ML20141C495
From kanterella
Jump to navigation
Jump to search
ML20141C495 | |
Person / Time | |
---|---|
Site: | 07001113, 07000036, 07001007, Framatome ANP Richland, 07000135 |
Issue date: | 09/19/1974 |
From: | Macdonald C US ATOMIC ENERGY COMMISSION (AEC) |
To: | Reitler E NUCLEAR MATERIALS & EQUIPMENT CORP. (NUMEC) |
References | |
NUDOCS 8512230399 | |
Download: ML20141C495 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P0971999-10-20020 October 1999
[Table view]Forwards Combustion Engineering Third Sample Event Rept in Conjunction with Hdrogeologic Investigation & Ground-Water, Soil & Stream Characterization, as Requested ML20217M1451999-10-19019 October 1999 Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl ML20217H0391999-10-15015 October 1999 Forwards Final Status Survey Rept for Northwest CaF2 Storage, Dtd Oct 1999 in Support of Request for NRC Approval for Unrestricted Release of Northwest CaF2 Storage Area.Attachment 1 Is Description of Revs Showing Changes ML20217J8171999-10-14014 October 1999 Responds to NRC GL-98-03,completing Portion Which Applies to Safety & Process Control Activities of Y2K Readiness Program to Assure That Computer Sys Will Not Prevent or Degrade Safety Function of Structure,Sys or Component ML20217E0261999-10-14014 October 1999 Requests NRC Consent to Transfer of Ownership & Control of Wilmington Fuel Fabrication Facility License SNM-1097 & Related Certificates & Approvals,As Result of Joint Venture Being Formed by Ge,Hitachi,Ltd & Toshiba Corp ML20217B7511999-10-11011 October 1999 Forwards Siemens Power Corp Responses to RAI in Ltr RA99-138, Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-9909301999-10-0808 October 1999 Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 ML20217N1601999-10-0808 October 1999 Forwards Amend 11 to License SNM-1097,including Rev 5 to Physical Security Plan, Dtd Aug 1999.Safeguards Evaluation Rept,Encl ML20217C7671999-10-0606 October 1999 Forwards Proprietary Rev 32 EMF-12(P), Nuclear Matls Safeguards Procedures Description for Fuels Fabrication Plants, Replacing Chapters 2 & 3 of Rev 32,dtd Jul 1999. Proprietary Info Withheld,Per 10CFR2.790(d) ML20217C5651999-10-0404 October 1999 Requests Addl Info Needed Before Action Can Be Taken on Siemens Application for Amend to License SNM-1227 to Authorize Activities with SNM in Fuel Services Bldg.Info Specified in Encl Should Be Provided within 10 Days of Ltr ML20216J5381999-09-30030 September 1999 Forwards RAI Per 990721 Application Requesting Amend to License SNM-1227 to Add Process Waste Storage Area Consisting of Four Tanks & Ion Exchange Column to Ammonia Recovery Facility as Part of Wastewater Treatment Process ML20212J0161999-09-29029 September 1999 Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted ML20212G3631999-09-21021 September 1999 Forwards Two Sheets from R Burklin Dose Calculations for Heather & Julie ML20216E7441999-09-13013 September 1999 Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds ML20212A8951999-09-10010 September 1999 Forwards Proprietary Updated Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance for Abb Combusting Engineering Nuclear Power, Inc,Hematite Facility,Per 10CFR73.67.Plan Withheld ML20212A1921999-09-10010 September 1999 Submits follow-up to NRC Operations Center Rept 36030 Re Bulletin 91-001 Rept on over-batching of Waste Drums Due to Inaccurate Determinations of U Contents ML20211P0351999-09-0909 September 1999 Forwards Rev to Criticality Safety Program Requirements in Chapter 6.0 & Table 6.0 of Consolidated Application, Currently Rev 2.Attachment 1 Provides Description of Changes by Section & Page ML20216F1211999-09-0808 September 1999 Forwards Insp Rept 70-1113/99-05 on 990809-13.No Violations Noted ML20217B5621999-09-0202 September 1999 Ack Receipt of 990806 Application for Amend to License SNM-1227.Acceptance Review Completed & Identified