. Any equipment or facility which cannot be decontaminated to those levels shall be
' transferred to another licensed facility or demolished, packaged and disposed of at a l
licensed low level radioactive waste disposal site.
The decommissioning plan is described in more detail in a document entitled, "Siemens Power Corporation, Cecommissioning Funding Plan," August,1994, (DFP).
u a
j Pnor to the start of decontamination, a detailed decommissioning plan, including a proposed closeout survey. plan, will be submitted.to the NRC for approval. The l
closeout survey shall be approvod by the NRC prior to release of equipment or grounds to unrestricted use.
i 7.2 Decommissionina Cost Estimate l An updated decommissioning cost estimate has been made in 1997 dollars using the documented decommissioning plan as a basis. The cost estimate summary is in Table i 17.1. Further cost estimate review schedules are discessed in the DFP.
7.3 Decommissionina Funding Plan SPC is using a parent company guarantee to provide assurance that sufficient funding will be available for plant decommissioning.
f I
j ARGNOMENT APPLCATION DATE:
PAGE NO.:
March 12,1997 7-1 sPC-ND.3330 947 (R-UO7S2)
I l
i I
(?) MI s
'U 5' m
~
O3-
- =
-e M 3 M
l e
Em j
iserv.s.oo w ns -
omonalcost Revisso cost man ~
p$
E ii.l Planning. * ^ _. _ _ __ _ _ end Prefect Menessment 500.300 580.300
) '-
me u0,musere 4.275.000 5.iS4.e00 1
Ory Conversion Sidere 1.653.175 Speddtv Fuels Bugene E
1.100.200 1.331.700 t
E Cf. '
l N
LURISPF SuRena
>o 254.500 I3
~a AncBery FacBelas 934.000 839.000 1
d OZ i
r.
4 g
7 mc s
conwneriend seed weses 3.400.000 1.0es.030 2
t y g. -
O O
Lessen Cleeure Plan 7.739.200 9.127.300 3
mm
(
m I m Weste Ireventerv 7 2.914.000 1.225.000 4
m
.o --O m
t g
O m y' l
Sedpeetd 21.023.300 21,265.175 z -.
gO r
Cenehmerav 5.976.700 5.316.300 E
1.a h
d w
t TOTAL EstatATED COST 27.000,000 26,581,475 i.
rseed.e,.ed.cdor, w eens,.e er.o some i,. sw.ost.e,-.r,*, seed -
z D
2.
Removed cost of seed weses sheedy Inuned.
O 5
f
- 3. Agusted for incrosse ire buriel cost 9er lessen soEdo steer liners have been removed.
k 4.
Removed conquiseed capital investment ira LUR-SPF tsuildng A
e m
?
-4 5
z o
l s
m 9
e w
=F N
(
h 08 m N C
!?
- 71 E
e i
to
?
[5
[
Siernens Powcr Corporation u Nuclear Division sup.2 SPECIAL NUCLEAR MATERIAL LICENSE NO. SNM 1227, NRC DOCKET NO. 701257 PART I-LICENSE CONDITIONS
- nev, CHAPTER 7 DECOMMISSIONING t
7.1 Decommissionina Plan A decommissioning plan has been prepared which meets the guidelines and requirements as specified in " Guidelines for Decontamination of Facilities and,
i' Equipment Prior to Release for Unrestricted Use or Termination of Licenses for i
By-Product, Source or Special Nuclear Material," U.S. Nuclear Regulatory Commission, e
April,1993. The disposition of uncontaminated equipment and facilities is not within l l
the scope of this plan, provided that such facilities are verified to be uncontaminated i j
in accordanco with approved radiation survey procedures, and are therefore not i
addressed further.
The residual contamination levels in decontaminated facilities to be unconditionally released sha!! be within the values given in tne guidelines mentioned above. Any equipment or facility which cannot be decontaminated to those levels shall be transferred to another licensed facility or demolished, packaged and disposed of at a licensed low-level radioactive waste disposal site.
The decommissioning plan is described in more detail in a document entitled, i
"Siemens Power Corporation, Decommissioning Funding Plan," August,1994, (DFP).
Prior to the start of decontamination, a detailed decommissioning plan, including a proposed closecut survey plan, will be submitted to the NRC for approval. The closeout survey shall be approved by the NRC prior to release of equipment or grounds to unrestricted use, a
7.2 Decomm;es;orJnc Cost Estimate 1
I An updated decommissioning cot t estimate has been made in 1997 dollars using the I documented decommissioning plan as a basis. The cost estimate summary is in Table l-7.1. Further ct,st estimate review schedules are discussed in the DFP.
~
7.3 Decommissionina Fundina Plan SPC is using a parent company guarantee to provide assurance that sufficient funding will be available for plant decommissioning.
