Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000237/LER-1978-030, Forwards LER 78-030/01X-1 + (00:33:52, 25 May 2025)
- 05000237/LER-1978-050, Forwards LER 78-050/01T-0 + (00:34:05, 25 May 2025)
- ML20147A720 + (00:34:09, 25 May 2025)
- NUREG-0219, Notice of Regional Meetings to Discuss Upgraded Guard Qualification & Training Requirements Per NUREG-0219. Agenda,Meeting Locations & Meeting Dates for Each Region & Registration Form Encl + (00:34:16, 25 May 2025)
- SECY-19-0117, VR-SECY-19-0117: Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors + (00:34:45, 25 May 2025)
- ML20143A106 + (00:36:13, 25 May 2025)
- CY-20-009, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 + (00:36:18, 25 May 2025)
- ML20142A277 + (00:37:29, 25 May 2025)
- ML20142A106 + (00:37:54, 25 May 2025)
- ML20141P083 + (00:39:03, 25 May 2025)
- ML20141P077 + (00:39:06, 25 May 2025)
- 05000270/LER-1985-004, :on 850422,reactor Trip Occurred on Loss of Main Feedwater.Caused by Loss of Motor Control Ctrs 2XC & 2XB Due to Two Grounded Terminal Boards.Grounded Terminal Boards Replaced + (00:39:40, 25 May 2025)
- ML20141N950 + (00:39:45, 25 May 2025)
- ML20141N858 + (00:40:09, 25 May 2025)
- 05000255/LER-1986-010, :on 860209,pipe Support Discovered Missing from Integrated Leak Rate Test Instrument Line.Cause Assumed to Be Removal of Hanger During Removal of Integrated Leak Rate Test Instrumentation Panel in 1981 + (00:41:32, 25 May 2025)
- TAC:60187 + (00:43:29, 25 May 2025)
- IR 05000271/1985040 + (00:44:32, 25 May 2025)
- TAC:48652 + (00:45:21, 25 May 2025)
- L-92-229, Forwards Rev 14 to Training & Qualification Plan, Per 10CFR50.54(p) + (00:46:31, 25 May 2025)
- 05000416/LER-1992-009, :on 920509,determined That Fuel Assemblies Exhibited Greater than Expected Closure of Compression Springs.Cause Unknown & Investigation by Siemens Nuclear Power Corp Underway + (00:46:45, 25 May 2025)
- 05000285/LER-1992-026, :on 920723,discovered That in-core Neutron Flux Monitoring Sys Alarm Limit Set Nonconservatively.Caused by Contractor Failing to Detect Error & Inadequate Verification Procedure.Recalculated Alarm Limits Installed + (00:46:49, 25 May 2025)
- 05000263/LER-1992-010, :on 920725,discovered That Four Valves Used to Mitigate Consequences of HELB Not Included in ASME Section XI Testing Program.Caused by Failure to Include Emergency Svc Water Valves in Aop.Aops Revised + (00:46:55, 25 May 2025)
- TAC:M73978 + (00:47:19, 25 May 2025)
- ML20141M328 + (00:47:31, 25 May 2025)
- NUREG-1409, 4/28/2020, Recording of Summary of Category 3 Meeting Regarding Draft NUREG-1409, Revision 1, Backfitting Guidelines.Pdf + (00:49:40, 25 May 2025)
- EPID:L-2019-LLR-0099 + (00:50:30, 25 May 2025)
- 05000293/LER-1997-009, :on 970417,RCIC Sys Became Inoperable.Caused by Gear Change in Motor Operator of RCIC Sys Flow Test Valve. RCIC Sys Procedures for Potential Rev Reviewed + (00:50:37, 25 May 2025)
- 05000346/LER-1986-003, :on 851213,discovered That Commitment to Reduce Electrical Bus Voltage Upon Receipt of Essential Bus C1 or D1 Overvoltage Alarm Not Implemented.Caused by Design Documents Not Reflecting Commitment + (00:52:50, 25 May 2025)
- ML20141K478 + (00:52:52, 25 May 2025)
- 05000346/LER-1983-039-03, /03X-1:on 830726,discovered That W/Hand Wheel for Containment Personnel Hatch Inner Door in Shut Position, Door Partially Open.Caused by Design Error.Personnel Lock Repaired & Returned to Operable Status + (00:53:07, 25 May 2025)
- 05000346/LER-1981-067-03, /03X-1:on 811022,latch on Outer Personnel Lock Area Outer Door Went to Shut Position But Did Not Shut & Inner Door Opened.Caused by Excessive Bearing Wear Due to Design Deficiency.Damaged Camrol Replaced + (00:53:11, 25 May 2025)
- ML20141K425 + (00:53:18, 25 May 2025)
- ML20141K133 + (00:54:19, 25 May 2025)
- ML20141J923 + (00:55:05, 25 May 2025)
- ML20141J889 + (00:55:10, 25 May 2025)
- ML20141J828 + (00:55:21, 25 May 2025)
- ML20141J656 + (00:56:19, 25 May 2025)
- ML20141J539 + (00:57:06, 25 May 2025)
- 05000461/LER-1997-019, :on 860929,switchgear Heat Removal Sys Fan Discharge Damper Control Circuit Routed Through MCR Was Not Per Design Basis Due to Design Error.Installed Temporary Mod to Disconnect Damper Indication to MCR + (00:57:20, 25 May 2025)
- 05000461/LER-1997-017, :on 970613,failed to Properly Calibrate MSL Radiation Monitoring.Caused Because Design Document That Provided Setpoints to Be Used Prior to Startup Did Not Address Need to Recalibrate Monitors.Revised Procedure + (00:57:25, 25 May 2025)
- 05000331/LER-1996-007, :on 961203,three MSRVs & One MSSV Failed to Meet TS Setpoints.Caused by Insufficient Tolerance Associated W/Relief Valve Setpoint Acceptance Criteria.Out of Tolerance MSRVs & MSSV Were Restored to within TS LSSS + (00:57:52, 25 May 2025)
- ML20141J391 + (00:58:06, 25 May 2025)
- 05000341/LER-1997-009, :on 970417,literal Wording of TS Requirement Had Not Historically Been Considered Prior to Proceeding Into Operational Conditions 1,2 & 3.Caused by Lack of Clarity in Ts,Ts Bases & Procedures.Revised Procedures + (00:58:51, 25 May 2025)
- ML20141H958 + (01:00:05, 25 May 2025)
- 05000295/LER-1997-010, :on 960316,reactor Trip Due to Equipment Failure Occurred.Caused by New But Defective Pneumatic Vol Booster on Valve.Pneumatic Vol Booster for 1C Main FW Regulating Valve Replaced + (01:02:00, 25 May 2025)
- 05000285/LER-1997-003, :on 970421,manual Reactor Trip Occurred Due to Steam Line Rupture Caused by Flow-Accelerated Corrosion. Replaced Ruptured Extraction Steam Pipe & Inspected Large Radius Carbon Steel Sweeps in Piping + (01:02:24, 25 May 2025)
- NUREG-0420, Forwards Sser 9 (NUREG-0420).W/o Encl + (01:02:39, 25 May 2025)
- NUREG-1065, Forwards Initial Review Comments on Aug 1985 Fundamental Matl Control (Fnmc) Plan,Partially Discussed in 851113 Meeting.Rev & Resubmittal,W/Greater Level of Detail,Needed Per NUREG-1065 + (01:08:35, 25 May 2025)
- ML20141H005 + (01:09:01, 25 May 2025)
- ML20141G991 + (01:09:05, 25 May 2025)
- ML20141G943 + (01:09:17, 25 May 2025)