No Administrative Omissions or Deficiencies.Formal Review Anticipated Completion Date of Dec 1999 ML20211L2821999-08-31031 August 1999 Forwards Insp Rept 70-1113/99-04 on 990726-0805.No Violation Noted ML20212G1281999-08-31031 August 1999 Informs That Corporation Is Expected to Produce Approx 40,000 Gallons of Ammonium hydroxide-ammonium Nitrate Solution Per Week.Unsold Solution Will Be Processed Through Arf for Recovery of Ammonia & Then Be Sent to Sewer ML20211H8861999-08-31031 August 1999 Repts That Work on All Computer Sys Required to Be Y2K Compliant IAW GL 98-03 Has Been Completed ML20211G1681999-08-26026 August 1999 Ack Receipt of Transmitting Application for Amend to License SNM-1227 Re Addition to Ammonium Recovery Facility.Acceptance Review Has Identified No Administrative Errors of Omissions RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl1999-08-25025 August 1999 Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl ML20211F2491999-08-25025 August 1999 Forwards Insp Rept 70-1113/99-202 on 990802-06.No Violations or Deviations Noted ML20211F5791999-08-25025 August 1999 Forwards Insp Rept 70-1257/99-201 on 990802-05.No Violation Noted.Proprietary Document Enclosed ML20211B4291999-08-19019 August 1999 Forwards Amend 28 to License SNM-33,changing Name of Licensee to Abb Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl ML20211D7611999-08-19019 August 1999 Discusses 990806 Meeting Conducted at General Electric Facility Re NRC Evaluation of Performance in Five Major Areas of Safety Operations,Safeguards,Radiological Controls, Facility Support & Licensing Activities.With Encl ML20211B3971999-08-19019 August 1999 Forwards Amend 10 to License SNM-1097,incorporating Changes to Respiratory Protection Program & Modifying Safety Condition S-1 to Include Date of 990806.SER,which Includes Categorical Exclusion Determination Also Encl ML20211B9101999-08-19019 August 1999 Forwards Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted ML20210V0971999-08-18018 August 1999 Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning RA99-129, Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal1999-08-13013 August 1999 Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal RA99-082, Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same1999-08-13013 August 1999 Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same ML20210V1911999-08-13013 August 1999 Forwards Insp Rept 70-1113/99-03 on 990712-16.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records & Interviews with Personnel ML20210R7271999-08-13013 August 1999 Requests Withholding of Listed Proprietary Documents Containing Info Given to a Gooden During Insp 70-1113/99-05 at Facility.Proprietary Encls Withheld ML20211A3701999-08-12012 August 1999 Refers to ,Which Transmitted Rev 5 to Physical Security Plan.Rev Acceptable for Inclusion Into Plan ML20210R8961999-08-12012 August 1999 Forwards Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representatives Records,Interviews with Personnel & Observation of Activities in Progress ML20210Q3781999-08-11011 August 1999 Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted ML20210U0561999-08-11011 August 1999 Responds to 990714 Correspondence,By Which Siemens Sent Revised Page Change to Table I-1.1, Authorized Activities. Since NRC Had Previously Authorized Activity Stated,Change to Application Is Administrative & No Action Is Required ML20210T4811999-08-11011 August 1999 Informs That NRC Has Completed Acceptance Review of Application for Amend to License SNM-1227 & Have Identified No Administrative Omissions or Deficiencies.Nrc Anticipates Completing Formal Review by End of Oct 1999 ML20210L6481999-08-0505 August 1999 Forwards Proprietary Rev 5 to GE Nuclear Energy Physical Security Plan, for Fuel Fabrication Facility in Wilmington, Nc.Proprietary Plan Withheld