I i
AMENOMENT APPLCATON DATE:
PAGE NO.:
March 12,1997 7-1 sPc ND.3330 947 (R-1107$2)
..... ~ ~ + - -..
I l
E l
E CD COE
.l 03 m
5
-e
>3 g
Im g
zCh j
1997 U.S. DOLLARS OfuGutAL COST REVtBED COST 800TE '
O g
g g me i
Planrene, Administratirm. and Project ""
580,300 580,300 M
23 O t
Oo, summa 4,275,000 5,154.800 1
go j
>p Dry Corwereien BuAens 1.653,175
-i Specialty Fuste Busens E'
1.180.200 1,331,700 1
E Cf.
N LUfUSPF Sutese 254,500 I>0
'5 C'
A m mary reesmoe 934 e00 839,e00 i
_8 OZ g
mC N
Containerired SoEd Weste 3,400,000 1,099,000 2
Lagoon fissure PW 7,739,200 9.127,300 3
m.
y 7m Leocon waste inventory,_
2,914,000 1,225,000 4
m
.O O m
O Cn --
Suenotes 21.023,300 21,265,175 O
Z E-z go Contineancy 5,976,700 5,316,300
_O
,,,, U d
to TOTAL ESTIMATED COST 27,000,000 26.581,475 O
y 1.
uiusted
- t,- and ineresse i,uris. cost, cor,ter.or,eted -
z 23 i
2.
Removed cost of soud weste already tsuried.
O w
O g
3.
Adiusted fw incrosse in burW cost for lagoon soEdo aftw Enen have tason removed, h
4.
Removed completed capitalinvestment in LUR-SPF bu5 ding X
m o
d 5"
2 o
9s U
o.
e
~._.
A Q
oi m 2
?
N E
.n
.m
=.. -
' + - < - - - - -
a-
Siemens Power Corporhtion - Nuclear Division sur.2 sPECIAL NUCLEAR MATERIAL LICENSE NO. SNM-1227, NRC DOCKET NO. 70-1257..
PARTI-LICENSE CONDITIONS
- nev, i
t CHAPTER 7 DECOMMISSIONING 7.1 Decommissionina Plart A decommissioning plan ~ has been prepared which meets the guidelines and requirements as specified in " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for i By Product, Source or Special Nucisar Material," U.S. Nuclear Regulatory Commission, {
April,1993. The disposition of uncontaminated equipment and facilities is not within the scope of this plan, provided that such facilities are verified to be uncontaminated I
in accordance with approved radiation survey procedures, and are therefore not ~
addressed further.
The residuct contamination levels in decontaminated facilities to be unconditiorfily released shall be within the values given in the guidelines mentioned above 51y equipment or facility which cannot be decontaminated to those levels shall be transferred to another licensed facility or demolished, packaged and disposed of at a licensed low-level radioactive waste disposal site.
I The decommissioning plan is described in more detail in a document entitled, "Siemens Power Corporation, Decommissioning Funding Plan," August,1994, (DFP). :
Prior to the start of decontamination, a detailed decommissioning plan, including a proposed closeout survey plan,. will be submitted to the NRC for approval. The closeout survey shall be approved by the NRC prior to release of equipment or grounds to unrestricted use.
7.2 Decommissioning Cost Estimate An updated decommissioning cost estimate has been made in 1997 dollars using the
! documented decommissioning plan as a basis. The cost estimate summary is in Table
- l 7.1. Further cost estimate review schedules are discussed in the DFP.
7.3 Decommissioning Fundina Plan i
SPC is using a parent company guarantee to provide assurance that sufficient funding will be available for plant decommissioning.
J j
AMENOMENT APPLCATION DATE:
PAGE NOJ March 12,1997 71 sPC ND:3330 947 (R-1/07'92) i
. ~.
Cn 0) i T' a s.
83
-e
-> a 7
I in 9
Z T
h 1997 U.S. 00t1ARS OfuGWe4L COST fEVISED COST IWOTE ' '
O C
yg Mennes,"^
_ _ _ _, and Project L _ _.a 580,300 580,300 me
~
)O 33 UO, BuBdne 4,275.000 5.154,000 1
gO Ory Conversion Sumens 1,653.175
- E Speciafty Fuele Outens E
1.180,200 1.331.700 1
~
3 1::*.
N LUfVSrY Sdens
>O
~m 254,500 IU r-.
Anedtery Feetties a
93d.000 839.000 1
d b2 g
s Conesinenrod send ww 7
mc 3.400.000 i.099,000 2
t ZOg Lenoon Oneure Plan 7,739.200 9.127,300 3
k Lesoon Weste hvensory Proceeeme 2,914,000 1.225,000 4
m*
OOq-sutnotes O
(n --
21.023.300 21.2ss.175 O
Z E-Conhneancy z
gO 5.976,700 5,316,300
_O y,,
3 TOTAL ESTIMATED COST d
to 27,000,009 26.581,475 O
fy 1.
A4usted for reduction in volume and increase in buriel cost for contenunated equgwnent.
2 3) 2.
Memoved cost of so5d weste already buried.
O f
O 3.
Aqueted for kneweses in buriel cost for lagoon solido efter Eners have been removed.
h 4.
Rernoved completed capital investment in LUR-SPF building E
8 5
Zo N
P N
n CD (T1 M
2 Nr s
?
i m
w m
m.
SiemenS Power Corporation. Nuclear Division sup.2 SPECIAL NUCLEAR MATERIAL LICENSE NO. SNM 1227, NRC DOCKET NO. 701257
' PART I-LICENSE CONDITIONS nev.
l CHAPTER 7 DECOMMISSIONING 7.1 Decommissionina MAD i
A decommissioning. plan has been prepared which - meets the guidelines and
)
requirements as specified in " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for l
By-Product, Source or Special Nuclear Material," U.S. Nuclear Regulatory Commission, l
April,1993. The disposition of uncontaminated equipment and facilities is no'. within i
the scme of this plan, provided that such facilities are verified to be uncontsminated i
in accordance with approved radiation survey procedures, and are therefore not addressed further.
i t
i i
The residual contamination levels in decontaminated facilities to be unconditionally released shall be within the values given in the guidelines mentioned above. Any equipment or facility which cannot be decontaminated to those levels shall be i
transferred to another licensed facility or demolished, packaged and disposed of at a licensed low-level radioactive waste disposal site.
The decommissioning plan is described in more detail in a document entitled, j
"Siemens Power Corporation, Decommissioning Funding Plan," August,1994, (DFP).
1 1 -
Prior to the start of decontaminaticn, a detailed decommissioning plan, including a j
proposed closeout survey plan, will be submitted to the NRC for approval. The closeout survey shall be approved by the NRC prior to release of equipment or l
grounds to unrestricted use.
i 7.2 '
Decommissionina Cost Estimate
~
I An updated decommissioning cost estimate has been made in 1997 dollars using the l documented decommissioning plan as a basis. The cost estimate summary is in Table l l 7.1. Further cost estimate review schedules are discussed in the DFP.
I 7.3 Decommissionina Fundina Plan SPC is using a parent company guarantee to provide assurance that sufficient funding will be available for plant decommissioning.
I l
AMENOMENT APPLICATION DATE:
PAGE NO.:
March 12,1997 7-1 sPC-NO3330.947 (R 1/0742) i
-w
-n, y+
3e----
,7-m w
~
I CO M 15' mO3 5
-e j
>p r
m e
j Em isw v.s. ocuans amusent cost wwsso cost
" now 0$
E me f4 Plannine. " ^. - ___ _ _ _ and Project 1"_
500.300 500.300
~
>O m
i uo.mmana 4.27s. coo s.is4.eoo i
go
> 'O Dry Converslen euesne 1.6s3.175 O
seecissivFusse eunens
- t. iso.aco 1.331.700 t
2 cr.
ID E
t W
tunnu,eme.
>o B'
r3 m
rs4.soo h
Anemory Facatine 934.600 839.000 1
d O2 r,
g mC N
cenisinerteed send wesse 3.400.000 1.09s.000 2
r-yO
- e swe,,or,
,.,,.. o
,,,.,00 m
mn c
tessen wenn irwenier, evecesen.
2.s 4.000 i.22s.ooo 4
m
-OO g-g (n -.
sueeoies 21.023.300 21.2es.17s O
Z"-
Z gO-cannne new s.s7s.7eo s.31a.300 9
'a 3 d
M TOTAt ESTIMATED COST 27.000,000 26.s81.47s
+
- i. A eed ie, n
e so.* crees no,in
.or eenie e
l g
- 2. nornewed eest et seed wesee steady buried.
O l
j O
3.
Agueted #er incrosse in twies cosi ser esseen sonde one eners he been verne.es Q
4.
ner d.or,ie ed es,..
eniin tu ser %
x g
m n.
-1 5
Z i
O
$ ?
b e
-e s
P U1 m 3
M N K i
or 73 to i
j f
c
[
SiemenS Power Corporation --Nuclear Division sw.2 i
l 5PECIAL NUCLEAR MATERIAL LICENSE NO. SNM-1227, NRC DOCKET NO. 70-1257 i
F PARTI-LICENSE CONDITIONS REV.