RA99-120, Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-331999-07-29029 July 1999 Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 ML20210G0681999-07-28028 July 1999 Concludes That Proposed Additions to Chapter 15 of License Application Submitted by Listed Ltrs Demonstrate Applicant Adherence to Conditions in Part I of License Application & That No Amend to License Necessary ML20210E9551999-07-26026 July 1999 Forwards Amend 17 to License SNM-1227,allowing Storage of Moderated Uranium Compounds in sea-land Containers.Safety Condition S-1 Has Also Been Revised to Include Date of 990527.Safety Evaluation Rept,Encl ML20210F1791999-07-23023 July 1999 Forwards Proprietary Rev 32 to EMF-12(P), Nuclear Matls Safeguards Procedures Description for Fuel Fabrication Plants, Replacing All Sections of Existing Plan.Proprietary Encl Withheld ML20216D4351999-07-21021 July 1999 Provides Description of Modifications That Will Be Made to Ammonia Recovery Facility.Wastewater Flowsheet Encl ML20209H5361999-07-15015 July 1999 Ack Receipt of 990519 Application for Amend to License SNM-1227 Re Sale of Ammonium Nitrate/Ammonium Hydroxide Solution Fertilizer.Initial Review of Application Has Identified No Administrative Omissions or Deficiencies ML20209J4461999-07-13013 July 1999 Ack Receipt of Application for Amend of Matls License SNM-1097,transmitted by .Anticipates Completion of Review by 990830 ML20209G2561999-07-12012 July 1999 Informs That Staff Has No Comments on Siemens Power Corp Ammonium Recovery Facility - Sepa Determination of non-significance in Response to ML20209D8121999-07-0606 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-1257/99-01. Corrective Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved 1999-09-09 Category:NRC TO VENDOR/MANUFACTURER MONTHYEARML20059N5871990-10-11011 October 1990
[Table view]Informs That Changes Made to Sections 3.3.3,3.4.2,3.4.5,Rev 3 & Sections 3.5 & 4.5.3,Rev 1 to Fundamental Nuclear Control Plan,Per ,Acceptable ML20059N3371990-09-28028 September 1990 Forwards Insp Rept 70-1113/90-08 on 900827-31.No Violations or Deviations Noted ML20059M5761990-09-24024 September 1990 Forwards Safety Insp Rept 70-0036/90-04 on 900905-07.No Violations,Deficiencies or Deviations Noted ML20059L4301990-09-17017 September 1990 Responds to Re Revised Pages for Hematite Nuclear Fuel Mtg Facility Fnmcp.Rev to License Condition 1.1 to Safeguards Amend SG-1 to License SNM-33 Being Issued ML20059H6601990-09-17017 September 1990 Advises That U Recovery from Lagoon Sludge Rept,Marked Proprietary Will Be Withheld from Public Disclosure,Per 900802 Request ML20059H9621990-09-0707 September 1990 Forwards Partially Withheld Insp Rept 70-1257/90-201 on 900806-10.No Violations,Deviations or Declining Performance Identified ML20059G8941990-08-31031 August 1990 Forwards Insp Rept 70-1257/90-03 on 900813-17.No Violations or Deviations Noted ML20059F6501990-08-27027 August 1990 Advises That 900820 Request for Petition for Reconsideration of Denial of Specific Exemption from Financial Assurance Instrument Requirements of 10CFR50 & 70 Under Review.Request for Temporary Extension of 900831 Filing Deadline Granted ML20058M5881990-08-0909 August 1990 Ack Receipt of Re B&W Continuing Assurance to Pay for Eventual Decommissioning of NRC Licensed Facilities ML20058M6691990-08-0101 August 1990 Confirms 900727 Telcon Re Upcoming Emergency Response Exercise at Facility.Emergency Response Exercise Will Be Held on Morning of 900906 W/Afternoon Critique Session ML20055J4591990-07-31031 July 1990 Responds to Request for Specific Exemptions from Financial Assurance Instrument Requirements of Parts 50 & 70 of Amended Decommissioning Rule.Ge Needs to Provide Mechanism Segregated from Licensee Corp Assets ML20055H8031990-07-25025 July 1990 Advises That 900615 Rev 2 to Sections 3.3.2,3.3.3,3.4.2 & 3.4.4 of Fnmc Plan Acceptable.Plan Withheld (Ref 10CFR2.790(d)) ML20055G4961990-07-0909 July 1990 Grants Request to Delay Submission of Response to Insp Rept 70-0036/90-02 Until 900806,per to Dj Sreniawski ML20055H4011990-07-0606 July 1990 Confirms Arrangements for 900711 Mgt Meeting at Facility Re Status of Radiation Safety & Nuclear Criticality Safety Programs.Proposed Meeting Agenda Encl ML20055E0511990-07-0505 July 1990 Forwards Request for Addl Info Re Groundwater Monitoring Plan,Submitted by .Response Requested within 45 Days of Receipt of Ltr ML20055D8271990-07-0303 July 1990 Issues Temporary License Condition to Amend SG-2 to License SNM-1227,revising Paragraph 5.10,Pages 5-5 of Fnmcp,Per 900418 Request ML20055D1821990-06-29029 June 1990 Responds to Requesting Exemptions from Financial Assurance Mechanism Requirements in 10CFR50 & 70.Request for Time Extension to 900727 Granted ML20055D7741990-04-19019 April 1990 Forwards Insp Rept 70-1113/90-201 on 900319-22.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20248H7991989-10-0202 October 1989 Forwards Transcript of 890824 Meeting in Hillsboro,Mo to Provide Info to General Public Re Expansion at Hematite. Transcript Is draft,final,marked-up Copy ML20247M9301989-09-13013 September 1989 Confirms 890912 Telcon Re 890919 Meeting in Glen Ellyn,Il Re Findings Associated W/Release of U During 890825-29 Operating Period & Util Proposed Corrective Actions to Be Taken Prior to Restarting U Conversion Process ML20247J1081989-09-12012 September 1989 Submits Info Re Financial Assurance Mechanisms Required for Decommissioning,Per 890401 Application for Amend.Commitment Will Not Satisfy Requirements of Regulation.Three Categories of Financial Assurance Mechanisms Available to Licensee ML20247J2491989-09-11011 September 1989 Requests Addl Info Re Application for Amend to License SNM-1227 within 45 Days of Ltr Date ML20247B5451989-08-28028 August 1989 Grants Request for 45-day Extension to Prepare Response to Violations Noted in Insp Rept 70-1113/89-05.Response Due on 891010 ML20246P1761989-08-24024 August 1989 Summarizes 890801 Mgt Meeting Re Activities Authorized by License SNM-1097.List of Attendees Encl ML20246F3091989-08-22022 August 1989 Confirms Plans for 890824 Meeting W/Licensee to Review Concerns of Jefferson County Citizens & Elected Officials Re Planned Expansion of Combustion Engineering,Inc Hematite Facility ML20246A3421989-08-15015 August 1989 Forwards Safeguards Insp Rept 70-0036/89-202 on 890724-28.No Violations,Deviations or Declining Performance Noted ML20246A6311989-08-11011 August 1989 Returns Fee Accompanying 890728 Application for Amend to License SNM-1097.Amend to License Not Required ML20245J2071989-08-11011 August 1989 Forwards Amend 4 to License SNM-1227,revising Conditions 6-9 to Reflect New Possession Limits & Date of Revised Radiological Contingency Plan.Safety Evaluation & Categorical Exclusion Encl ML20246C0571989-08-10010 August 1989 Forwards Insp Rept 70-1113/89-10 on 890718-19.Violations Noted But Not Cited ML20245G9861989-08-0909 August 1989 Forwards Matl Control & Accounting Safeguards Insp Rept 70-0036/89-201 on 890710-14.No Violations,Deviations or Declining Performance Identified ML20245G3991989-08-0909 August 1989 Ack Receipt of 890728 Submittal of Revised Pages Re Organizational Changes,For Insertion Into Part II of License Renewal Application ML20245H0651989-08-0909 August 1989 Forwards Matl Control & Accounting Safeguards Insp Rept 70-1257/89-201.No Violations,Deviations or Declining Performance Identified ML20245E6731989-08-0303 August 1989 Forwards Insp Rept 70-1113/89-09 on 890626-30.No Violations or Deviations Noted.Rept Details Withheld (Ref 10CFR2.790 & 73.21) ML20248B4301989-07-28028 July 1989 Forwards Amend 13 to License SNM-33,authorizing Startup & Testing of Pallet Production Lines W/Depleted U & Storage of Licensed Matl in Bldg 256-2.SER Also Encl ML20248C0861989-07-27027 July 1989 Forwards