CHAPTER 7 DECOMMISSIONING 9
7.1 Decommisalonina Plan A decommissioning plan has been prepared which meets the guidelines and requirements as specified in " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for I
^
By-Product, Source or Special Nuclear Material," U.S. Nuclear Regulatory Commission, April,1993. The disposition of uncontaminated equipment and facilities is not within l
the scope of this plan, provided that such facilities are verified to be uncontaminated j
i in accordance with approved radiation survey procedures, and are therefore not j
addressed further.
)
The residual contamination levels in decontaminated facilities to be unconditionally
- ^
released shall be within the values given in the guidelines mentioned above. Any
]
i equipment or facility which cannot be' decontaminated to those levels shall be
{_
transferred to another licensed facility or demolished, packaged and disposed of at a t
licensed low level radioactive waste disposal site.
The decommissioning plan is described in more detail in a document entitled, "Siemens Power Corporation, Decommissioning Funding Plan," August,1994, (DFPl.
].
Prior to the start of decontamination, a detailed decommissioning plan, including a proposed closeout survey-plan, will be submitted to the NRC for approval. The closeout survey shall be approved by the NRC prior to release _ of equipment or grounds to unrestricted use.
1 7.2 Decommissioning Cost Estimate r
i An updated decommissioning cost estimate has been made in 1997 dollars using the j
documented decommissioning plan as a basis. The cost estimate summary is in Table j I 7.1. Further cost estimate review schedules are discussed in the DFP.
- 7.3 Decommissionina Fundino Plan SPC is using a parent company guarantee to provide assurance that sufficient funding 1
l.
will be available for plant decommissioning.
)-
i 1
)
)
l 1
AMENOMENT APPLICATION DATE:
PAGE NO,:
March 12,1997 7-1 sPC ND.3330.947 (R iio792)
e s
O-Cg3O m 2(e' OO VObC0U. 2c -
m Oq fo 3
f.
O%h DCmmO~>I E hm>x g>1 2_.>I r m O. CZgf. My OO D
a.
i zo69 -Q
$d7
}mmOOZ9jO 22'
'E TO 1
1 2
3 4
S I
T S
0 5
0 0
0 0
5 0
5 O
0 0
7 0
0 0
0 0
0 0
7 7
C 0
8, 1
D 3,
7, 0
0 1
4 3
5, 6,
0, 3,
0, 1,
3 4,
5 1
9 7
5 6
E 0
5 5
3 4
9 9
2 2
1 6
8 S
8 3,
5 3
V 5
1, 6.
1 1
2 8
0 1
2, 2,
3, 5,
I 5
1 E
1 9
1 5
6 2
2 H
tne mp d
iu e
T q
v S
e o
m O
0 0
0 0
0 0
C 0
0 0
0 0
0 0
0 0
0 d
0 0
e e
r 0
t A
3, 0
2 0
5 0
6 0,
2, 0
3, 7,
0, n
e 0
a n
L 3
0 9
4 6
e e
0 7
8 4
0 3
1 7
0 im b
2 u
8 3
G 5
2 1,
9 4,
7 9
0 9,
0, a
e t
O c
h 4
1 1
7 n
v IR 3
7 2
5 2
2 o
a r
s o
r f
e s
in t
l n
.~
g o
r i
c e
d t
f l
f i
e iu e
r b
u s
d F
b i
P l
n o
i s
e R
s n
U a
d o
e o
L r
ie p
n c
r n
u e
i b
l i
t r
n d
y o
e r
n d
m f
B e
e t
t t
s t
U c
e e
o s
~
b e
e o
m a
U c
v so m
u n
r e
l e
la i
LO c
s o
t i
l r
s e
v s
u a
D.
m c
e t
o n
b ip e
P T
i w
S.
n a
r n
d i
c U
r e
W C
u f
s y
S o
u s
t u
s e
r i
t o
e O
7 n
o c
s e
9 e
s a
n 9
t n
n r
d a
e D
d o
c b
t i
f.
u u
e u
l 1
e n
G B
e n
o P
w E
r s
T r
A o
o e
e S
e Ir n
e r
i f
c e
d S
o t
f i
r e
M
=
d u
t s
b c
s is u
u a
o s
s y
I d
d d
d n
r o
e c
T e
e r
e e
e e
F S
F n
l t
v t
v V
y e
C W
n S
s o
s o
v y
e t
n t
t r
s e
E u
m u
r u
o ic
/
t L
d e
4 m m
n n
e s
j fa o
B, C
S e
W e
o e
n e
A A
H A
Re t
o n
i t
O y
e R
c n
m s
o n
T p
U n
o r
i a
e u
o O
r U
D S
L A
C f
L s
C T
1 2
3 4.
}
z4 gnh ga" ff Ek,_'agN se m65N;- h3"