Insp Rept 70-1113/89-05 on 890522-26 & 0612-15 & Notice of Violation ML20247P3351989-07-24024 July 1989 Confirms 890718 Telcon Re 890801 Mgt Meeting at Site to Discuss Results of ALARA Insps & Findings Resulting from Recent Emergency Exercise.Certain Findings of ALARA Insp Indicate Weakening in Radiological Controls at Facility ML20246H8961989-07-12012 July 1989 Informs That License Condition 1.1 of Amend SG-2 to License SNM-1257 Revised to Read as Stated,In Response to Re Changes to FNMCP ML20246J3421989-07-10010 July 1989 Advises That License Condition 1.1 to Amend SG-2 to License SNM-1097 Revised to Read as Stated ML20246E7091989-06-29029 June 1989 Forwards Insp Rept 70-1113/89-06 on 890605-09.No Violations or Deviations Noted.Util Attention Directed to Resolution of Two Drill Weaknesses ML20246C0551989-06-28028 June 1989 Forwards Insp Rept 70-1113/89-08 on 890530-0602.No Violations or Deviations Noted ML20245B4651989-06-0808 June 1989 Advises That 890515 & 30 Revs to Facility FNMCP Consistent w/10CFR70.32(c) & Acceptable.Revs Withheld (Ref 10CFR2.790) ML20247P6971989-06-0101 June 1989 Ack Receipt of 890523 Application for Renewal of License SNM-1097.License Will Not Expire Until Application for Renewal Finally Determined by NRC ML20247Q2971989-05-31031 May 1989 Advises That 881003 & 890411 Changes to Security Plan Consistent w/10CFR70.32(c) & Acceptable.Proprietary Encl Withheld (Ref 10CFR2.790) ML20247P6391989-05-30030 May 1989 Forwards Matl Control & Accounting Safeguards Insp Rept 70-0036/89-200 on 890508-12.No Violations,Deviations or Declining Performance Identified ML20244D8241989-05-25025 May 1989 Fowards Insp Rept 70-1113/89-04 on 890424-28.No Violations or Deviations Noted ML20247H6281989-05-23023 May 1989 Forwards Insp Rept 70-1257/89-02 on 890417-21.No Violations Noted ML20247M6641989-05-18018 May 1989 Forwards Environ Assessment & Finding of No Significant Impact Supporting Amend of License SNM-33,authorizing Startup Testing & Operation of New Pellet Production Lines at Hematite Facility ML20247A6741989-05-12012 May 1989 Forwards Safety Insp Rept 70-0036/89-01 on 890320-23.No Violations Noted ML20246K4771989-05-11011 May 1989 Forwards Trip Rept of a Datta 890502 Visit to Facility W/ D Ward.W/O Rept ML20246P1111989-05-10010 May 1989 Forwards Amend 12 to License SNM-33,safety Evaluation & Categorical Exclusion.Amend Authorizes Mod of Conversion Reactor 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M1451999-10-19019 October 1999
[Table view]Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl ML20217N1601999-10-0808 October 1999 Forwards Amend 11 to License SNM-1097,including Rev 5 to Physical Security Plan, Dtd Aug 1999.Safeguards Evaluation Rept,Encl ML20217C5651999-10-0404 October 1999 Requests Addl Info Needed Before Action Can Be Taken on Siemens Application for Amend to License SNM-1227 to Authorize Activities with SNM in Fuel Services Bldg.Info Specified in Encl Should Be Provided within 10 Days of Ltr ML20216J5381999-09-30030 September 1999 Forwards RAI Per 990721 Application Requesting Amend to License SNM-1227 to Add Process Waste Storage Area Consisting of Four Tanks & Ion Exchange Column to Ammonia Recovery Facility as Part of Wastewater Treatment Process ML20212J0161999-09-29029 September 1999 Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted ML20216E7441999-09-13013 September 1999 Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds ML20216F1211999-09-0808 September 1999 Forwards Insp Rept 70-1113/99-05 on 990809-13.No Violations Noted ML20217B5621999-09-0202 September 1999 Ack Receipt of 990806 Application for Amend to License SNM-1227.Acceptance Review Completed & Identified No Administrative Omissions or Deficiencies.Formal Review Anticipated Completion Date of Dec 1999 ML20211L2821999-08-31031 August 1999 Forwards Insp Rept 70-1113/99-04 on 990726-0805.No Violation Noted ML20211G1681999-08-26026 August 1999 Ack Receipt of Transmitting Application for Amend to License SNM-1227 Re Addition to Ammonium Recovery Facility.Acceptance Review Has Identified No Administrative Errors of Omissions ML20211F2491999-08-25025 August 1999 Forwards Insp Rept 70-1113/99-202 on 990802-06.No Violations or Deviations Noted ML20211F5791999-08-25025 August 1999 Forwards Insp Rept 70-1257/99-201 on 990802-05.No Violation Noted.Proprietary Document Enclosed ML20211D7611999-08-19019 August 1999 Discusses 990806 Meeting Conducted at General Electric Facility Re NRC Evaluation of Performance in Five Major Areas of Safety Operations,Safeguards,Radiological Controls, Facility Support & Licensing Activities.With Encl ML20211B3971999-08-19019 August 1999 Forwards Amend 10 to License SNM-1097,incorporating Changes to Respiratory Protection Program & Modifying Safety Condition S-1 to Include Date of 990806.SER,which Includes Categorical Exclusion Determination Also Encl ML20211B9101999-08-19019 August 1999 Forwards Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted ML20211B4291999-08-19019 August 1999 Forwards Amend 28 to License SNM-33,changing Name of Licensee to Abb Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl ML20210V0971999-08-18018 August 1999 Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning ML20210V1911999-08-13013 August 1999 Forwards Insp Rept 70-1113/99-03 on 990712-16.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records & Interviews with Personnel ML20210R8961999-08-12012 August 1999 Forwards Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representatives Records,Interviews with Personnel & Observation of Activities in Progress ML20211A3701999-08-12012 August 1999 Refers to ,Which Transmitted Rev 5 to Physical Security Plan.Rev Acceptable for Inclusion Into Plan ML20210U0561999-08-11011 August 1999 Responds to 990714 Correspondence,By Which Siemens Sent Revised Page Change to Table I-1.1, Authorized Activities. Since NRC Had Previously Authorized Activity Stated,Change to Application Is Administrative & No Action Is Required ML20210Q3781999-08-11011 August 1999 Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted ML20210T4811999-08-11011 August 1999 Informs That NRC Has Completed Acceptance Review of Application for Amend to License SNM-1227 & Have Identified No Administrative Omissions or Deficiencies.Nrc Anticipates Completing Formal Review by End of Oct 1999 ML20210G0681999-07-28028 July 1999 Concludes That Proposed Additions to Chapter 15 of License Application Submitted by Listed Ltrs Demonstrate Applicant Adherence to Conditions in Part I of License Application & That No Amend to License Necessary ML20210E9551999-07-26026 July 1999 Forwards Amend 17 to License SNM-1227,allowing Storage of Moderated Uranium Compounds in sea-land Containers.Safety Condition S-1 Has Also Been Revised to Include Date of 990527.Safety Evaluation Rept,Encl ML20209H5361999-07-15015 July 1999 Ack Receipt of 990519 Application for Amend to License SNM-1227 Re Sale of Ammonium Nitrate/Ammonium Hydroxide Solution Fertilizer.Initial Review of Application Has Identified No Administrative Omissions or Deficiencies ML20209J4461999-07-13013 July 1999 Ack Receipt of Application for Amend of Matls License SNM-1097,transmitted by .Anticipates Completion of Review by 990830 ML20209G2561999-07-12012 July 1999 Informs That Staff Has No Comments on Siemens Power Corp Ammonium Recovery Facility - Sepa Determination of non-significance in Response to ML20209E3321999-07-0606 July 1999 Discusses Results of NRC Review of GE Program for Conducting NRC Licensed Activities for Period of 970818-990514. Determined That GE Continues to Operate Facility Safely & Demonstrated Number of Strengths.Review Outline Encl ML20209D8121999-07-0606 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-1257/99-01. Corrective Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved ML20209B3031999-06-28028 June 1999 Ack Receipt of Transmitting Hydrogeologic Investigation & ground-water,soil & Stream Characterization & Ltr Transmitting Second Sampling Event Rept. Proposed Actions Appear Appropriate ML20196H8221999-06-24024 June 1999 Confirms Discussions Between R Foleck & D Ayres on 990624 Re Mgt Meeting Requested.Meeting Scheduled for 990806 at Gene Wilmington,Nc Re Results of Licensee Performance Review ML20195F9401999-06-0707 June 1999 Concurs That 990331 Proposed Changes to Richland Facility Emergency Plan Do Not Decrease Effectiveness of Plan.Nrc Will Amend License,Within Next Six Months,To Ensure Latest Rev to Plan Is Reflected ML20195D4081999-06-0404 June 1999 Forwards Partially Withheld Insp Rept 70-1113/99-201 Conducted on 990510-14.No Violations Noted.Major Areas Inspected:Facility MC&A Safeguards Program.Insp Rept Details Withheld,Per 10CFR2.790 ML20195D2871999-06-0202 June 1999 Forwards License SNM-1097,amend 9,incorporating Changes Made to Radiological Contingency & Emergency Plan.Safety Condition S-3 Has Been Revised to Reflect Changes to EP as Listed.Ser Encl ML20195C9991999-06-0202 June 1999 Forwards License SNM-33,amend 26,allowing Time Extension for Distributing Result Repts for Apr 1999,physical Inventory.Temporary Safeguards License Condition SG-1.9,is Being Issued to Read as Listed,Effective Immediately ML20217B8801999-05-25025 May 1999 Forwards Amend 8 to License SNM-1097 & Safeguards Evaluation Rept,In Response to 990225 Submittal of Certain Changes to Chapter 4.0 of Fundamental Nuclear Matl Control (Fnmc) Plan ML20207A6031999-05-21021 May 1999 Forwards Insp Rept 70-0036/99-02 on 990426-30.No Violations Noted ML20207B3681999-05-21021 May 1999 Forwards Insp Rept 70-1257/99-01 on 990322-26,0514 & 21 & Nov.Three Violations Identified Involving Two Examples of Using Transport Containers Which Did Not Meet Terms & Conditions of Applicable Certificate of Compliance ML20206U5701999-05-19019 May 1999 Confirms Cancellation of 990524 Meeting in Festus,Mo.Meeting Will Be Rescheduled in Future ML20196L2761999-05-19019 May 1999 Forwards Amend 25 to License SNM-33 & Ser.Amend Revised Fundamental Nuclear Matl Control Plan.Nrc Has Completed Review of Submitted Changes & Determined That Changes Do Not Decrease Effectiveness of MC&A Program ML20196L1391999-05-18018 May 1999 Forwards Partially Withheld Insp Rept 70-0036/99-203 Conducted on 990419-23.No Violations Noted.Major Areas Inspected:Mc&A Safeguards Program.Rept Details Withheld,Per 10CFR2.790(d) ML20196L2721999-05-18018 May 1999 Ack Receipt of ,Transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 981001-990331 ML20206L5371999-05-11011 May 1999 Forwards Amend 16 to License SNM-1227,allowing Storage of Moderated Special Nuclear Matl in sea-land Containers.Ser Also Encl ML20206G9341999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/99-01 Issued on 990323 ML20206B5411999-04-27027 April 1999 Responds to ,Requesting Addl Six Months Extension for Submission of Final Status Survey Rept for Northwest Caf Storage Area on or Before 991016.Request for Extension Until 991016,has Been Approved ML20206B0371999-04-26026 April 1999 Forwards Insp Rept 70-0036/99-202 on 990405-09.No Violations Noted ML20205R6161999-04-19019 April 1999 Confirms Meeting Scheduled for 990524 in Festus,Missouri to Discuss Current Plant Performance,Future Plant Activities, Recent Insp Activities & Progress of Nuclear Criticality Safety Upgrade Program ML20205P5241999-04-0909 April 1999 Forwards Amend 24 to License SNM-33,changing Mailing Addresses of Corporate Ofc & of Facility at Which Licensed Activity Will Be Conducted.Ser Also Encl ML20204J2981999-03-23023 March 1999 Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis 1999-09-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20141C495&oldid=3615417"